Laserfiche WebLink
FOLLOW PROCEDURES AS DETAILED INNORTHERN SECTOR PLAN FOR PROTECTIONOF UNDERGROUND AND BURIED CABLEM.O.P. DATEDM.O.P REQUIREDCATEGORY - 3Call USA @ 81148hrs prior to start of workFENCECONGRUEXR A S I A P A C I F I C-04/14/2023POLEFOCFACE OF CURBPROPOSED CONDUITR/WRIGHT OF WAYCLCENTERLINELEGENDBOSBACK OF SIDEWALKSSTOP SIGNCSWCONCRETE SIDEWALKSAFETY NOTE WORK AREA WILL INCLUDE LANECLOSURE ON ROAD WITH VERY HIGHTRAFFIC VOLUME. PLEASE PROVIDECOMPLETE WORK AREA PROTECTION.GENERAL NOTES:1. CONTRACTOR SHALL REQUEST LOCATION OFUNDERGROUND FACILITIES BY USA2. CONTRACTOR WILL COMPLY WITH ALLSAN JOAQUIN REGULATIONS FOR SPLICE PIT &SURFACE COMPACTION3. CONTRACTOR WILL RETURN WORK AREA BACKTO ORIGINAL OR BETTER CONDITION PRIOR TOSTART OF WORK4. MAINTAIN 48" MINIMUM COVEREOPEDGE OF PAVEMENT