My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2020_Driveway Permits_PS-2000000 thru PS-2000500_ - PS-2000383
PublicWorks
>
- PUBLIC SERVICES
>
PERMITS & DEVELOPMENT
>
Encroachment(EP)/Driveway(DW) Permits
>
2020
>
DRIVEWAY PERMITS
>
PS-2000000 thru PS-2000500
>
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2020_Driveway Permits_PS-2000000 thru PS-2000500_ - PS-2000383
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/18/2023 4:04:28 PM
Creation date
4/18/2023 4:02:04 PM
Metadata
Fields
Template:
Permits_Development
DocName
PS-2000383
Category07
Encroachment(EP)/Driveway(DW) Permits
Year2
2020
Address
PO Box 590218, Stockton,CA 95269
Application
Line 2 Design
Type
Driveway Encroachment
Supplemental fields
APN
08713042
Cross Ref
PWP110005
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
T o: <br />Location: <br />COIU�IiTY OF SAN JC►AQUIN <br />DEPARTMENT OF PUBLIC WORKS <br />P.O. BOX 1810-1810 E. HAZELTON AVENUE <br />STOCKTON, CALIFORNIA 95201 <br />(209) 468-3000 <br />FAX 4 (209) 468-9324 <br />Permit No: P6-2000383 <br />Date Issued: 02/18/2020 <br />Exp. Date: 02/17/2021 <br />Project No: PWP110005 <br />APN No: 08713042 <br />DRIVEWAY EN�CIZOA�CHME1911 1EINMIT <br />LINE 2 DESIGN <br />PO BOX 590218 <br />STOCKTON CA 95269 <br />In compliance with your request of 02/07/2020, and subject to all the terms, conditions and restrictions vv�•itten below or printed as general or <br />special provisions on any part of this form. <br />Permission is hereby granted to construct One driveway w/o pipe shown on <br />Permit Application No. PS -20003 83 Quad: SW <br />Jobsite shall be kept in a safe condition at all tones by removing daily any excess dn•t or debris which might be a hazard to pedestrian and/or <br />vehicular traffic. Adequate lights, signs and barricades shall be placed and maintained by the Permittee for the protection of the public in <br />accordance with the current Caltrans Standard Specifications. <br />A(n) (12 inch) Twelve inch onside diameter per section 62 of the ctunent Caltrans Standard Specifications, ALTERNATIVE PIPE AND PIPE <br />ARCH CULVERTS, shall be installed nn roadside drainage ditch for ch•auiage now maintenance and shall be of sufficient length to clear toe of <br />approach fill or headwalls. <br />The entire al•ea of driveway approach(es), include flares for iwnning and /or paved frontage(s), from the edge of roadway pavement to <br />right -of --way (fiont property) line shall be surfaced with a two inch (2") minimtun of asphalt concrete over a (4 inch) Four inch mnihnum of <br />compacted layer of three-quarter inch (3/4") maximum size aggregate base material (road gravel) conforming to Class 2 Aggregate Base <br />specified in Section 26 of the current Caltrans Standard Specification, or with a four inch (4") minimum of portland cement concrete. <br />If portlan <br />d cement concrete pavement is installed, expansion joints shall be provided at the edge of pavement and along property line. Siu•face <br />grades of approaches) and/or to open ends ofpipe. No ponding or puddles on pavement surface shall be allowed. <br />The field Engineering Division of this office shall receive no less than forty-eight(48) hours notice prior to beginning of any work <br />within the County right -of --way. After completion of the worn: permitted herein, all debris, lumbe►•, ba►•ricades or any excess <br />material shall be removed and the jobsite left in a neat workmanlike condition. The Permittee shall fill out and mail notice of <br />completion provided by Grantor. <br />Di <br />rveway(s) shall <br />be complete prior to occupancy of the residence, <br />but not to exceed etpiration date. <br />Kris Balaji, Director <br />Department of Public Works <br />tiils40� <br />By_ <br />Permit section <br />FORMS: <br />
The URL can be used to link to this page
Your browser does not support the video tag.