Laserfiche WebLink
W2o-1 <br />Waa <br />W265 <br />R3-1 <br />HARNEY LANE' <br />L <br />W20 1 <br />r) <br />Q <br />O <br />ry <br />O <br />Z <br />cw <br />G <br />U <br />Q <br />U7 <br />of <br />>W <br />O <br />J <br />R3-1 <br />HARNEYLANE <br />LEGEND <br />Z SIGN-REFLECTORIZED PER CAMUTCD 2014 <br />0 CONES SPACED 40' MAX <br />® WORK AREA- PHASE 3 <br />PROPOSED SANITARY SEWER <br />NOTES: <br />1. DETOUR PLAN SHEET 5 <br />2. WORKING HOURS: 7:00 PM - 5:00 AM <br />4. ALL RESIDENTS TO HAVE ACCESS TO PROPERTIES AT ALL TIME. <br />5. ALL LANE WIDTHS TO REMAIN 12' MINIMUM WIDTH <br />6. ALL SIGNS PER MUTCD STANDARDS <br />DESCRIPTION OF PHASE 1 WORK: <br />1. INSTALL SANITARY SEWER ON MIDDLE OF INTERSECTION SHOWN AS <br />WORKAREA PHASE 3 I BLUE <br />2. PHASE 3 SCOPE TO BE INSTALLED AT NIGHT <br />APPROVED BY <br />TRAFFIC CONTROL PLAN FOR <br />So LE <br />SHEET <br />TRAFFIC CONTROL PLAN PHASE 3 <br />INSTALL SEWER AT INTERSECTION <br />GATEWAY SOUTH OFFSITE�74- <br />KNIFE RIVE <br />CONSTRUCTION <br />doe NUMBER <br />PREPAREDBY FS <br />4 <br />FON.P F.OR=5 46 <br />DATE <br />LORI, <br />6 W OAV SIRE T P.2 948 mH <br />STOQQON,O 6 6 F.2 9488 <br />DATE 6218/2021 <br />OF 9 <br />