Laserfiche WebLink
NOTES: <br />1. If the distance between cross—cuts are less then 150' the entire area between <br />corss—cuts shall be planed and resurfaced with one (1) inch of Asphalt Concrete. <br />2. The resurfacing requirements shall be in addition to County Standard Drawing No. <br />R-29. <br />3. Resurfacing for Bell Holes shall meet these requirements. If excavation occurs within <br />the shoulder or lane, only that area shall be resufaced as shown. <br />4. If cross—cutting is performed on Local Roads at intervals less then 150' a Seal <br />Coat for that half of the roadway containing the trench can be used in lieu of <br />resurfacing. Section 2-5.03B-2. <br />Paved Shoulder <br />w <br />C O <br />o +, <br />Q) <br />UU <br />0 C <br />(D O <br />CU <br />4-1O <br />0)t 0 <br />C+'- <br />lp 3 a <br />U) (n <br />X N Q <br />o4- <br />Q) 4- <br />C DC- <br />0 N U <br />� .0 <br />U <br />O <br />E O <br />J U <br />D TRENCH CUTTING POLICY Approved by: <br />O CROSS CUTTING O< 7, -;,! �5' � <br />F <br />COUNTY ROADWAYS <br />No. Revision Description Date <br />COUNTY OF SAN JOAQUIN <br />Warkmg for YOU F7 DEPARTMENT OF PUBLIC WORKS <br />Date: DEC 2014 Std. Dwg. No. R-361 <br />Worm <br />FEE <br />0 <br />0 /Pol, 4,00 <br />01A 9 <br />w <br />C O <br />o +, <br />Q) <br />UU <br />0 C <br />(D O <br />CU <br />4-1O <br />0)t 0 <br />C+'- <br />lp 3 a <br />U) (n <br />X N Q <br />o4- <br />Q) 4- <br />C DC- <br />0 N U <br />� .0 <br />U <br />O <br />E O <br />J U <br />D TRENCH CUTTING POLICY Approved by: <br />O CROSS CUTTING O< 7, -;,! �5' � <br />F <br />COUNTY ROADWAYS <br />No. Revision Description Date <br />COUNTY OF SAN JOAQUIN <br />Warkmg for YOU F7 DEPARTMENT OF PUBLIC WORKS <br />Date: DEC 2014 Std. Dwg. No. R-361 <br />