Laserfiche WebLink
COUNTY OF SAN JOAQUIN <br />DEPARTMENT OF PUBLIC WORKS <br />P.O. BOX 1810-1810 E. HAZE LTON AVENUE Permit No: PS -2301123 <br />STOCKTON, CALIFORNIA 95201 Start Date: 04/28/2023 <br />(209) 468-3000 Exp. Date: 04/27/2024 <br />FAX # (209) 468-9324 <br />APN No: 01704021 <br />DRIVEWAY ENCROACHMENT PERMIT <br />To: VAZ, PAUL E JR ETAL <br />4740 E PELTIER RD <br />ACAMPO CA 95220 - <br />Location; 4740 E PELTIER RD <br />In compliance with your request of 04/28/2023, and subject to all the terms, conditions and restrictions written below or printed as general or <br />special provisions on any part of this form. <br />Permission is hereby granted to construct One driveway w/o pipe shown on <br />Permit Application No. PS -2301123 Quad: NE <br />lobsite shall be kept in a safe condition at all times by removing daily any excess dirt or debris which might be a hazard to pedestrian and/or <br />vehicular traffic. Adequate lights, signs and barricades shall be placed and maintained by the Permittee for the protection of the public in <br />accordance with the current Caltrans Standard Specifications. <br />A(n) (SEE STAMP) SEE STAMP inside diameter per section 62 of the current Calbans Standard Specifications, ALTERNATIVE P[PE <br />AND PIPE ARCH CULVERTS, shall be installed in roadside drainage ditch for drainage flow maintenance and shall be of sufficient length to <br />clear toe of approach fill or headwalls. <br />The enthe area of driveway approach(es), include flares for turning and /or paved frontage(s), 8•om the edge of roadway pavement to <br />right -of --way (front property) line shall be surfaced with a two inch (2") an nhumn of asphalt concrete over a (6 nch) Six inch m nimum of <br />compacted layer of three-quarter inch (3/4") maximum size aggregate base material (road gravel) conforming to Class 2 Aggregate Base <br />specified in Section 26 of the current Caltrans Standard Specification, or with a four inch (4") minimum of portland cement concrete. <br />If portland cement concrete pavement is installed, expansion joints shall be provided at the edge of pavement and along property <br />line. Surface <br />grades of approaches) and/or to open ends of pipe. No pond ng or puddles on pavement surface shall be allowed. <br />Permittee shall call the Department of Public Worts, Field Engineering <br />Division (Permit Inspections) at (209) 953-7421 at least two <br />business days prior to beginning and completion of any work within the County right -of --way. After completion of the work <br />permitted herein, all debris, lumber, barricades or any excess material shall be removed and the jobsite left in a neat workmanlike <br />condition. <br />i)riveway(s} shall be complete prior to occu <br />pancy of the resideuce, <br />but not to exceed expiration date. <br />Fritz Buchman, Director <br />Department of Public Works <br />Permit section <br />FORMS: R -t7, SS/WW <br />