My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2020_PS-2000001 thru PS-2000500_ - PS-2000433
PublicWorks
>
- PUBLIC SERVICES
>
PERMITS & DEVELOPMENT
>
Encroachment(EP)/Driveway(DW) Permits
>
2020
>
PS-2000001 thru PS-2000500
>
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2020_PS-2000001 thru PS-2000500_ - PS-2000433
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2023 2:42:30 PM
Creation date
4/17/2023 2:38:40 PM
Metadata
Fields
Template:
Permits_Development
DocName
PS-2000433
Category07
Encroachment(EP)/Driveway(DW) Permits
Year2
2020
Notes2
N/S of schulte Rd. 2050' W/O Quality Rd.
Address
PO Box 3031, Modesto,CA 95353
Application
Pacific Gas & Electric-Modesto
Type
Traffic Control Devices
Supplemental fields
Cross Ref
PWP730052
Type (2)
Encroachment Permit (EP)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
PS-2000433 <br />SPECIAL CONDITIONS FOR <br />PG&E -SCHULTE RD . -ΡΜ# 35064909 <br />ENCROACHMENT PERMIT <br />Febrιιa r y 1 ·1, 202 0 <br />1. Maintain traffic controls for all roads. Traffic control delays shall not exceed 1 Ο minutes . <br />Two-way traffic shall be maintained during non-working hours with excavated areas backfilled or <br />plated. During working hours, two -way traffic control shall be maintained with one lane open and <br />appropriate flaggers . <br />2. Access to all properties shall be maintained at all times except when work is occurring at the <br />access point. Minimal delays will be allowed to provide access within the work zone area . <br />3. Residents and businesses shall be notified in writing, as approved by the County, 48 hours in <br />advance of any impacts to their access . <br />4 . Any areas where parking is to be restricted shall have signs noting the restrictions in place at <br />least 48 hours in advance. <br />5. School Buses and Emergency Service Vehicles shall be passed through the work zone with <br />minimal delays. <br />6 . Work shall not be permitted within the San Joaquin County right-of-way between November 1 and <br />March 31 without prior authorization from the San Joaquin County Department of Public Works <br />Field Engineering Division, contact them at 209-953-7 421. <br />7. ΑΙΙ destroyed or obliterated pavement markings must be replaced in kind by the permittee . Typical <br />pavement markings include but not limited to lane lines, centerlines, stop and stop ahead <br />legends, limit lines, raised pavement markers and miscellaneous delineators. <br />8. The Permittee is responsible for the preservation of survey monuments located within the area of <br />work herein permitted . Prior to the start of construction, survey monuments that potentially may <br />be disturbed shall be located and referenced by a Licensed Land Surveyor, and a Corner Record <br />filed with the County Surveyor. Any Survey Monuments disturbed during the course of <br />construction shall be reestablished by a Licensed Land Surveyor and another Corner Record filed <br />with the County Surveyor. (Land Surveyors' Act Section 8771) <br />9. County roads shall be kept clean from mud and debris at all times along the access points and <br />work zone areas during entire project. ΑΙΙ standard roadway striping and signage shall be clearly <br />visible, maintained and restored throughout the construction zone during and after the project. <br />1 Ο . ln addition to standard dust control measures, streets shall be maintained in a clean condition, <br />free of dirt, mud and debris during construction activities. The contractor shall provide daily, and <br />as determined to be necessary by County inspectors, street sweeping using a modern <br />mechanical or vacuum-assisted street sweeper. <br />11. The contractor shall not conduct construction operations in rain or heavy fog conditions .
The URL can be used to link to this page
Your browser does not support the video tag.