Laserfiche WebLink
COUNTY OF SAN JOAQUIN <br />DEPARTMENT OF PUBLIC WORKS <br />P.O. BOX 1870-1810 E. HAZELTON AVENUE <br />STOCKTON, CALIFORNIA 95201 <br />209) 468-3000 <br />FAX # (209) 468-9324 <br />ENCROACHMENT PERMIT <br />To: PACIFIC GAS & ELECTRIC - STOCKTON <br />PO BOX 930 <br />S"17OCKTON, CA 95201 <br />Encroachment Type: <br />Bore (up to 12 inch Dia) Bore (over 12 inch Dia) <br />Location: <br />MCDONALD RD&HOLT RD <br />PermitNo: PS -1902298 <br />Date Issued: 07/10/2019 <br />Start Date: 07/10/20 19 <br />Exp. Date: 02/01/2020 <br />Project No: PWP730052 <br />Quad: <br />UE/CR/PM NO:35061374 <br />hh compliance with your request of 07/10/2019 , pernnssion is hereby grantod to do work in County right of -way as shown on attached <br />application and subject to all the Leans. conditions and restrictions rvinen below or printed as general or special provisions on any part ofthis <br />form. See reverse side and attached sheet, if any. <br />Trench excavations far service connections will not be permitted within ten feet (10') of pavement centerline unless otherwise approved by the <br />Director. Surface of trench patches shall match in kind arid be smooth and even with Chat of abutting surface. Special attention shalt be given <br />to depth of utilities Brough roadside area in anticipation of future drainage facilities, road profile and/or frontage development All <br />underground utility facilities are to be established and accurately dimensioned on sketches from surveyed centerline of road right ofway, or <br />from right of way (border) lilies. <br />Permittee shall call the DeparhnentofPublic Works, Field Engineering Division (Permit Inspections) at(209)953-7421 at least <br />forty-eight hours prior to beginning any work within the County right of way. All work performed under this permit shall conform to <br />the rules and regulations pertaining to safety established by the California Division of Industrial Safety and Cal -OSHA. <br />The jobsite shall be kept lir a safe condition at all times by tre daily removal of any excess dirt or debris which might be a hazard to either <br />pedestrian or automobile traffic. All necessary traffic convenience and warning devices and personnel shall be provided, placed and <br />maintained by and at the sole expense of the Permittee in accordance with the latest edition of the CALTRANS Manual of Traffic Control. <br />After completion of the work Pei untied herein, all debris, lumber, barricades, or any excess material shall be removed and the jobsite left in a <br />neat workmanlike manner. Immediately following completion of construction permitted herein, Permittee shall fill out and mail notice of <br />completion (see attached post card) provided by Grantor. <br />Comments: <br />FORMS: SSWAV R-29 <br />Est. Permit Fee: $1,432.00 <br />KRIS BALAIl, Director <br />Department of Public Works <br />WHITE -Permittee <br />GOLDENIZOD -PWD Central Pile <br />YELLOW -Field Inspection By: <br />PINK-PelinIL Section Permit Section