My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2023_PS-2301501 thru PS-2302000_ - PS-2301740
PublicWorks
>
- PUBLIC SERVICES
>
PERMITS & DEVELOPMENT
>
Encroachment(EP)/Driveway(DW) Permits
>
2023
>
PS-2301501 thru PS-2302000
>
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2023_PS-2301501 thru PS-2302000_ - PS-2301740
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/20/2023 3:57:04 PM
Creation date
6/20/2023 3:51:47 PM
Metadata
Fields
Template:
Permits_Development
DocName
PS-2301740
Category07
Encroachment(EP)/Driveway(DW) Permits
Year2
2023
Notes2
N/S of Sedan Ave. 2600' E/O Manteca Rd.
Address
3888 State St. Ste. 204,Santa Barbara,CA
Application
Telespan Communications, LLC
Type
Trench
Supplemental fields
Cross Ref
PWP7110005
Type (2)
Encroachment Permit (EP)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Special Conditions for -2- <br />ENCROACHMENT PERMIT <br />12. Trenches/bell holes shall be maintained in a smooth and even condition to the satisfaction of the <br />County throughout the project limits at all times. <br />13. All trenches/bell holes shall be completely backfilled or shored and plated at the end of each <br />workday, and the roadway restored to two-way traffic. If plating is to be used, a trench shoring <br />and plating plan suitable for traffic loadings shall be prepared by a registered civil engineer and <br />submitted for prior approval by the County. <br />14. The contractor shall use San Joaquin County Improvement Standard R-29 when backfilling <br />trenches/bell holes within the County right-of-way. Where the existing road structural section is <br />below standard, a minimum section of 3 inches of asphalt concrete over 8 inches of aggregate <br />base shall be required. <br />15. County roads shall be kept clean from mud and debris at all times along the access points and <br />work zone areas during entire project. All standard roadway striping and signage shall be clearly <br />visible, maintained and restored throughout the construction zone during and after the project. <br />16. In addition to standard dust control measures, streets shall be maintained in a clean condition, <br />free of dirt, mud and debris during construction activities. The contractor shall provide daily, and <br />as determined to be necessary by County inspectors, street sweeping using a modern <br />mechanical or vacuum -assisted street sweeper. <br />17. The contractor shall not conduct construction operations in rain or heavy fog conditions. <br />
The URL can be used to link to this page
Your browser does not support the video tag.