Laserfiche WebLink
SPECIAL PROVISIONS Winter Weather Utility Work 1. SUPERVISION: The utility company (permittee) shall furnish full-time supervision of all work to insure compliance with the permit provision. 2. START OF WORK: No work within the County right-of-way shall be started until the utility company representative has made an evaluation of weather conditions and has determined the work can be accomplished under the provisions of the permit. 3. CLEAN PAVEMENT: Dirt and mud shall not be deposited on the pavement outside the area of work, and if inadvertently tracked onto the road travel way shall be removed immediately. 4. DAILY RESTORATION: Private driveways and road intersections shall be restored daily. 5. WEATHER-TIGHT CONDITIONS: All trenches shall be filled and compacted, ditches and other drainage facilities regarded and opened, and the entire work area restored to weather-tight condition prior to any ram. X:\ENCROACHMENTS\General Provisions (Encroachment Permits)\Winter Weather Provisions.docx