My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2020_PS-2000501 thru PS-2001000_ - PS-2000524
PublicWorks
>
- PUBLIC SERVICES
>
PERMITS & DEVELOPMENT
>
Encroachment(EP)/Driveway(DW) Permits
>
2020
>
PS-2000501 thru PS-2001000
>
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2020_PS-2000501 thru PS-2001000_ - PS-2000524
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2023 3:42:39 PM
Creation date
4/17/2023 3:40:43 PM
Metadata
Fields
Template:
Permits_Development
DocName
PS-2000524
Category07
Encroachment(EP)/Driveway(DW) Permits
Year2
2020
Notes2
East and West of 15999 Corral Hollow Rd.
Address
7000 East Ave., Bldg. 551E, Livermore,CA
Application
Lawrence Livermore Labs-Nate Benedict
Type
Install Solar Powered Signs
Supplemental fields
Cross Ref
PWP110005
Type (2)
Encroachment Permit (EP)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
PS-2000524 February 2·1, 2020 SPECIAL CONDITIONS FOR LAWRENCE LIVERMORE LABS -CORRAL HOLLOW RD. ENCROACHMENT PERMIT 1. Maintain traffic controls for all roads. Traffic control delays shall not exceed 10 minutes. Two-way traffic shall be maintained during non-working hours with excavated areas backfilled or plated. During working hours, two-way traffic control shall be maintained with one lane open and appropriate flaggers. 2. Access to all properties shall be maintained at all times except when work is occurring at the access point. Minimal delays will be allowed to provide access within the work zone area. Driveway access shall be fully restored at the end of each workday. Driveways disturbed by the contractor shall be replaced with in-kind or better materials. 3. Residents and businesses shall be notified in writing, as approved by the County, 48 hours in advance of any impacts to their access. 4. Any areas where parking is to be restricted shall have signs noting the restrictions in place at least 48 hours in advance. 5. School Buses and Emergency Service Vehicles shall be passed through the work zone with minimal delays. 6. Work shall not be permitted within the San Joaquin County right-of-way between November 1 and March 31 without prior authorization from the San Joaquin County Department of Public Works Field Engineering Division, contact them at 209-953-7421. 7. All destroyed or obliterated pavement markings must be replaced in kind by the permittee. Typical pavement markings include but not limited to lane lines, centerlines, stop and stop ahead legends, limit lines, raised pavement markers and miscellaneous delineators. · 8. The Permittee is responsible for the preservation of survey monuments located within the area of work herein permitted. Prior to the start of construction, survey monuments that potentially may be disturbed shall be located and referenced by a Licensed Land Surveyor, and a Corner Record filed with the County Surveyor. Any Survey Monuments disturbed during the course of construction shall be reestablished by a Licensed Land Surveyor and another Corner Record filed with the County Surveyor. (Land Surveyors' Act Section 8771) 9. County roads shall be kept clean from mud and debris at all times along the access points and work zone areas during entire project. All standard roadway striping and signage shall be clearly visible, maintained and restored throughout the construction zone during and after the project. 10. In addition to standard dust control measures, streets shall be maintained in a clean condition, free of dirt, mud and debris during construction activities. The contractor shall provide daily, and as determined to be necessary by County inspectors, street sweeping using a modern mechanical or vacuum-assisted street sweeper. 11. The contractor shall not conduct construction operations in rain or heavy fog conditions.
The URL can be used to link to this page
Your browser does not support the video tag.