My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2023_PS-2301001 thru PS-2301500_ - PS-2301113
PublicWorks
>
- PUBLIC SERVICES
>
PERMITS & DEVELOPMENT
>
Encroachment(EP)/Driveway(DW) Permits
>
2023
>
PS-2301001 thru PS-2301500
>
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2023_PS-2301001 thru PS-2301500_ - PS-2301113
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/26/2023 8:47:23 AM
Creation date
4/26/2023 8:44:21 AM
Metadata
Fields
Template:
Permits_Development
DocName
PS-2301113
Category07
Encroachment(EP)/Driveway(DW) Permits
Year2
2023
Notes2
N/S of Grant Line Rd. E/O Mountain House Pkwy. & N/S of Byron Rd. E/O Wicklund Rd. (See Plans for Exact Locations)
Address
903 Calle Amanacer,STE. 310
Application
CHC Consulting-Chris Schiller
Type
Install LPR Cameras (2)
Supplemental fields
Cross Ref
PWP110005
Type (2)
Encroachment Permit (EP)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Special Conditions for -2- <br />ENCROACHMENT PERMIT <br /> <br /> <br /> <br />12. Class II Aggregate Base shoulder backing is required from the edge of pavement, a minimum of <br />4-inches thick by 4-feet wide. <br /> <br />13. Contractor shall establish existing roadway and drainage grades within the construction area. <br />Any repair to roadways and adjacent areas shall match existing grades. Any proposed grade <br />changes shall receive prior approval from County. <br /> <br />14. Above ground vaults, panels and/or other similar facilities will be allowed within the right-of-way if <br />located as far to the outside edge as possible. Utility vaults shall be located a minimum of 4’-0” <br />from edge of pavement. <br /> <br />15. County roads shall be kept clean from mud and debris at all times along the access points and <br />work zone areas during entire project. All standard roadway striping and signage shall be clearly <br />visible, maintained and restored throughout the construction zone during and after the project. <br /> <br />16. In addition to standard dust control measures, streets shall be maintained in a clean condition, <br />free of dirt, mud and debris during construction activities. The contractor shall provide daily, and <br />as determined to be necessary by County inspectors, street sweeping using a modern <br />mechanical or vacuum-assisted street sweeper. <br /> <br />17. The contractor shall not conduct construction operations in rain or heavy fog conditions.
The URL can be used to link to this page
Your browser does not support the video tag.