My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2021_PS-2100501 thru PS-2101000_ - PS-2100569
PublicWorks
>
- PUBLIC SERVICES
>
PERMITS & DEVELOPMENT
>
Encroachment(EP)/Driveway(DW) Permits
>
2021
>
PS-2100501 thru PS-2101000
>
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2021_PS-2100501 thru PS-2101000_ - PS-2100569
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/24/2023 11:35:19 AM
Creation date
4/24/2023 11:30:19 AM
Metadata
Fields
Template:
Permits_Development
DocName
PS-2100569
Category07
Encroachment(EP)/Driveway(DW) Permits
Year2
2021
Notes2
Harney Lane E/O Lower Sacramento Rd. Between City Limits (County Portion)
Address
755 West Clay St., Stockton,CA 95206
Application
Knife River Construction
Type
Trench & Temp. Road Closure
Supplemental fields
Cross Ref
PWP7110005
Type (2)
Encroachment Permit (EP)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Iom Mil C7\I:vdW1\Iq <br />Q <br />O <br />ry <br />O <br />Z <br />LU <br />ry <br />LU <br />O <br />J <br />IN <br />R3-1 <br />HARNEYLANE <br />---------------------------------------------------------- <br />LEGEND <br />Z SIGN-REFLECTORIZED PER CAMUTCD 2014 <br />0 CONES SPACED 40'MAX <br />® <br />WORK AREA - PHASEI <br />® <br />WORK AREA - PHASE 2 <br />PROPOSED SANITARY SEWER <br />NOTES: <br />1. DETOUR PLAN SHEET 3 <br />2. WORKING HOURS: 7:00 PM - 5:00 AM <br />4. ALL RESIDENTS TO HAVE ACCESS TO PROPERTIES AT ALL TIME. <br />5. ALL LANES TO REMAIN 12' MINIMUM WIDTH <br />6. ALL SIGNS PER MUTCD STANDARDS <br />DESCRIPTION OF PHASE 1 WORK: <br />1. INSTALL SANITARY SEWER ON EAST SIDE OF INTERSECTION SHOWN AS <br />WORK AREA PHASE 2 IN GREEN <br />2. PHASE 2 SCOPE TO BE INSTALLED AT NIGHT <br />APPROVED BY <br />TRAFFIC CONTROL PLAN FOR <br />scALE <br />SHEET <br />TRAFFIC CONTROL PHASE 2 <br />INSTALL SANITARY SEWER AT INTERSECTION <br />GATEWAY SOUTH OFFSITErkh <br />KNIFE RIVER <br />CONSTRUCTION <br />doe NUMBER <br />PREPAREDBY FS <br />2 <br />CONTRAC.OR=R 334653 <br />DATE <br />LORI, CA <br />655W CLAY STREET P'. 209 948 0302 <br />OCKTON, CAA4220 <br />ST06 F. 9948664 <br />DATE 6,8/202, <br />OF 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.