Laserfiche WebLink
NORTH SAN JOAQUIN WATER CONSERVATION DISTRICT <br />SHEET INDEX <br />SHEET NO, <br />DESCRIPTION <br />1 <br />COVER <br />2 <br />TECHNICAL SPECIFICATIONS <br />3 <br />KEY MAP AND LEGEND <br />4 <br />PROPOSED SITE PLAN AND DEMOLITION <br />5 <br />PROPOSED SITE PLAN AND DEMOLITION <br />6 <br />PLAN AND PROFILE <br />7 <br />PLAN AND PROFILE <br />8 <br />PLAN AND PROFILE <br />9 <br />BOX SECTION VIEWS <br />10 <br />CONSTRUCTION DETAILS <br />SOUTH SYSTEM IMPROVEMENTS <br />SAN JOAQUIN COUNTY <br />1: NORTH SAN JOAQUIN WATER CONSERVATION DISTRICT (NSJWCD) SHALL BE CONTACTED AT LEAST <br />48 HOURS PRIOR TO COMMENCEMENT OF WORK ON OR NEAR EXISTING DISTRICT FACILITIES. <br />2: USED MATERIAL, REJECTS, MISFITS, SECONDS, ETC. ARE NOT ACCEPTABLE FOR USE. <br />3: ALL CONSTRUCTION SHALL BE IN CONFORMANCE WITH THESE PLANS AND PROJECT <br />SPECIFICATIONS. <br />4: CONTRACTOR SHALL FIELD VERIFY THE HORIZONTAL AND VERTICAL LOCATIONS OF ALL EXISTING <br />FACILITIES PRIOR TO COMMENCING WORK. CALL UNDERGROUND SERVICE ALERT (USA) AT 8-1-1. <br />CONTRACTOR SHALL MAKE ENGINEER AWARE OF ANY DISCREPANCIES. WHERE UNDERGROUND AND <br />SURFACE STRUCTURES ARE SHOWN ON THE PLANS, THE LOCATIONS, DEPTH AND DIMENSIONS OF <br />STRUCTURES ARE BELIEVED TO BE REASONABLY CORRECT, BUT ARE NOT GUARANTEED. SUCH <br />STRUCTURES ARE SHOWN FOR THE INFORMATION OF THE CONTRACTOR, BUT INFORMATION SO <br />GIVEN IS NOT TO BE CONSTRUED AS A REPRESENTATION THAT SUCH STRUCTURES WILL, IN ALL <br />CASES, BE FOUND WHERE SHOWN, OR THAT THEY REPRESENT ALL OF THE STRUCTURES WHICH <br />MAY BE ENCOUNTERED. <br />5: CONCRETE DESIGN MIX SHALL BE SUBMITTED TO THE ENGINEER FOR REVIEW AND APPROVAL. ALL <br />CONCRETE SHALL HAVE A 28 -DAY MINIMUM COMPRESSIVE STRENGTH OF 45000 PSI UNLESS <br />OTHERWISE SPECIFIED. <br />6: TRENCH BACKFILL SHALL BE COMPACTED TO 90% RELATIVE COMPACTION UNLESS OTHERWISE <br />NOTED IN THESE PLANS. <br />7: ALL STEEL PIPE AND FITTINGS SHALL BE FURNISHED WITH A SHOP APPLIED HIGH SOLIDS EPDXY <br />COATING ON THE INTERIOR AND EXTERIOR, UNLESS OTHERWISE INDICATED. ALL OTHER EXPOSED <br />STEEL SHALL BE PAINTED WITH A PRE-TREATMENT PRIMER, AN UNDERCOAT, AND A FINAL COAT <br />OF PAINT IN ACCORDANCE WITH THESE PLANS. <br />8: ALL NUTS, BOLTS, AND WASHERS USED TO SECURE UNDERGROUND FITTINGS SHALL BE STAINLESS <br />STEEL. AFTER INSTALLATION, ALL STEEL HARDWARE SHALL BE COATED WITH A RUST <br />PREVENTATIVE, WRAPPED WITH 4 MIL POLYETHYLENE SHEETING, AND SECURED WITH PVC TAPE. <br />9: THRUST RESTRAINTS TO BE PROVIDED AT ALL PIPELINE BENDS, WHETHER OR NOT SHOWN ON THE <br />PLANS. <br />10: ALL CONSTRUCTION SHALL BE PERFORMED IN ACCORDANCE WITH APPLICABLE HEALTH AND <br />SAFETY LAWS OF THE STATE OF CALIFORNIA AND CAL/OSHA STANDARDS. <br />11: CONTRACTOR WILL BE RESPONSIBLE FOR THE REPAIR OF ALL PIPELINE CRACKS, WHICH DEVELOP <br />DURING CONSTRUCTION OF IMPROVEMENTS AFFECTING EXISTING FACILITIES. <br />12: ALL EXCESS MATERIAL AND/OR DEBRIS SHALL BE REMOVED UPON COMPLETION OF INSTALLATION. <br />13: CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING ADEQUATE DUST CONTROL AT ALL TIMES. <br />006 <br />DE GRAAF <br />IT-IMMINr-FRING, INC. <br />DEGRAAFENGINEERINGINC.COM <br />P.O. BOX 87 RIPON, CA 95366 <br />(209)614-2745 <br />Na 86415 <br />DATE SIGNED: <br />BID SET <br />NOT FOR CONSTRUCTION <br />1112/2022 <br />10[*�V=LTA 61W0 b7a\I=11111111 <br />0 <br />Know. what's below. <br />Call before you <br />SITE <br />SAFETY AND PROTECTION NOTES <br />1: <br />THE DUTY OF THE ENGINEER, OWNER OR ITS AGENTS TO CONDUCT CONSTRUCTION OF THE <br />CONTRACTOR'S PERFORMANCE AND THE UNDERTAKING OF INSPECTIONS OR THE GIVING OF <br />INSTRUCTIONS AS AUTHORIZED HEREIN IS NOT INTENDED TO INCLUDE REVIEW OF THE ADEQUACY <br />OF THE CONTRACTOR'S SAFETY MEASURES IN, ON, OR NEAR THE CONSTRUCTION SITE AND SHALL <br />NO BE CONSTRUED AS SUPERVISION OF THE ACTUAL CONSTRUCTION NOR MAKE THE ENGINEER, <br />OWNER OR ITS AGENTS RESPONSIBLE FOR PROVIDING A SAFE PLACE FOR THE PERFORMANCE OF <br />WORK BY THE CONTRACTOR, SUBCONTRACTORS, OR SUPPLIERS, OR FOR ACCESS, VISITS, USE, <br />WORK, TRAVEL OR OCCUPANCY BY ANY PERSON. <br />2: <br />THE CONTRACTOR SHALL HAVE AT THE WORK SITE, COPIES OR SUITABLE EXTRACTS OF <br />Z <br />CONSTRUCTION SAFETY ORDERS, ISSUED BY CAL -OSHA. CONTRACTOR SHALL COMPLY WITH <br />w <br />PROVISIONS OF THESE AND ALL OTHER APPLICABLE LAWS, ORDINANCES AND REGULATIONS. THE <br />CONTRACTOR MUST COMPLY WITH PROVISIONS OF THE SAFETY AND HEAL REGULATIONS FOR <br />wCONSTRUCTION, <br />PROMULGATED BY THE SECRETARY OF LABOR UNDER SECTION 107 OF THE <br />i <br />CONTRACT WORK HOURS AND SAFETY STANDARDS ACE, AS SET FORTH IN TITLE 29 C.F.R. <br />3: <br />TO PROTECT THE LIVES AND HEALTH OF CONTRACTOR'S EMPLOYEES UNDER THE CONTRACT, THE <br />J <br />O <br />CONTRACTOR SHALL COMPLY WITH ALL PERTINENT PROVISIONS OF THE "MANUAL OF ACCIDENT <br />w/ <br />PREVENTION IN CONSTRUCTION" ISSUED BY THE ASSOCIATED GENERAL CONTRACTORS OF AMERICA, <br />Li <br />a <br />INC., AND SHALL MAINTAIN AN ACCURATE RECORD OF ALL CASES OF DEATH, OCCUPATIONAL <br />W <br />DISEASE, AND INJURY REQUIRING MEDICAL ATTENTION OR CAUSING LOSS OF 11ME FROM WORK, <br />w > <br />— <br />ARISING OUT OF AND IN THE COURSE OF EMPLOYMENT OR WOK UNDER THE CONTRACT. <br />Z O <br />4: <br />THE CONTRACTOR ALONE SHALL BE RESPONSIBLE FOR THE SAFETY, EFFICIENCY, AND ADEQUACY <br />W <br />OF CONTRACTOR'S FACILITIES, APPLIANCES, AND METHODS AND FOR ANY DAMAGE, WHICH MAY <br />W <br />RESULT FROM THEIR FAILURE OR THEIR IMPROPER CONSTRUCTION, MAINTENANCE, OR OPERATION. <br />5: <br />THE CONTRACTOR AGREES THAT IT SHALL ASSUME SOLE AND COMPLETE RESPONSIBILITY FOR JOB <br />SITE CONDITIONS DURING THE COURSE OF CONSTRUCTION OF THIS PROJECT, INCLUDING SAFETY <br />OF ALL PERSONS AND PROPERTY; THAT THIS REQUIREMENT SHALL APPLY CONTINUOUSLY AND <br />NOT BE LIMITED TO NORMAL WORKING HOURS; AND THAT THE CONTRACTOR SHALL DEFEND, <br />INDEMNIFY, AND HOLD THE OWNER, ENGINEER, AND THEIR RESPECTIVE AGENTS HARMLESS FROM <br />ANY AND ALL LIABILITY, REAL OR ALLEGED, IN CONNECTION WITH THE PERFORMANCE OF WORK <br />ON THIS PROJECT, EXCEPTING FOR LIABILITY ARISING FROM THE SOLE NEGLIGENCE OF OWNER, <br />Q <br />ENGINEER, OR THEIR RESPECTIVE AGENTS. <br />6: <br />THE OWNER AND ITS AGENTS' SITE RESPONSIBI LIII ES ARE LIMITED SOLELY TO THE ACTIVITIES OF <br />0 <br />THEIR EMPLOYEES ON SITE. THE RESPONSIBILITIES SHALL NO BE INFERRED BY ANY PARTY TO <br />MEAN THAT THE OWNER OR ITS AGENTS HAVE RESPONSIBILITY FOR SITE SAFETY. SAFETY IN, ON, <br />OR ABOUT THE SITE IS THE SOLE AND EXCLUSIVE RESPONSIBILITY OF THE CONTRACTOR ALONE. <br />THE CONTRACTOR'S METHODS OF WORK PERFORMANCE, SUPERINTENDENCE,AND THE <br />CONTRACTOR'S EMPLOYEES, AND SEQUENCING OF CONSTRUCTION ARE ALSO THE SOLE AND <br />EXCLUSIVE RESPONSIBILITIES OF THE CONTRACTOR ALONE. <br />PROJECT: 22-01 <br />DRAWN BY: I GJ <br />CHECKED BY: DD <br />DATE: 11/212022 <br />SHEET <br />1 OF 10 <br />