Laserfiche WebLink
DRIVEWAY ENCROACHMENT PERMIT <br /> <br />To: JERED CHAVEZ <br /> <br />Location: 15068 E JAHANT RD <br /> <br />Permit No: PS-2000234 <br />Start Date: 01/29/2020 <br />Exp. Date: 01/28/2021 <br /> <br />APN No: 02108005 <br /> <br />In compliance with your request of 01/29/2020, and subject to all the terms, conditions and restrictions written below or pruned as general or <br />special provisions on any part of this form. <br />Permission is hereby granted to construct One driveway w/o pipe shown on <br />Permit Application No. PS -2000234 Quad: NE <br /> <br />Jobsite shall be kept in a safe condition at all times by removing daily any excess du -t or debris which might be a hazard to pedestrian and/or <br />vehicular traffic. Adequate lights, signs and barricades shall be placed and maintained by the Pennittee for the protection of the public in <br />accordance with the current Caltrans Standard Specifications. <br /> <br />A(n) (SEE STAMP) SEE STAMPinside diameter per section 62 of the current Caltrans Standard Specifications, ALTERNATIVE PIPE <br />AND PIPE ARCH CULVERTS, shall be installed in roadside drainage ditch for drainage flow maintenance and shall be of sufficient length to <br />clear toe of approach fill or headwalls. <br /> <br />The entire area of driveway approach(es),include flares for turning and /or paved frontage(s), from the edge of roadway pavement to <br />right -of --way (front property) line shall be surfaced with a two inch (2") minimum of asphalt concrete over a (4 inch) Four inch minimum of <br />compacted layer of three-quarter inch (3/4") maximum size aggregate base material (road gravel) conforming to Class 2 Aggregate Base <br />specified in Section 26 of the current Caltrans Standard Specification, or with a four inch (4") minimum of portland cement concrete. <br /> <br />If portland cement concrete pavement is installed, expansion joints shall be provided at the edge of <br />pavement and along property line. Surface grades of approach(es) and/or to open ends of pipe. No ponding or puddles on pavement surface shall be allowed. <br /> <br />The field Engineering Division of this office shall receive no less than forty-eight (48) hours notice prior to beginning of any work <br />within the County right-of-way. After completion of the work permitted herein, all debris, lumber, barricades or any excess <br />material shall be removed and the jobsite left in a neat workmanlike condition. The Permittee shall fill out and mail notice of <br />completion provided by Grantor. <br /> <br />Driveway(s) shall be complete prior to occupancy of the residence, <br />but not to exceed expiration date. <br /> <br />KRIS BALAJI, Director <br />Department of Public Works <br />Permit Section <br /> <br />FORMS: R-17, SS/WW <br />