My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2022_PS-2202501 thru PS-2203000_ - PS-2202965
PublicWorks
>
- PUBLIC SERVICES
>
PERMITS & DEVELOPMENT
>
Encroachment(EP)/Driveway(DW) Permits
>
2022
>
PS-2202501 thru PS-2203000
>
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2022_PS-2202501 thru PS-2203000_ - PS-2202965
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/21/2023 10:49:02 AM
Creation date
6/21/2023 10:43:39 AM
Metadata
Fields
Template:
Permits_Development
DocName
PS-2202965
Category07
Encroachment(EP)/Driveway(DW) Permits
Year2
2022
Notes2
6844 E. Fairchild Rd.
Address
PO Box 930, Stockton,CA 95201
Application
Pacific Gas & Electric-Stockton
Type
Bore (over 12 inch Dia)
Supplemental fields
Cross Ref
PWP730052
Type (2)
Encroachment Permit (EP)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
See Note 1 Below <br />Existing <br />6" Mm6" �+ Pavement 6" I+-6" Min <br />—►1 ► <br />(Typ) NO <br />\ See Note 2 Below u11, <br />3'-0" Compact in 12" max 3-0" <br />layers to a min relative <br />------ compaction of 957 --------Var <br />\--------- under pavement and \ -------- <br />Var ? _ — — \' 90% outside pavement. <br />— Compact in 24" max Cp CD+12" <br />layers to a min relative <br />OD/2 compaction of 65%, <br />Compact in 6" layers a <br />to a min relative <br />compaction of 90%. <br />10" Min �C 10" Min 10" Min OD 10" Min <br />QD CO <br />+ 20" Min + 20" Min <br />RIGID CONDUIT FLEXIBLE CONDUIT <br />JIRIES: <br />1. New pavement shall be 1" thicker than existing pavement, minimum <br />of 0.25 Ft. New base shall be 1" thicker than existing base, min of 0.50 Ft, <br />2. Select native material or Imported granular material as approved by the Director <br />of Public Works. Backfill with materials equal to or better than the existing <br />pavement end base in quality. <br />3, Relative compaction of mcteriols shall be tested in cccardance with <br />the State of Colifamia, Dept. of Transportation Testing Manuals, test <br />method No. California 216 or 231, <br />4. All existing pavement shall be neatly cut to line prior to trench excavation, <br />5. Jetting or ponding will be permitted within the street right—of—woy with <br />a 3 year bond, when approved by the Director of Public Works. <br />6. When shown by soil composition and compoctobillty, ninety percent (90%) <br />compaction may be used, when approved by the Director of Public Works <br />7. Special bedding and bockfill requirements may be shown on the plans or <br />specified in the special provisions. <br />Approved by, <br />W/r TYPICAL TRENCH BACKFILL VowivIV& <br />No, Revbian Dead ion Date <br />COUNTY OF SAN JOAQUIN <br />DEPARTMENT OFMIC WORKS <br />Weft fm YOU Date Dtc sola std. Dwg, No. R•29 <br />
The URL can be used to link to this page
Your browser does not support the video tag.