Laserfiche WebLink
SPECIAL PROVISIONS <br />Winter Weather Utility Work <br />I. SUPERVISION: The utility company (permittee) shall furnish full -tune supervision of all work to insure <br />compliance with the permit provision. <br />2. START OF WORK: No work within the County right-of-way shall be started until the utility company <br />representative has made an evaluation of weather conditions and has determined the work can be <br />accomplished under the provisions of the permit. <br />3. CLEAN PAVEMENT: Dirt and mud shall not be deposited on the pavement outside the at•ea of work, <br />and if inadvertently tracked onto the road travel way shall be removed immediately. <br />4. DAILY RESTORATION: Private driveways and road intersections shall be restored daily. <br />5. WEATHER -TIGHT CONDITIONS: All trenches shall be 511ed and compacted, ditches and other <br />drainage facilities regarded and opened, and the entire work area restored to weather -tight condition prior to <br />any rain. <br />C:\ENCRGACHn1ENT5\Generel Provisions (Rncron<limenl Peimirs)\\Vin�er \l�eall�er Provisions.docs <br />