Laserfiche WebLink
6' Min—w - 6 <br />(TYp) <br />3'-0" <br />OD/2 <br />10" Min <br />razaawalOWN, <br />Note 1 Below <br />-Existing- <br />Pavement <br />See Note 2 Below <br />Compact in 12 max— <br />layers to a min relative <br />compaction of 95% <br />under pavement and <br />90% outside pavement. <br />-Compact in 24" <br />layers to a min <br />compaction of <br />max — <br />relative <br />85%. <br />Compact in 6" layers <br />to a min relative <br />compaction of 90%. <br />10" Min <br />+ 20 Min <br />RIGID CONDUIT FLEXIBLE CONDUIT <br />—6 Min <br />__(Typ) <br />S-0" <br />t' <br />Vjar <br />0D+12„ <br />NOTES: <br />1. New pavement shall be 1" thicker than existing pavement, minimum <br />of 0.25 Ft. New base shall be 1" thicker than existing base, min of 0.50 Ft, <br />2. Select native material or imported granular material as approved by the Director <br />of Public Works. Backfill with materials equal to or better than the existing <br />pavement and base in quality. <br />3. Relative compaction of materials shall be tested in accordance with <br />the State of California, Dept. of Transportation Testing Manuals, test <br />method No. California 216 or 231. <br />4. All existing pavement shall be neatly cut to line prior to trench excavation. <br />5. Jetting or ponding will be permitted within the street right—of—way with <br />a 3 year bond, when approved by the Director of Public Works. <br />6. When shown by soil composition and compactobility, ninety percent (90%) <br />compaction may be used, when approved by the Director of Public Works. <br />7. Special bedding and backfill requirements may be shown on the plans or <br />specified in the special provisions. <br />Worbng for YOU <br />TYPICAL TRENCH BACKFILL `- > <br />No. Revision Description Date <br />COUNTY OF SAN JOAQUIN <br />DEPARTMENT OF PUBLIC WORKS <br />Date: DEC 2014 Std. Dwg. No. R-29 <br />