CONSTRUCTION NOTES <br />1. ΤΗε CONTRACTOR SHALL CONTACT ΤΗΕ ADJACENT <br />PROPERTY OWNERS Α Ml~~IMUM OF 10 DAYS ΙΝ <br />ADVANCE AND AGAIN 2 DAYS ΙΝ ADVANCE or <br />CONSτRUCTION Ατ τΗΕ WORK SITE. <br />2. ALL τRAFFIC CONτROL DEVICES SHALL ΒΕ ΙΝ PLACE <br />BEFORE WORK IS sτARτED. DEVICES ΝΟ LONGER <br />REQUIRED SHALL ΕΕ RΠιiOVED AS SOON AS POSSIBLE. <br />3. PEDESτRΙAN τRAFFIC MUSτ ΒΕ ΜΑΙΝτΑΙΝΕD Ατ ALL <br />TIMES. PEDESτRΙANS ΜΑΥ ΒΕ RELOCAτED ΟΝτΟ PRIVAτE <br />PROPERTY WΙτΗ OWNERS PERlλlSSION ONLY . <br />4. ΝΟ EQUIPMENT OR MATERIALS SHALL ΒΕ STORED OR <br />ΡΕRΜΙΠΕD το sτAND UNPROTECTED WHERE τRAFF IC IS <br />MAINTAINED UNLESS ΙΤ IS ALLOWED ΒΥ CITY TRAFFIC <br />ENGINEERING ΙΝ WRITING. <br />5. ΝΟ EOUIPMENT OR MATERIALS SHALL ΒΕ STORED ΟΝ <br />ROAD SURFACE DURING NON -WORKING PERIODS UNLESS <br />ιτ IS ALLOWED ΒΥ CITY/SτATE/COUNTY τRAFFIC ENGINEER ΙΝ WRITING. <br />6. ΗΟ EQUIPMENT OR MATERIALS SHALL ΒΕ STORED ΟΝ <br />13. ΤΗΕ LOCATIONS AND SAFΈ CROSSINGS OF All FOREIGN <br />UTILITIES IS τΗΕ SUBCONτRACτOR'S RESPONSIBILITY. <br />HAND DIG WHERE REOUIRED. <br />14. Α 12" SEPARATION BETWEEN WAVE BROADBAND CONDUJτ <br />AND ΟτΗΕR UTILITIES \'IILL ΒΕ ΜΑΙΝτΑΙΝΕD Ατ CROSSINGS. <br />15. ΑΤ ΤΗΕ END OF EACH \VORK DAY, CONDUIT CAPS \VILL <br />ΒΕ PLACED ΟΝ ALL VACANτ DUCτs. <br />16. ΤΗΕ REMOVAL, STORAGE, AND REPLACEMENT OF ALL <br />SHRUBBERY SHALL ΒΕ τΗΕ RESPOSIBILITY or τΗΕ <br />SUBCONTRACTOR. <br />17. CONDUΙτS WILL ACCESS MANHOLES ΙΝ Α SτRAIGHτ LINE <br />το FACILITATE CABLE INSτALLATION. <br />18. PLACE 12" or 3/4" GRAVEL BASE BED Ατ ALL <br />HANDHOLE/SPLICEBOX LOCATIONS. POUR 2 SACK <br />SΜΟΟτΗ FINJSHED CONCRETE SLAB. FOR BASE, <br />MORTAR ALL SEAMS, JOINTS AND CONDUIT OPENINGS. <br />GENERAL NOTES <br />1. ALL WORK SHALL COMPLY WITH APPLJC ABLE LOCAL AND <br />REGULAτORY AGENCIES INCLUDING, eυτ Νοτ LIMITED τ ο <br />OSHA, ETC. GENERAL NOTES SHALL APPLY το ALL DRAWINGS. <br />2. EXISTING UTILITIES ARE SHOWN ΙΝ APPROXJMATE <br />LOCATIONS. SOME EXISTING UTILITIES ΜΑΥ ΝΟτ ΒΕ <br />DEPICTED ΟΝ τΗΙS PLAN. <br />3. PREFERRED METHOD OF CONSTRUCTION WILL ΒΕ <br />DIRECT10NAL BORING. SOME TRENCHING ΜΑΥ ΒΕ <br />REQUIRED ΙΝ SPECIFIED LOCATIONS. <br />4. ΙΤ WILL ΒΕ ΤΗΕ RESPONSIBJLITY OF ΤΗΕ SUBCONTRACTOR <br />το MAINTAIN CONSTRUCTION AS-BUILT DRAWINGS AND <br />PRESE Nτ Α COMPLETE SET or DRAWΙNGS το WAVE wιτΗ ιΝ <br />14 DAYS or WORK COMPLETION. <br />SIDEWALK UNLESS ΙΤ IS ALLOWED Β Υ CITY/STATE/ COUNTY EN GINEER. 19. ΜΙΝΙΜΙΖΕ NUMBER or POτHOLES VΙΙΤΗΙΝ DRIP LΙΝΕ or Α 5. APPROXIMATE LOCATIONS OF WAVE SPUCE BOXES ARE <br />SHOWN ΟΝ τΗ Ε PLANS. ΕΧΑCτ FINAL LOCATION OF <br />SPLICE BOXES SHALL ΒΕ DETERMINED ΙΝ τΗΕ FIELD <br />AFTER ALL EXISTING UTILITIES ΙΝ τΗΕ AREA or \'IORK <br />HAVE ΒΕΕΝ LOCATED. COORDINAτE FINAL SPLJCE ΒΟΧ <br />LOCATIONS WITH WAVE. <br />7. EXCAVATION MATERIALS SHALL ΒΕ STORED AWAY FROM <br />τΗΕ PAVED ROADWAY WHENEVER POSSIBLE. ALL SPILLED <br />MATERIAL SHALL ΒΕ REMOVED το AVOID SLIPPERY <br />CONDITIONS. <br />8. EXISTING SIGNS, DELINEATION'S, GUARDRAILS, MARKERS, <br />τREES, SHRUBS, FENCES , WALKS, STEPS, ETC. τΗΑτ ARE <br />DISTURBED ΒΥ THIS CONSTRUCTION SHALL ΒΕ REPLACED <br />OR RESτORED το THEIR ORIG]NAL CONDITION. <br />9. CONτRACτOR SHALL VERIFY ΕΧΑCτ LOCATION AND <br />ELEVATION or ALL EXISTING UTILITIES ΙΝ AREA or <br />WORK PRIOR το CONSτRUCTION. CALL UNDERGROUND <br />SERVICE ALERτ (USA, 1 -800-227-2600) AND ALL <br />OTHER UTILITY COMPANIES ΑΤ LEAST 2 WORKING <br />DAYS (ΒUτ ΝΟτ MORE ΤΗΑΝ 14 CALENDAR DAYS) <br />PRIOR το CONSτRUCTION. <br />1 Ο. CONTRACTOR SHALL HAND DIG AND USE OOREME CARE <br />\VHEN WORKING ΙΝ CLOSE PROXIMITY το EXISTING <br />UTILΙTIES. <br />11. τRAFFIC SIGNAL DETECτOR LOOP CIRCUJτS ARE ΝΟτ <br />SHOWN. CONτRACτOR SHALL LOCATE ALL τRAFFIC <br />SIGNAL DETECTOR LOOP CIRCUITS PRIOR το ΑΝΥ <br />TRENCHING OR BORING. All TR AFFIC LOOP DETECTOR <br />CIRCUITS SHALL ΒΕ ΜΑΙΝτΑΙΝΕD AND PROTECTED. <br />NOTIFY TRAFF1C DEPARTLf ENT 48 HOURS PRIOR το <br />ΑΝΥ \VORK ΙΝ ηιεsε AREAS. <br />12. TRENCH το PLACE <br />(2) 2" SCH 80 HDPE Ε/ΥΙ (1) 12 AWG τRACER WIRE <br />12Α. &ORE ΤΟ PLACE <br />(2) 2" SCH 80 HDPE E/W (1) 12 AWG τRACER \VIR E <br />SτREET τRΕΕ. <br />20. CONTRACTOR IS RESPONSIBLE τ ο ARRANG E Α PRE- <br />CONSTRUCTION MEETING wιτΗ τΗΕ CITY JNSPECτORS <br />Ατ LEASτ 72 HOURS BEFORE sτARTING WORK. <br />21. SPARE CABLE ιs το ORDERED ΑΤ ΤΗΕ RATE OF 5¾ <br />OR 1000' WHICH EVER IS GREATER BASED UPON τΗΕ τοτΑL <br />ORDER , OR PER REEL, Ατ τΗΕ DISCRETION or RCN AND <br />6. DEPτHS or EXISTING UTILITIES SHOWN ΟΝ PLANS ARE <br />APPROXIMATE AND WILL ΒΕ VERI FIED ΙΝ FIE LD PRJOR <br />το CONSτRUCTION. <br />wιτΗ CONSIDERATION or AVAILABLE sτοcκ. <br />22. SJGNAL WIRE , BORED CONDUl τS SHALL INCLUDE Α τRACER/SIGNAL <br />WIR E OR οτΗΕR METHOD FOR FΑCΙLΙτΑΤΙΝG LOCATION or τΗΕ <br />COMPLETION or INSτALLATIDN. <br />23. BORING PJτS, EXCAVATION AND RESτORATION OF BORING ΡΙτS <br />SHALL ΒΕ ΙΝ ACCORDANCE ΥΙΙτΗ τΗΕ CITY/SτATE/COUNTY SτANDARDS FOR <br />UTILITY EXCAVATIONS AN D LO CATED το τΗΕ SATISFACTION or <br />τΗΕ CITY/SτAτE/COUNTY ENGINEER. <br />24. REMOVE AND REPLACE SIDEWALKS, CURBS AND GUΠERS <br />ΑΤ CONSTRUCTION JOJNTS, SEE UND ERGROUND TYPlCALS. <br />25. MINIMUM 5 Π. RADIUS ΟΝ ALL BENDS UNLESS <br />oτHERWISE ΝΟτΕD. <br />26. Ι.tλΙΝτλΙΝ 36" ΗΟRΙΖΟΝτλL 1: 18" VERTICλL SEPλRATION FROl.t λLL <br />STORW DRAJN FλCILITIES. <br />27. UλΙΝΤΑΙΝ 1' WIN VERTICλl 1: 5' UIN HORIZONTAL CL.EλRANCE <br />WITH λll SλSD SEWR FλC I UTIES. <br />28. CΟΝτλcτ CITY/SτλτE/CO UNTY INSPECτOR FOR PRECONSτRUCTION NEETING. <br />WλΙΝΤλΙΝ 5' VERTICAL λΝD 10' HORIZONTAL ClEλRλNCE FROW <br />λLL REGIONλL SλΝ FλCJLITIES. <br />CUILOINCCnuronNIA <br />,~-, <br />SAFETY <br />1. ΤΗΕ CONTRACTOR IS RESPONSIBLE FOR JOB -SITE SAFETY AND SHALL <br />ΒΕ RESPONSIBLE FOR ALL LIABILITY Jj,;POSED ΒΥ τΗΕ LAW FOR PERSO l!AL <br />INJURY OR PROPERTY DAMAGE WHICH Μ ΑΥ ARISE or τΗΕ WORK <br />PERFORMED UNDER ΤΗΕ EHCROACHMEI-IT PERMIT, OR WHICH ΜΑΥ ARISE <br />ουτ or τΗΕ SAFETY FAILURE ΟΝ τΗΕ ΡΑRτ or τΗΕ ΡΕRΜΙΠΕΕ το <br />PERFORl.f HIS OBLIGATIONS UNDER τΗΙS ΡΕRΜιτ ΙΝ RESPECτ το <br />t.lAINTENANCE OF ΤΗΕ ENCROACHMENT. <br />2 . ALL TRAFFIC CONTROL SHALL CONFORM το ΤΗΕ CURRENT CALIFORNIA <br />DΕΡΑRτΜΕΝτ or τ RANSPORτATΙOfJ ("LfANUAL or TRAFFIC coNτROLS <br />FOR CO~ISTRUCϊlON AND ΜΑΙΝΤΕΝΑΝCΕ WORK ΖΟΝΕ") {"MANUAL OF <br />\-VARNING SIGNS, LIGHTS AND DEVICES FOR USE ΙΝ PERFORMANCE OF <br />WORK UPON l·IIGH\'IAYS"). <br />3. ALL EXCAVATIONS SHALL CONFORM ΤΟ τΗΕ REQUIREMENτ or τΗΕ <br />STATE OF CALIFORNIA DIVISION OF OCUPATIONAL SAFETY AND <br />HEALTH . τΗΕ ΡΕRΜΙΠΕΕ ΜΑΥ ΒΕ REQUIRETO οaτΑΙΝ Α "PER~IT το <br />EXCAVATE" FROM τΗΕ DIVISJON or INDUSτRΙAL SAFETY, DΕΡΑRτ,ιεΝ, <br />OF Ι NDUSTRIAL RELATIONS , STATE OF CAUFORNIA. <br />4 . CONTRACTOR SHALL FURNISH AND ΜΑΙΝ ΤΑΙΝ ALL DEVICES FOR <br />PEDESτRJAN AND VEHJCULAR τRAFFIC SAFETY. UNSAFE CONDJTIONS <br />νιιιι ΒΕ CORRECτED ΒΥ CITY PE RSONNEL (OR AGENτs τHEREOF) AND <br />ΤΗΕ ΡΕRΜΙΠΕΕ \Ί'ILL ΒΕ BILLED FOR ALL EXPENSE INCURRED, OR <br />COSTS SHALL ΒΕ RECO VERED FR OM CASH DEPOSJTS HELD FΌR SUCH <br />PURPOSES. <br />~ Ρrοιό!c\ Q.,.,.,,. ( 2500 Daniels sι Manteca <br />CA !J5J3 7 <br />κ-.w, below, <br />caιι ..... ,. .. <br />c.ιι,....,._,..,_οaι,"' <br />AlίLV.tt..0.,_ ... , .... ,_,c,.,oιιι., <br />811/1-800-227-2600 <br />w αιιe <br />./ J:;: ι (.ί ιru:: /J,~e . <br />ti'.,,:Hn . C,'. :JS6:'~ <br />f-;-1. (9 16) :?·)7-J25ί <br />ΝΙΑ <br />.ιoii,: <br />3027(; <br />Ιοf 1 <br />1 <br />1