Laserfiche WebLink
Special Conditions for <br />ENCROACHMENT PERMIT <br />-2 - <br />11. ΑΙΙ future maintenance of the pipeline and related facilities within the County right-of-way will <br />require a San Joaquin County Encroachment Permit. <br />12. County roads shall be kept clean from mud and debris at all times along the access points and <br />work zone areas during entire project. ΑΙΙ standard roadway striping and signage shall be clearly <br />visible, maintained and restored throughout the construction zone during and after the project. <br />13. ln addition to standard dust control measures, streets shall be maintained in a clean condition, <br />free of dirt, mud and debris during construction activities . The contractor shall provide daily, and <br />as determined to be necessary by County inspectors , street sweeping using a modern <br />mechanical or vacuum-assisted street sweeper. <br />14 . The contractor shall not conduct construction operations in rain or heavy fog conditions .