Laserfiche WebLink
1. CONTRACTOR SHALL BECOME FAMILIAR WITH PROJECT SURROUNDINGS, WORKING CONDITIONS, <br />AND SITE LIMITATIONS AND WILL INCLUDE ALLOWANCES IN THEIR BID TO COVER ANY PROJECT <br />CONSTRAINTS. <br />2. CONTRACTOR SHALL BE RESPONSIBLE FOR ADHERING TO AND COMPLYING WITH LOCAL <br />GOVERNING AGENCY PERMIT RESTRICTIONS, WHICH MAY AFFECT ALLOWABLE WORKING HOURS AND <br />NOISE LEVELS. <br />3. CONTRACTOR SHALL PROVIDE TRAFFIC CONTROL AS REQUIRED BY APPLICABLE LOCAL GOVERNING <br />AGENCY AND SHALL SUBMIT A TRAFFIC CONTROL PLAN PER CALTRANS STANDARDS TO <br />GOVERNING AGENCY (AS REQUIRED) PRIOR TO CONSTRUCTION. <br />4. CONTRACTOR SHALL APPLY CALIFORNIA STORMWATER QUALITY ASSOCIATION (CASQA) BEST <br />MANAGEMENT PRACTICES TO PREVENT WATER AND SEDIMENT FROM ENTERING NAVIGABLE <br />WATERWAYS. THE CONTRACTOR IS RESPONSIBLE FOR IDENTIFYING AND INSTALLING THE <br />APPLICABLE AND APPROPRIATE BMPs IDENTIFIED IN THE CASQA - STORMWATER BEST <br />MANAGEMENT PRACTICES HANDBOOK AVAILABLE ONLINE AT WWW.CABMPHANDBOOKS.COM. SOME <br />OF THE REQUIRED PRACTICES MAY OR MAY NOT BE SHOWN ON THIS SITE PLAN. <br />5. CONTRACTOR TO CONTACT "UNDERGROUND SERVICE ALERT" 48 HOURS PRIOR TO ANY <br />EXCAVATION. <br />6. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY THE EXACT LOCATION AND <br />DEPTH OF ALL EXISTING UTILITIES. <br />7. TRENCH TO BE SHORED IN ACCORDANCE WITH CALIFORNIA OSHA REGULATIONS. <br />8. PLACE A CONTINUOUS WIRE AND STRIP OF DETECTOR TAPE OVER ALL PIPES AND EXTEND UP <br />INTO ALL VALVE BOXES. TRACER WIRE IS REQUIRED ON ALL PIPE. (SEE LATEST REVISION OF <br />DRAWING CW -850). <br />9. SEE LATEST REVISION OF DRAWING CW -435 FOR TYPICAL THRUST BLOCK INSTALLATION. <br />10. FACILITIES SEPARATION: <br />A) WATER MAIN SHALL BE INSTALLED AT LEAST 10 FEET HORIZONTALLY FROM AND ONE FOOT <br />VERTICALLY ABOVE ANY PARALLEL PIPELINE CONVEYING SEWAGE (UNTREATED, PRIMARY, OR <br />SECONDARY), DISINFECTED SECONDARY RECYCLED WATER, OR HAZARDOUS FLUIDS. <br />B) WATER MAIN SHALL BE INSTALLED AT LEAST 4 FEET HORIZONTALLY FROM AND ONE FOOT <br />VERTICALLY ABOVE ANY PIPELINE CONVEYING TERTIARY RECYCLED WATER OR STORM <br />DRAINAGE. <br />C) AT CROSSINGS, WATER MAIN SHALL BE CONSTRUCTED NO LESS THAN 45 -DEGREES TO AND <br />AT LEAST ONE FOOT VERTICALLY ABOVE ANY PIPELINES INDICATED IN A AND B ABOVE. <br />D) NO CONNECTION JOINTS SHALL BE MADE IN THE WATER MAIN WITHIN EIGHT (8) HORIZONTAL <br />FEET OF CROSSING ANY PIPELINES INDICATED IN A AND B ABOVE. <br />E) WATER MAIN SHALL NOT BE INSTALLED WITHIN 100 HORIZONTAL FEET OF ANY SANITARY <br />LANDFILL, WASTEWATER DISPOSAL POND, OR HAZARDOUS WASTE DISPOSAL SITE. <br />F) WATER MAIN SHALL NOT BE INSTALLED WITHIN 25 HORIZONTAL FEET OF ANY CESSPOOL, <br />SEPTIC TANK, SEWAGE LEACH FIELD, SEEPAGE PIT, UNDERGROUND HAZARDOUS MATERIAL <br />STORAGE TANK, OR GROUNDWATER RECHARGE PROJECT SITE. <br />11. WHEN ASSEMBLING A PVC C-900 PIPE TO AN IRON FITTING (PUSH -ON OR MECHANICAL JOINT), <br />REMOVE ALL BUT 1/4 INCH OF THE FACTORY -MADE BEVEL FROM THE SPIGOT END OF THE <br />PIPE PRIOR TO INSTALLATION. <br />12. VALVE CANS AND COVERS SHALL BE PLACED OVER ALL VALVES. COVERS SHALL BE SET TO <br />EXISTING FINISHED GRADE AND RESET IF NECESSARY ONCE THE STREET IS AT FINAL GRADE. <br />(SEE LATEST REVISION OF DRAWINGS CW -14 AND CW -439). <br />13. NO VALVE COVERS ARE TO LIE IN SIDEWALKS, CROSS GUTTER, CURB OR DRIVEWAYS. EACH <br />SERVICE SHOULD ALSO BE LOCATED TO PROVIDE PROTECTION TO THE METER BOX FROM <br />VEHICLE TRAFFIC AND PARKING. <br />14. PROTECT UNDERGROUND FLEXIBLE COUPLINGS, BARE STEEL, MJ x MJ SLEEVES, AND ALL BOLTS <br />(INCLUDING STAINLESS STEEL) AS FOLLOWS: <br />A) THE ENTIRE AREA OF THE FITTING MUST BE DRY AND FREE OF DUST, DIRT, AND OTHER <br />FOREIGN MATTER. RUST OR OTHER FOREIGN MATTER MUST BE REMOVED BY SCRAPING OR <br />WIRE BRUSHING. WIPING WITH A DRY CLEAN CLOTH MAY BE NECESSARY TO REMOVE THE <br />PARTICLES FROM BRUSH CLEANING. ANY OIL OR GREASE MUST BE REMOVED BY USING A <br />LOW RESIDUE, VOLATILE PETROLEUM SOLVENT BEFORE APPLICATION OF GREASE AND <br />WRAPPING. <br />GENERAL NOTES: <br />B) THE EXPOSED AREA SHOULD BE COATED WITH A HEAVY COATING OF METALGUARD 301 <br />GREASE BY THE GLOVE METHOD TO A THICKNESS OF AT LEAST 1/4". <br />C) FIRMLY WRAP THE ENTIRE GREASE AREA WITH ONE LAYER, HALF -LAPPED, OF A WOVEN <br />GLASS FILAMENT MESH (RES OR BIT WRAP, 4" WIDE). <br />D) APPLY A SECOND LAYER OF METALGUARD 301 GREASE ON TOP OF THE GLASS FILAMENT BY <br />THE GLOVE METHOD TO A THICKNESS OF AT LEAST 1/4". <br />E) FIRMLY WRAP THE ENTIRE GREASE AREA WITH A SECOND LAYER, HALF -LAPPED, OF THE <br />WOVEN GLASS FILAMENT MESH. <br />F) COVER THE ENTIRE MESH WRAPPED AREA OF THE FITTING WITH A THIRD AND FINAL COATING <br />AT LEAST 1/4" THICK OF METALGUARD 301 GREASE BY THE GLOVE METHOD. <br />G) FIRMLY APPLY 2 LAYERS OF POLYWRAP, HALF -LAPPED, OVER ALL AREAS OF THE COATED <br />AND WRAPPED FITTING. BACKFILLING MAY FOLLOW IMMEDIATELY AFTER THIS WRAPPING. <br />15. TRENCH BACKFILL AND PAVING SHALL CONFORM TO TRENCH SECTION DETAILS AND ALL <br />GOVERNING AGENCY REQUIREMENTS. <br />16. NEW PIPELINE SHALL BE INSTALLED WITH 4 FEET OF COVER, EXCEPT WHERE SPECIFIED. <br />17. CONTRACTOR SHALL LIMIT DAILY TRENCHING OPERATIONS TO THE LENGTH OF PIPE THAT CAN BE <br />INSTALLED AND BACKFILLED THAT DAY. <br />18. CONTRACTOR SHALL INSTALL NEW MAIN AND ADJUST FROM NOMINAL LINE AND GRADE TO MATCH <br />THE EXISTING FACILITIES AT ALL LOCATIONS. THE CONTRACTOR SHALL INSTALL A TEMPORARY CAP <br />AND BLOW -OFF AT TIE-IN LOCATIONS FOR TESTING, (SEE LATEST REVISION OF DRAWINGS <br />CW -122 & CW -638). CONTRACTOR WILL TIE THE NEW MAIN FROM THIS LOCATION. <br />19. THE NEW PIPELINE SHALL BE TESTED AT 150 PSI FOR A PERIOD OF 4 HOURS. SEE <br />SPECIFICATIONS TO DETERMINE EXACT TESTING REQUIREMENTS. <br />20. TIE-INS TO BE MADE AT A TIME THAT IS CONVENIENT TO OWNER WHICH MAY BE AT NIGHTS OR <br />WEEKENDS. THE ADDITIONAL COST DUE TO OVERTIME PAY SHALL BE AT OWNER'S EXPENSE. <br />21. CONTRACTOR SHALL PROVIDE MISC. MATERIAL REQUIRED TO COMPLETE THE TIE-IN SUCH AS, <br />BUT NOT LIMITED TO: <br />PROTECTION COATING MATERIAL FOR PIPE AND FITTINGS, LINEGUARD TAPE, CONCRETE FOR <br />THRUST BLOCKS, EMBEDMENT BACKFILL AROUND AND OVER THE PIPE, FINAL BACKFILL TO MEET <br />COMPACTION REQUIREMENTS, AND PAVEMENT REPLACEMENT. <br />22. CONTRACTOR SHALL BE RESPONSIBLE TO ABANDON ALL PIPE ENDS BY PLUGGING WITH BRICK <br />AND MORTAR. ABANDON ALL GATE VALVES BY REMOVING COVER, CUT CASING DOWN TO <br />SUBGRADE, AND BACKFILL VALVE CASING WITH CONCRETE SLURRY TO REMOVE VOIDS. REPLACE <br />BASE ROCK AND PERMANENT PAVEMENT AS NECESSARY. WHEN REMOVING EXISTING FITTINGS, <br />CONTRACTOR SHALL ALSO REMOVE EXISTING CONCRETE THRUST BLOCK. <br />23. CONTRACTOR SHALL RESTORE LAWN, GUTTER, PAVEMENT, BERM, AND CURB TO MATCH EXISTING <br />PER GOVERNING AGENCY'S STANDARDS. <br />24. SPOILS SHALL NOT REMAIN ON-SITE. DISPOSAL OF ALL PROJECT -GENERATED SPOILS SHALL BE <br />AT A FACILITY LICENSED AND CLASSIFIED TO ACCEPT THE MATERIALS. CONTRACTOR TO PROVIDE <br />OWNER WITH A FORMAL RECEIPT FROM THE ACCEPTING FACILITY. ALL MATERIALS THAT WILL <br />REQUIRE TESTING PRIOR TO DISPOSAL SHALL BE SAMPLED AND TESTED IN ACCORDANCE WITH <br />THE REQUIREMENTS OF THE DISPOSAL FACILITY IN ADVANCE OF THE NEED FOR DISPOSAL. <br />25. THE LIST OF MATERIALS FOR THIS PROJECT IS FOR CWS CO. ESTIMATING AND REFERENCE <br />PURPOSES ONLY, AND IS NOT INTENDED AS A FULL TAKE -OFF OF ALL MATERIALS REQUIRED TO <br />COMPLETE THE PROJECT PER CWS CO. STANDARD SPECIFICATIONS. <br />26. AT TIE-INS, CONTRACTOR SHALL SPRAY OR SWAB ALL FITTINGS WITH CHLORINE SOLUTION FOR <br />DISINFECTION PRIOR TO FINAL CONNECTIONS. <br />27. CONTRACTOR TO ENSURE AIR IN THE PIPELINE IS REMOVED USING EXISTING OUTLETS SUCH AS <br />FIRE HYDRANTS AND BLOW OFFS. CONTRACTOR IS RESPONSIBLE FOR INSTALLING AIR RELEASES <br />IF EXISTING OUTLETS ARE INSUFFICIENT. <br />28. ALL WORK SHALL COMPLY WITH CAL WATER SPECIFICATIONS FOR MATERIALS, INSTALLATION, <br />DISINFECTION AND DECHLORINATION PER LATEST REVISION OF DRAWING CW -863. <br />29. ALL SLIP-ON WELDING FLANGES SHALL BE RAISED -FACE SLIP-ON WELDING FLANGES. <br />30. ALIGNMENT OF NEW MAIN MAY INCLUDE CROSSING UNDER OVERHEAD UTILITY SERVICE <br />CONNECTIONS AND LINES. CONTRACTOR IS RESPONSIBLE TO ENSURE ALL STATE AND FEDERAL <br />OSHA SAFETY REGULATIONS ARE FOLLOWED WHEN PERFORMING WORK NEAR OVERHEAD UTILITY <br />LINES. <br />COUNTY OF SAN JOAQUIN NOTES: <br />TRENCH CUT POLICY <br />GENERAL REQUIREMENTS <br />A. RESURFACING REQUIREMENTS SPECIFIED IN THIS POLICY ARE IN ADDITION TO THE TRENCH RESURFACING <br />REQUIREMENTS SPECIFIED BY COUNTY STANDARD DRAWING NO. R-29. <br />B. FOR THE PURPOSE OF THIS POLICY, "SURFACING AGE" IS DEFINED AS THE AGE OF THE MOST RECENTLY <br />COMPLETED ROADWAY SURFACING, INCLUDING CONSTRUCTION, RECONSTRUCTION, OR MAJOR OVERLAY. <br />C. WHERE THE APPLICATION OF SEAL COAT IS REQUIRED, A TYPE II SLURRY SEAL WILL BE USED IN ACCORDANCE <br />WITH STATE STANDARD SPECIFICATIONS, SECTION 37-2. <br />D. THE PERMITTEE MUST POST A ONE-YEAR MAINTENANCE BOND OR CASH DEPOSIT, IN AN AMOUNT SPECIFIED BY <br />THE DEPARTMENT. <br />E. ALL PAVEMENT MARKINGS DESTROYED OR OBLITERATED MUST BE REPLACED IN KIND BY THE PERMITTEE. TYPICAL <br />PAVEMENT MARKINGS INCLUDE, BUT ARE NOT LIMITED TO, LANE LINES, RAISED PAVEMENT MARKERS, AND <br />MISCELLANEOUS DELINEATORS. <br />F. THE PERMITTEE IS RESPONSIBLE FOR SURVEY MONUMENTS DISTURBED BY TRENCHING AND IS REQUIRED TO FILE <br />A CORNER RECORD AND TO REESTABLISH THEM USING A LICENSED LAND SURVEYOR AFTER THE TRENCH <br />RESTORATION IS COMPLETED. <br />G. FUNCTIONAL CLASSIFICATION AND PUBLIC WORKS PROJECT ADVERTISING SCHEDULES ARE REFERENCES FOR THIS <br />POLICY. <br />H. TO FACILITATE SCHEDULING AND PLANNING, PUBLIC WORKS STAFF WILL MAKE AVAILABLE THE MOST CURRENT <br />PROJECT ADVERTISING SCHEDULE AT THE MONTHLY UTILITY COORDINATION MEETING AND MAKE IT AVAILABLE TO THE <br />PUBLIC, AT THE PERMITS COUNTER, IN JANUARY EACH YEAR. <br />COLLECTORS, ARTERIALS AND EXPRESSWAYS <br />A. RESURFACING AGE LESS THAN THREE (3) YEARS: NO PAVEMENT CUTS. EXCEPTIONS MAY BE APPROVED WITH <br />ACCORDANCE WITH SECTION 2-5.04 EXCEPTIONS. <br />B. SURFACING AGE THREE (3) YEARS AND OVER: <br />1. LONGITUDINAL TRENCH CUTTING IN PAVED SHOULDER AREAS: <br />THE ENTIRE SHOULDER OF THE ROAD IS TO BE RESURFACED. THE EXISTING SURFACING ADJACENT TO <br />THE TRENCHED AREA SHALL BE PLANED TO ACCOMMODATE THE OVERLAY IN A MANNER THAT DOES <br />NOT CAUSE DRAINAGE CONCERNS. THE NEAREST PAVEMENT CUT SHALL BE A MINIMUM OF THREE (3) <br />FEET FORM THE EDGE OF PAVEMENT OR THE REMAINING PAVEMENT SHALL ALSO BE REMOVED AND <br />REPLACED. (SEE COUNTY STANDARDS DRAWING NO. R-37). <br />2. LONGITUDINAL TRENCHES WITHIN TRAVELED LANES: <br />THE ENTIRE TRAVELED LANE WHERE THE TRENCH IS LOCATED IS TO BE RESURFACED WITH ONE (1) INCH <br />ASPHALT CONCRETE OVERLAY. THE EXISTING SURFACING ADJACENT TO THE TRENCHED AREA SHALL BE <br />PLANED TO ACCOMMODATE THE OVERLAY IN A MANNER THAT DOES NOT CAUSE DRAINAGE CONCERNS. <br />THE OVERLAY SHALL BE IN ACCORDANCE WITH STATE STANDARDS SPECIFICATIONS SECTION 39. <br />AGGREGATE GRADATION SHALL BE CONSISTENT WITH THE EXISTING SURFACING MATERIAL. (SEE COUNTY <br />NOTE: <br />BEST LOCATION FOR WATER MAIN TO BE DETERMINED <br />IN THE FIELD BY CONTRACTOR AND CAL WATER <br />REPRESENTATIVE. TOPOGRAPHY & UTILITIES SHOWN <br />ON PLAN VIEW ARE APPROX. FIELD VERIFY EXACT <br />LOCATION OF ALL EXISTING UTILITIES PRIOR TO <br />EXCAVATION. ADJUST MATERIALS AS REQUIRED FOR <br />ACTUAL ALIGNMENT. <br />NOTE: <br />TIE-IN ALL EXISTING (LONG/ SHORT) SERVICE <br />TO PROPOSED CWS PIPE AFTER INSTALLATION. <br />THE CONTRACTOR IS RESPONSIBLE TO ABANDON ALL <br />PIPE ENDS BY PLUGGING WITH BRICK AND MORTAR. <br />ABANDON ALL GATE VALVES BY REMOVING COVER, <br />CUT CASING DOWN TO SUBGRADE, AND BACKFILL <br />VALVE CASING WITH CEMENT SLURRY TO FILL ALL <br />VOIDS, AND REPLACE BASE ROCK & PERMANENT AC <br />PAVEMENT PER LOCAL REGULATORY AGENCY <br />REQUIREMENTS. <br />POTHOLE AND VERIFY <br />CONTRACTOR WILL BE RESPONSIBLE FOR THE <br />VERIFICATION OF EXACT DEPTHS AND LOCATION OF <br />ALL EXISTING UTILITIES AND PROPOSED FACILITIES IN <br />THE FIELD PRIOR TO COMMENCING WORK. LOCATIONS <br />SHOWN ON THE PLANS AREA APPROXIMATE AND FOR <br />GENERAL INFORMATION ONLY. <br />31. = INDICATES FIRE HYDRANT (STOCKTON) <br />LIMITS OF CWS OWNERSHIP FOR EACH HYDRANT: <br />1 - 6 INCH OUTLET TEE OR ELL PDXFLG, DI <br />1 - 6 INCH GATE VALVE FLGxMJ <br />1 - VALVE CASING & COVER ASSEMBLY <br />+/- 10 FEET OF 6 INCH DUCTILE IRON PIPE <br />1 - 6x42 INCH FIRE HYDRANT BURY FLGxMJ <br />1 - 6x12 INCH FIRE HYDRANT EXTENSION <br />1 - SET 3/4" x 3-1/2" #304 SS BOLTS & NUTS, <br />AND GASKETS FOR HYDRANT <br />1 - SET 3/4" x 3-1/2" #304 SS BOLTS & NUTS, <br />AND GASKETS FOR HYDRANT BREAK -OFF <br />2 - SETS 3/4" x 3-1/2" #304 SS BOLTS & NUTS, <br />AND GASKETS FOR GATE VALVE <br />POLYWRAP TUBING, PVC TAPE, LINE GUARD AND MISC. <br />COATING MATERIAL. <br />FIRE HYDRANT: <br />CAL WATER'S PORTION OF THE FIRE HYDRANT INSTALLATION <br />SHALL BE LIMITED TO THE PDXFLG TEE & FLGXMJ GATE VALVE. <br />THE TEE, GATE VALVE, GASKET & BOLTS SHALL BE PROVIDED BY <br />OTHERS. THE REMAINDER OF THE FIRE HYDRANT MATERIALS <br />SHALL BE INSTALLED BY OTHERS WITH THE CITY OF STOCKTON <br />APPROVAL. THE CITY OF STOCKTON OWNS THE FIRE HYDRANT <br />ASSEMBLY. (HYDRANT ASSEMBLY SHALL BE APPROVED BY THE <br />CITY OF STOCKTON) <br />(THE FIRE CHIEF WILL MAKE THE FINAL CHOICE OF FIRE <br />HYDRANT HEAD WITH CAL WATER APPROVAL.) <br />A BREAK -OFF CHECK VALVE MAY BE REQUIRED IF SPECIFIED BY <br />DISTRICT PERSONNEL. USE CLOW MODEL LB400 OR APPROVED <br />EQUAL. <br />STANDARDS DRAWING NO. R-37). <br />3. CROSS -CUTTING: <br />CROSS -CUTTING IS ALLOWED AT A MINIMUM INTERVAL OF 150 FEET. AT EACH CROSS -CUT LOCATION, A <br />MINIMUM OF TEN (10) FEET ON EACH SIDE OF TRENCH SHALL BE PLANED AND RESURFACED WITH ONE <br />(1) INCH ASPHALT CONCRETE. IF CROSS -CUTS ARE WITHIN THE 150 FT MINIMUM INTERVAL, THE ENTIRE <br />SECTION BETWEEN THE FIRST AND LAST CROSS -CUT SHALL BE PLANED AND RESURFACED WITH ONE (1) <br />INCH ASPHALT CONCRETE. (SEE COUNTY STANDARDS DRAWING NO. R-36). <br />4. THE CONDITIONS DESCRIBED IN PARAGRAPHS 1, 2 & 3 ABOVE WILL NOT APPLY IF RESURFACING IS <br />SCHEDULED WITHIN TWO YEARS. <br />LOCAL ROADS <br />A. SURFACING AGE UNDER THREE (3) YEARS: NO PAVEMENT CUTS ALLOWED. EXCEPTIONS MAY BE APPROVED IN <br />ACCORDANCE WITH SECTION 2-5.04 EXCEPTIONS. <br />B. SURFACING AGE THREE (3) TO FIVE (5) YEARS: <br />1. LONGITUDINAL CUTS ARE PERMITTED. A SEAL COAT IS REQUIRED FOR THAT HALF OF THE ROADWAY <br />CONTAINING THE TRENCH. (SEE COUNTY STANDARDS DRAWING NO. R-37). <br />2. CROSS -CUTTING IS ALLOWED UNDER THE SAME CONDITIONS AS SECTION 2-5.02(B)(3). IF CROSS -CUTS <br />OCCUR WITHIN THE 150 FEET INTERVAL, RESURFACING MAY BE SUBSTITUTED WITLURRY SEAL <br />FOR THAT HALF OF THE ROAD WAY. (SEE COUNTY STANDARDS DRAWING NO. R-36). <br />EXCEPTIONS <br />EXCAVATION IS PROHIBITED IN NEWLY RENOVATED COUNTY ROADWAYS FOR THREE (3) YEARS AFTER A NOTICE OF <br />COMPLETION HAS BEEN FILED FOR A ROADWAY IMPROVEMENT PROJECT, OR A NEW ROADWAY HAS BEEN ACCEPTED. THE <br />DIRECTOR OF PUBLIC WORKS MAY APPROVE EXCEPTIONS THAT ARE IN THE BEST INTEREST OF THE PUBLIC, INCLUDING <br />BUT NOT LIMITED TO: <br />A. AN EMERGENCY THAT ENDANGERS LIFE OR PROPERTY. <br />B. FOR REPAIR OR MODIFICATION TO PREVENT INTERRUPTION OF ESSENTIAL UTILITY SERVICE. <br />C. FOR RELOCATION WORK THAT IS MANDATED BY COUNTY, STATE OR FEDERAL LAW. <br />D. FOR SERVICE FOR BUILDING WHERE NO REASONABLE MEANS OF PROVIDING SERVICE EXISTS. <br />E. FOR POTHOLING TO VERIFY UTILITY DEPTH OR LOCATIONS. <br />F. FOR TRENCHLESS EXCAVATIONS GREATER THAN THREE FEET IN DEPTH OF COVER OVER THE UTILITY FACILITY, AND <br />NOT REQUIRING A SIGNIFICANT SURFACE INCISION GREATER THAN INDUSTRY BORE PIT STANDARDS. <br />EXCEPTIONS MUST BE REQUESTED AND SUBMITTED IN WRITING TO THE DEPARTMENT. PAVEMENT OF A NON REFUNDABLE <br />PROCESSING FEE IS ALSO REQUIRED. EXCEPTIONS WILL BE REVIEWED USING THE DEPARTMENTS ACTION APPROVAL <br />PROCESS, WHICH REQUIRED THE RECOMMENDATION OF A DEPUTY DIRECTOR. <br />ABANDON IN PLACE <br />WITHIN THIRTY (30) DAYS AFTER SERVICE OF A 45 DAY NOTICE FROM SAN JOAQUIN COUNTY PUBLIC WORKS TO <br />RELOCATE, CHANGE GRADE, CONSTRUCT, USE, MAINTAIN, CHARGE OR MODIFY ANY STREET IMPROVEMENTS OR <br />COUNTY -OWNED UTILITY FACILITIES, CALIFORNIA WATER SERVICE SHALL AT ITS SOLE COST AND EXPENSE, BEGIN THE <br />NECESSARY WORK TO REMOVE THEIR ABANDONED FACILITIES IN CONFLICT. <br />PIPELINE CROSSING INFORMATION <br />AT WATER MAIN CROSSINGS IN CONFLICT WITH OTHER FACILITIES: <br />WHEN THE WATER MAIN IS IN CONFLICT WITH EX. FACILITIES OR PROPOSED FACILITIES THAT REQUIRE MORE <br />THAN A 2 FOOT ADJUSTMENT FROM THE NOMINAL 4 FEET OF COVER, A FABRICATED STEEL CEMENT MORTAR <br />LINED AND CEMENT COATED OFFSET SHALL BE INSTALLED AT THE CROSSING PER CWS CO. STANDARDS. <br />*DESIGNATES CL&C OFFSET REQUIRED <br />PER CWS REPRESENTATIVE DIRECTION, FOR UNANTICIPATED CONFLICTS FOUND DURING CONSTRUCTION THAT <br />REQUIRE ADJUSTMENT OF NEW MAIN FROM THE NOMINAL 4 FEET OF COVER, A FIELD BUILT VERTICAL OFFSET <br />MAY BE CONSTRUCTED. SEE REVERSE KICKER DETAIL IF FIELD CONSTRUCTING VERTICAL OFFSETS AROUND <br />CROSSINGS. �\ <br />INDICATES A SANITARY SEWER (SS) OR STORM DRAIN (SD) CROSSING. <br />PIPELINE CROSSINGS �SHALL BE INSTALLED OVER SS AND SO CROSSINGS PER GENERAL NOTE 10. PIPELINE <br />SHALL HAVE MINIMUM 2.5' COVER AND MINIMUM V VERTICAL SEPARATION BETWEEN NEW PIPELINE AND SS <br />OR SO CROSSINGS. THE ANGLE OF CROSSING SHALL BE FROM 45' TO 90'. ANY CROSSINGS NOT ABLE TO <br />BE INSTALLED PER CCR TITLE 22 "WATER MAIN SEPARATION" REQUIREMENTS SHALL BE INSTALLED PER STATE <br />APPROVED VARIANCE REQUEST. <br />LEGEND: <br />GAS <br />of <br />---- t - <br />ss <br />So <br />ABANDON <br />CENTER LINE <br />EASEMENT <br />EXISTING WATER <br />GAS <br />INTERIOR LOT LINES <br />OIL <br />PROPERTY LINE <br />PROPOSED WATER <br />RIGHT-OF-WAY (R/W) <br />SANITARY SEWER <br />STORM DRAIN <br />STRUCTURE <br />ASPHALT <br />CONCRETE PAVEMENT <br />DIRT/EARTH <br />LANDSCAPE <br />b <br />BLOWOFF (PROPOSED) <br />QTY <br />BLOWOFF (EXISTING) <br />0 <br />BUTTERFLY VALVE <br />E <br />CAP & PLUG <br />[[0 <br />CATCH BASIN <br />0 <br />CHECK VALVE <br />�y <br />ELBOW, 45' <br />7 <br />ELBOW, 90' <br />Oo <br />FIRE HYDRANT (PROPOSED) <br />O <br />FIRE HYDRANT (EXISTING) <br />tx <br />FLEX CPLG. (OR AS NOTED) <br />o <br />GATE VALVE (PROPOSED) <br />• <br />GATE VALVE (EXISTING) <br />D <br />REDUCER (PROPOSED) <br />► <br />REDUCER (EXISTING) <br />® <br />SEWER MANHOLE <br />so <br />STORM DRAIN MANHOLE <br />�+ <br />TEE <br />wM0 <br />WATER METER <br />BILL OF MATERIALS <br />NEW MAIN CONNECTIONS <br />QTY <br />DESCRIPTION <br />±2580' <br />6" DUCTILE IRON PIPE <br />±2840' <br />TRACER WIRE #12 AWG SOLID COPPER w/ 45 MILS HMWPE <br />INSULATION <br />±2840' <br />LINE GUARD TAPE - 110% (1.1 x FOOTAGE) <br />±3870' <br />POLYWRAP TUBING (F/ 6" D.I.) - 150% (1.5 x FOOTAGE) <br />6 <br />6" ELL 22.5' PO <br />2 <br />6" ELL 45' PO <br />2 <br />6" TEE PO <br />9 <br />6" GATE VALVE PO <br />9 <br />6" VALVE CASING AND COVER ASSEMBLY <br />1 <br />TIE-IN PER DETAIL A <br />1 <br />TIE-IN PER DETAIL C <br />1 <br />TIE-IN PER DETAIL G <br />1 <br />TIE-IN PER DETAIL H <br />±330' <br />8" DUCTILE IRON PIPE <br />±365' <br />TRACER WIRE #12 AWG SOLID COPPER w/ 45 MILS HMWPE <br />INSULATION <br />±365' <br />LINE GUARD TAPE - 110% (1.1 x FOOTAGE) <br />±495' <br />POLYWRAP TUBING (F/ 8" D.I.) - 150% (1.5 x FOOTAGE) <br />2 <br />8" x 6" REDUCER PO <br />3 <br />8" GATE VALVE PO <br />3 <br />8" VALVE CASING AND COVER ASSEMBLY <br />1 <br />TIE-IN PER DETAIL D <br />1 <br />TIE-IN PER DETAIL E <br />±36' <br />12" DUCTILE IRON PIPE <br />±40' <br />TRACER WIRE #12 AWG SOLID COPPER w/ 45 MILS HMWPE <br />INSULATION <br />±40' <br />LINE GUARD TAPE - 110% (1.1 x FOOTAGE) <br />±55' <br />POLYWRAP TUBING (F/ 12" D.I.) - 150% (1.5 x FOOTAGE) <br />1 <br />PER DETAIL B <br />1 <br />TIE-IN PER DETAIL F <br />AS <br />REQUIRED <br />METAL GUARD #301 - 1 GAL. PER 2 FITTINGS OF BARE STEEL <br />(FLEX. CPLG, FLGS...) <br />AS <br />REQUIRED <br />RES -BIT WRAP (100' ROLLS) - 1 RL. F/EVERY GAL. OF METAL <br />GUARD #301 <br />AS <br />REQUIRED <br /># / 80 SACKS CONCRETE THRUST BLOCKS <br />ABBREVIATIONS: <br />ABAND. <br />= ABANDONED <br />APN <br />= ASSESSORS PARCEL NUMBER <br />AB <br />= AGGREGATE BASE <br />AC <br />= ASBESTOS CEMENT PIPE <br />CB <br />= CATCH BASIN <br />CI <br />= CAST IRON <br />CL&C <br />= CEMENT LINED & COATED <br />CONC. <br />= CONCRETE <br />CPLG <br />= COUPLING <br />CU. YD. <br />= CUBIC YARD(S) <br />CWS <br />= CALIFORNIA WATER SERVICE <br />DEG <br />= DEGREES <br />DI <br />= DUCTILE IRON <br />EL. <br />= ELEVATION <br />ELEC <br />= ELECTRICAL <br />ELL <br />= ELBOW JOINT <br />EOP <br />= EDGE OF PAVEMENT <br />EP <br />= ELECTRICAL PANEL <br />EX./(E) <br />= EXISTING <br />FBE <br />= FLANGE BOTH ENDS <br />FH <br />= FIRE HYDRANT <br />RIP <br />= FEMALE IRON PIPE <br />FL <br />= FLOW LINE <br />FOE <br />= FLANGE ON END <br />FPT <br />= FEMALE PIPE THREAD <br />FS <br />= FINISH SURFACE <br />GB <br />= GROUND BOX <br />GPM <br />= GALLONS PER MINUTE <br />HORIZ. <br />= HORIZONTAL <br />HP <br />= HORSEPOWER <br />IBC <br />= INTERNATIONAL BUILDING CODE <br />INV <br />= PIPE INVERT <br />L <br />= LENGTH <br />MH <br />= MANHOLE <br />MIP <br />= MALE IRON PIPE <br />MJ <br />= MECHANICAL JOINT <br />MPT <br />= MALE PIPE THREAD <br />(N) = NEW/PROPOSED <br />ENGINEERING <br />NEC <br />= NATIONAL ELECTRIC CODE <br />DESCRIPTION <br />NPT <br />= NATIONAL PIPE THREAD <br />CHECKED BY: <br />N.T.S. <br />= NOT TO SCALE <br />10/4/22 <br />OHE <br />= OVERHEAD ELECTRICAL <br />OIL <br />= OIL LINES <br />E-4 <br />PBC <br />= PORTABLE BOOSTER CONNECTION <br />V <br />PBE <br />= PLAIN BOTH ENDS <br />' <br />PO <br />= PUSH -ON <br />' <br />POE <br />= PLAIN ON END <br />W <br />PRV <br />= PRESSURE REDUCING VALVE/ <br />L) <br />w <br />PRESSURE RELIEF VALVE <br />DEPARTMENT <br />PVC <br />= POLYVINYL CHLORIDE <br />/a^ <br />RE <br />= REDUCER <br />RCP <br />= REINFORCED CONCRETE PIPE <br />REVISIONS: <br />ROW <br />= RIGHT OF WAY <br />�w <br />SD <br />= STORM DRAIN <br />SDMH <br />= STORM DRAIN MANHOLE <br />SOW <br />= SLIP ON WELD FLANGE <br />SS <br />= SANITARY SEWER <br />SSMH <br />= SANITARY SEWER MANHOLE <br />STD BLK <br />= STANDARD STEEL PIPE <br />STL <br />= STEEL <br />S.U.M. <br />= SUBSURFACE UTILITY MAPPING <br />SQ. FT. <br />= SQUARE FEET <br />TDH <br />= TOTAL DYNAMIC HEAD <br />DATE: �T'• <br />TOC <br />= TOP OF CURB <br />MAP MON❑ <br />MAP <br />TON <br />= TOP OF NUT <br />TYP <br />= TYPICAL <br />PUT <br />MET ❑ <br />UMC <br />= UNIFORM MECHANICAL CODE <br />UPC <br />= UNIFORM PLUMBING CODE <br />scSn�renc ❑ <br />VBE <br />= VICTAULIC BOTH ENDS <br />VCP <br />= VITRIFIED CLAY PIPE <br />STATION ❑ <br />SCNSNAnc <br />VOE <br />= VICTAULIC ON END <br />W <br />= WIDTH <br />WV <br />= WATER VALVE <br />PLAT SHEET NO.: <br />VERT. <br />= VERTICAL <br />VOL <br />= VOLUME <br />STK 32-33 <br />ZN <br />= ZONE <br />SCALE: <br />FIRE HYDRANTS <br />QTY <br />DESCRIPTION <br />4 <br />6" FIRE HYDRANT <br />SERVICE CONNECTIONS <br />QTY <br />DESCRIPTION <br />±51 <br />1" SERVICES <br />Know what's below. <br />Call before you dig. <br />N/A <br />DRAWN BY: <br />E. JACOBSEN <br />DESIGNED BY: <br />L. VILLANUEVA <br />TECH REVIEW: <br />DATE: <br />10/4/22 <br />CHECKED BY: <br />DATE: <br />aqlj� <br />10/4/22 <br />APPROVED BY: DATE <br />QRp F ESS/ON <br />h�FO�P�QY ROWp�2eF <br />� z <br />EXP. 06-30-23 <br />OF CN <br />T <br />W <br />a <br />E- <br />E - <br />DISTRICT: F <br />DISTRICT: <br />STOCKTON <br />DATE: <br />10/04/2022 <br />PROJECT ID.: <br />00127376 <br />DRAWING NO.: <br />STK-9223 R1 <br />SHT 2 OF 8 <br />0 <br />P4 <br />E-4 <br />cf) <br />Q <br />V <br />cn <br />,� <br />a <br />W <br />rZr� <br />c <br />W <br />L) <br />w <br />/a^ <br />�i <br />w <br />NW <br />Qi <br />�w <br />Q <br />T <br />W <br />a <br />E- <br />E - <br />DISTRICT: F <br />DISTRICT: <br />STOCKTON <br />DATE: <br />10/04/2022 <br />PROJECT ID.: <br />00127376 <br />DRAWING NO.: <br />STK-9223 R1 <br />SHT 2 OF 8 <br />