Laserfiche WebLink
NOTES: <br />1, <br />2 <br />3 <br />L! <br />If the distance between cross—cuts are less then 150 the entire area between <br />corss—cuts shall be planed and resurfaced with one (1) inch of Asphalt Concrete. <br />The resurfacing requirements shall be in addition to County Standard Drawing No. <br />R-29. <br />Resurfacing for Bell Holes shall meet these <br />the shoulder or lane, only that area shall b <br />If cross—cutting is performed on Local Roac <br />Coat for that half of the roadway containinc <br />resurfacing. Section 2-5.03 (B-2). <br />Paved Shoulder <br />c� <br />requirements, If excavation occurs within <br />resufaced as shown. <br />s at intervals less then 150 a Sea <br />the trench can be used in lieu of <br />9. <br />Mofflov <br />co)O <br />U <br />c <br />O <br />� <br />a <br />� <br />� <br />VOrr <br />U <br />U� <br />U <br />d <br />C: <br />O <br />O <br />� <br />cU <br />O <br />c.3 <br />� <br />Q <br />9. <br />Mofflov <br />co)O <br />U <br />O <br />� <br />U <br />� <br />VOrr <br />U <br />0 <br />i <br />U <br />TRENCH CUTTING PO�.Vta Approved by: <br />CROSS CUTTING OF <br />COUNTY ROADWAYSNo, Revision Descri <br />COUNTY OF SAN JOAQUIN <br />DEPARTMENT OF PUBLIC WORKS <br />Date: DEC 2014 Std, Dwg. No <br />