Laserfiche WebLink
.5'eSq•,eneee%seefee0":SSeeAS4e%SLeee44.eS:eSe <br />r � � <br />10" Min <br />+ 20" Min <br />R1GiD CONDUIT <br />ee Note 1 Below <br />�Existin <br />Pavementnt <br />See Note 2 Below <br />Compact in 12" max -- <br />layers to a min relative <br />compaction of 95% <br />under pavement and <br />% outside pavement. <br />-Compact in 24" `max — <br />layers to a min relative <br />compaction of 85%. <br />-Compact in 6" layers <br />to a min relative <br />compaction of 90%. <br />10" Min <br />10" Min <br />•eeeeeeeec,eeeeeeee,u��e, <br />OD <br />+ 20 Min <br />FLEY_IBLE CONDUIT <br />IJOTES: <br />1. New pavement shall be 1" thicker than existing pavement, minimum <br />OD+ 12" <br />0" Min <br />of 0.25 Ft. New base shall be 1 thicker than existing base, min of 0.50 Ft. <br />2. Select native material or imported granular material as approved by the Director <br />of Public Works. Backfill with materials equal to or better than the existing <br />pavement and base in quality. <br />3. Relative compaction of materials shall be tested in accordance with <br />the State of California, Dept. of Transportation Testing Manuals, test <br />method No. California 216 or 231. <br />4. All existing pavement shall be neatly cut to line prior to trench excavation. <br />5. Jetting or ponding will be permitted within the street right—of—way with <br />a 3 year bond, when approved by the Director of Public Works, <br />6. When shown by soil composition and compactability, ninety percent (90%) <br />compaction may be used, when approved by the Director of Public Works. <br />7. Special bedding and backfill requirements may be shown on the plans or <br />specified in the special provisions. <br />�C`OUNTY OF' SAN .TOApUIN <br />DEPARTMENT OF PUBLIC \CORKS <br />Date: DEC 2014 <br />