Laserfiche WebLink
6" Min <br />(TYp) <br />3'=0„ <br />Note I Below <br />-Existing- <br />Pavement <br />See Note 2 Below <br />Compact in 12" max— <br />layers to a min relative <br />compaction of 95% <br />under pavement and <br />% outside pavement. <br />-Compact in 24" max - <br />layers to a min relative <br />compaction of 85%. <br />Compact in 6" layers <br />t0 a min relative <br />compaction of 90%. <br />10" Min <br />6" F-•-6" Min <br />(TYP01) <br />+ 20" Min <br />RIGID CONDUIT FLCa;IBLE CONDUIT <br />12" <br />0" Min <br />NOTES: <br />1. New pavement shall be 1" thicker than existing pavement, minimum <br />of 0.25 Ft. New base shall be 1" thicker than existing base, min of 0.50 Ft. <br />2. Select native material or imported granular material as approved by the Director <br />of Public Works. Backfill with materials equal to or better than the existing <br />pavement and base in quality. <br />3. Relative compaction of materials shall be tested in accordance with <br />the State of California, Dept. of Transportation Testing Manuals, test <br />method No. California 216 or 231. <br />4. All existing pavement shall be neatly cut to line prior to trench excavation. <br />5. Jetting or ponding will be permitted within the street right• -of -way with <br />a 3 year bond, when approved by the Director of Public Works. <br />6. When shown by soil composition anti compactability, ninety percent (90%) <br />compaction may be used, when approved by the Director of Public Works. <br />7. Special bedding and backfill requirements may be shown on the plans or <br />specified in the special provisions. <br />Working for YOU <br />TYPICAL TRENCH BACKFILL <br />COUNTY O.F' SAN JOAQUIN <br />DEPARTMENT OF PUBLIC WORKS <br />Date; DEC 2014 Std. Dwg. No. R-29 <br />