Laserfiche WebLink
SPEUTA.L PEUVIL' WIN ' <br />Winter Weather Utility or <br />1. SUPERVISI®N: The utility company (permittee) shall furnish full-time supervision of all work to insure <br />compliance with the permit provision. <br />2. START OlF WORK: No work within the County right -of --way shall be started until the utility company <br />representative has made an evaluation of weather conditions and has determined the work can be <br />accomplished under the provisions of the permit. <br />3. CLEAN PAVEMENT: Dirt and mud shall not be deposited on the pavement outside the area of work, <br />and if inadvertently tracked onto the road travel way shall be removed immediately. <br />4. DAILY RESTORATION: Private driveways and road intersections shall be restored daily. <br />5. WEATHER -TIGHT CONDITIONS: All trenches shall be filled and compacted, ditches and other <br />drainage facilities regarded and opened, and the entire work area restored to weather -tight condition prior to <br />any rain. <br />X:\ENCROACI-II�IENTS\General Provisions (Encroachment Permits)WJinter Weather Provisions.docx <br />