Laserfiche WebLink
IomF_VIl:vaW_l\1:1 <br />U) <br />IY <br />w <br />O <br />J <br />T <br />1 A <br />HARNEY LANE <br />V <br />LEGEND <br />TRAFFIC CONTROL PLAN FOR <br />ME <br />SCALE <br />SHEET <br />Z <br />SIGN-REFLECTORIZED PER CAMUTCD 2014 <br />R3-1 <br />OB"°NEER <br />PREPARED BY FS <br />7 <br />CONES SPACED40'MAX <br />LOO,CA <br />G3 CKFON STREET P: 2099486652 <br />�D"�D""'lLREET SLICE""F"°""F"F�g8 <br />WORK AREA - PHASE 5 <br />of <br />91 <br />DATE <br />PROPOSED SANITARY SEWER <br />PROPOSED NON -POTABLE WATER <br />NOTES: <br />1. DETOUR PLAN SHEET 8 <br />2. WORKING HOURS: 7:00 AM - 5:00 PM <br />4. ALL RESIDENTS TO HAVE ACCESS TO PROPERTIES AT ALL TIME. <br />5. ALL LANE WIDTHS TO REMAIN 12' MINIMUM WIDTH <br />6. ALL SIGNS PER MUTCD STANDARDS <br />DESCRIPTION OF PHASE 1 WORK: <br />1. INSTALL SANITARY SEWER WEST SIDE OF LOWER SACRAMENTO ROAD <br />IN PHASE 5 WORKAREA SHOWN IN YELLOW <br />2. INSTALL NON -POTABLE WATER IN PHASE 5 WORKARES SHOWN IN <br />YELLOW <br />3. DURATION OF WORK 7 DAYS (START DATE TBD.) <br />APPROVED Bac <br />I KAFFIG GUN I KUL PHAbh 5 <br />TRAFFIC CONTROL PLAN FOR <br />RIVER <br />SCALE <br />SHEET <br />SEWER AND NON -POTABLE WATER INSTALL EAST OF <br />GATEWAY SOUTH OFFSITE <br />������ <br />CONSTRUCTION <br />OB"°NEER <br />PREPARED BY FS <br />7 <br />LOWER SACRAMENTO ROAD <br />LOO,CA <br />G3 CKFON STREET P: 2099486652 <br />�D"�D""'lLREET SLICE""F"°""F"F�g8 <br />DATE 6/18/2021 <br />of <br />91 <br />DATE <br />