My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2020_PS-2000001 thru PS-2000500_ - PS-2000423
PublicWorks
>
- PUBLIC SERVICES
>
PERMITS & DEVELOPMENT
>
Encroachment(EP)/Driveway(DW) Permits
>
2020
>
PS-2000001 thru PS-2000500
>
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2020_PS-2000001 thru PS-2000500_ - PS-2000423
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2023 2:31:52 PM
Creation date
4/17/2023 2:30:18 PM
Metadata
Fields
Template:
Permits_Development
DocName
PS-2000423
Category07
Encroachment(EP)/Driveway(DW) Permits
Year2
2020
Notes2
N/S of Kettleman Ln. 335' W/O Alpine Rd.
Address
PO Box 3031, Modesto,CA 95353
Application
Pacific Gas & Electric-Modesto
Type
Aerial Work
Supplemental fields
Cross Ref
PWP730052
Type (2)
Encroachment Permit (EP)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
PS-2000423 <br />SPECIAL CONDITIONS FOR <br />PG&E -KETTLEMAN LN . -ΡΜ# 31472262 <br />ENCROACHMENT PERMIT <br />Febr ιι ary 1 Ο , 2020 <br />1. Maintain traffic controls for all roads. Traffic control delays shall not exceed 1 Ο minutes. <br />Two-way traffic shall be maintained during non-working hours with excavated areas backfilled or <br />plated. During working hours, two-way traffic control shall be maintained with one lane open and <br />appropriate flaggers . <br />2. Access to all properties shall be maintained at all times except when work is occurring at the <br />access point. Minimal delays will be allowed to provide access within the work zone area. <br />Driveway access shall be fully restored at the end of each workday. Driveways disturbed by the <br />contractor shall be replaced with in-kind or better materials . <br />3. Residents and businesses shall be notified in writing, as approved by the County, 48 hours in <br />advance of any impacts to their access . <br />4 . Any areas where parking is to be restricted shall have signs noting the restrictions in place at <br />least 48 hours in advance. <br />5. School Buses and Emergency Service Vehicles shall be passed through the work zone with <br />minimal delays. <br />6. Existing fences shall not be removed without written consent of the property owner. Such consent <br />shall be submitted to the County prior to the removal. Fences removed shall be restored with in- <br />kind or better materials . Restored fences shall not encroach into County right-of-way. <br />7. Work shall not be permitted within the San Joaquin County right-of-way between November 1 and <br />March 31 without prior authorization from the San Joaquin County Department of Public Works <br />Field Engineering Division, contact them at 209-953-7421. <br />8 . ΑΙΙ destroyed or obliterated pavement markings must be replaced in kind by the permittee . Typical <br />pavement markings include but not limited to lane lines, centerlines, stop and stop ahead <br />legends, limit lines, raised pavement markers and miscellaneous delineators . <br />9. The Permittee is responsible for the preservation of survey monuments located within the area of <br />work herein permitted . Prior to the start of construction, survey monuments that potentially may <br />be disturbed shall be located and referenced by a Licensed Land Surveyor, and a Corner Record <br />filed with the County Surveyor. Any Survey Monuments disturbed during the course of <br />construction shall be reestablished by a Licensed Land Surveyor and another Corner Record filed <br />with the County Surveyor. (Land Surveyors' Act Section 8771) <br />1 Ο . ΑΙΙ pipe and pipeline related facilities including, but not limited to, valves, utility boxes and vaults , <br />and frames and covers shall be maintained by PG&E , including any facilities that are abandoned <br />in place. PG&E shall be responsible for any and all costs associated with the removal , relocation <br />and/or adjustment of these facilities as determined by the County at PG&E's expense . (Streets <br />and Highways Code Section 1463)
The URL can be used to link to this page
Your browser does not support the video tag.