My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2020_PS-2000001 thru PS-2000500_ - PS-2000448
PublicWorks
>
- PUBLIC SERVICES
>
PERMITS & DEVELOPMENT
>
Encroachment(EP)/Driveway(DW) Permits
>
2020
>
PS-2000001 thru PS-2000500
>
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2020_PS-2000001 thru PS-2000500_ - PS-2000448
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2023 2:59:30 PM
Creation date
4/17/2023 2:58:02 PM
Metadata
Fields
Template:
Permits_Development
DocName
PS-2000448
Category07
Encroachment(EP)/Driveway(DW) Permits
Year2
2020
Notes2
N/S of Kettleman Ln. 240' W/O Alpine Rd.
Address
PO Box 3031, Modesto,CA 95353
Application
Pacific Gas & Electric-Modesto
Type
Aerial Work
Supplemental fields
Cross Ref
PWP730052
Type (2)
Encroachment Permit (EP)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Special Conditions for <br />ENCROACHMENT PERMIT <br />-2- <br />11. All future maintenance of the pipeline and related facilities within the County right-of-way will <br />require a San Joaquin County Encroachment Permit, <br />12. County roads shall be kept clean from mud and debris at all times along the access points and <br />work zone areas during entire project. All standard roadway striping and signage shall be clearly <br />visible, maintained and restored throughout the construction zone during and after the project. <br />13. In addition to standard dust control measures, streets shall be maintained in a clean condition, <br />free of dirt, mud and debris during construction activities. The contractor shall provide daily, and <br />as determined to be necessary by County inspectors, street sweeping using a modern <br />mechanical or vacuum -assisted street sweeper. <br />14. The contractor shall not conduct construction operations in rain or heavy fog conditions. <br />
The URL can be used to link to this page
Your browser does not support the video tag.