My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2022_PS-2202501 thru PS-2203000_ - PS-2202965
PublicWorks
>
- PUBLIC SERVICES
>
PERMITS & DEVELOPMENT
>
Encroachment(EP)/Driveway(DW) Permits
>
2022
>
PS-2202501 thru PS-2203000
>
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2022_PS-2202501 thru PS-2203000_ - PS-2202965
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/21/2023 10:49:02 AM
Creation date
6/21/2023 10:43:39 AM
Metadata
Fields
Template:
Permits_Development
DocName
PS-2202965
Category07
Encroachment(EP)/Driveway(DW) Permits
Year2
2022
Notes2
6844 E. Fairchild Rd.
Address
PO Box 930, Stockton,CA 95201
Application
Pacific Gas & Electric-Stockton
Type
Bore (over 12 inch Dia)
Supplemental fields
Cross Ref
PWP730052
Type (2)
Encroachment Permit (EP)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
35254518 <br />6844 FAIRCHILD <br />TRAFFIC CONTROL PLANS <br />STOCKTON, CALIFORNIA <br />GENERAL NOTES: <br />1. ALL TRAFFIC CONTROL DEVICES SHALL CONFORM TO THE LATEST EDITION OF THE CALIFORNIA MANUAL OF UNIFORM TRAFFIC CONTROL DEVICES (CA MUTCD), THE <br />CALTRANS STANDARD PLANS AND SPECIFICATIONS, AND THE CALIFORNIA TEMPORARY TRAFFIC CONTROL HANDBOOK (CATTCH). <br />2. THE LOCAL FIRE DEPARTMENT, SHERIFF/POLICE DEPARTMENT, CALIFORNIA HIGHWAY PATROL, LOCAL SCHOOL DISTRICT, TRANSIT SERVICE PROVIDERS AND UNITED STATES <br />POSTAL SERVICE SHALL BE NOTIFIED 72 HOURS IN ADVANCE OF CONSTRUCTION WORK. <br />3. ALL WORKERS SHALL BE EQUIPPED WITH A REFLECTIVE VEST AND HARD HAT PER THE LATEST ANSI/ISEA 107 STANDARDS. ALL FLAGGERS SHALL ALSO BE EQUIPPED <br />WITH A R1 -1/W20-8 "STOP/SLOW' PADDLE AND SHALL BE TRAINED IN THE PROPER FUNDAMENTALS OF FLAGGING TRAFFIC. <br />4. NO PARKING SIGNS SHALL BE PLACED IN ACCORDANCE TO LOCAL AGENCY REQUIREMENTS. OTHERWISE, NO PARKING SIGNS SHALL BE PLACED 72 HOURS PRIOR TO SET <br />UP. SIGNS SHALL BE POSTED EVERY 20 LINEAR FEET OF OCCUPIED SPACE WITH AT LEAST ONE SIGN AT EACH END OF OCCUPIED SPACE. <br />5. ANY CONFLICTING SIGNS SHALL BE COVERED FOR THE LENGTH OF THE JOB. <br />6. CONTRACTOR SHALL MAINTAIN EMERGENCY VEHICLE AND DRIVEWAY ACCESS AT ALL TIMES. <br />7. B.A.T.S. TRAFFIC SOLUTIONS, INC. ASSUMES NO LIABILITY WHEN CONTRACTOR DOES OWN SET UP OR MAKES CHANGES TO THE ORIGINAL TRAFFIC CONTROL PLAN. PLANS <br />ARE NOT TO BE DUPLICATED OR REDISTRIBUTED FOR USE BY ANY PERSONS NOT INCLUDED IN THIS SCOPE OF WORK WITHOUT WRITTEN CONSENT. <br />B. PLACE W20-1 "ROAD WORK AHEAD" SIGNS ON ALL SIDE STREETS WITHIN THE ADVANCE WARNING AREA. <br />9. IF PEDESTRIAN ACCESS IS RESTRICTED DURING WORK HOURS, AT LEAST ONE WORKER SHALL BE ASSIGNED WITH THE RESPONSIBILITY TO SAFELY ESCORT DISABLED, <br />ELDERLY, AND/OR ANY OTHER PEDESTRIAN IN NEED OF ASSISTANCE. THE ASSIGNED WORKERS) MAY ALSO PARTICIPATE IN OTHER CONSTRUCTION ACTIVITIES BUT SHALL <br />ALWAYS BE AWARE OF HIS/HER RESPONSIBILITY TO PROVIDE THIS ASSISTANCE. PEDESTRIANS SHALL NOT BE DIRECTED NOR EXPECTED TO CROSS A ROADWAY AT ANY <br />LOCATION OTHER THAN AT A SIGNALIZED INTERSECTION OR ALL—WAY STOP. ACCOMMODATIONS SHOULD BE MADE ON THE SAME SIDE OF THE ROADWAY AS THE WORK. <br />10. ALL ADVANCED WARNING SIGNS SHALL BE EQUIPPED WITH A HIGH—LEVEL WARNING DEVICE (FLAG TREE). <br />11. TYPE A OR TYPE B FLASHING WARNING LIGHTS SHALL BE USED, AS SHOWN ON THE PLAN, WHEN WORK IS AT NIGHT OR ENCROACHES THE HOURS OF DARKNESS. TYPE <br />B FLASHING WARNING LIGHTS SHALL BE USED, AS SHOWN ON THE PLAN, WHEN WORK IS 24/7 SETUP. <br />12. LIGHT TOWERS SHALL BE USED AT FLAGGER STATIONS AND WORK AREAS WHEN WORK IS AT NIGHT OR ENCROACHES THE HOURS OF DARKNESS. HIGHWAY <br />CONSTRUCTION WORK LIGHTING SHALL BE PER CALIFORNIA CODE OF REGULATIONS CONSTRUCTION SAFETY ORDER 1523 (TILE 8, DIVISION 1, CHAPTER 4, SUBCHAPTER 4, <br />ARTICLE 3, SECTION 1523). <br />13. WHEN APPLICABLE, PLACE A MINIMUM OF FOUR CONES AT 50FT INTERVALS IN ADVANCE OF FLAGGER STATION. <br />14. WHEN APPLICABLE, PLACE SHOULDER TAPER IN ADVANCE OF PCMS BOARD. SEE TABLE 1 ON CALTRANS STD T9 FOR SHOULDER TAPER LENGTH. <br />15. NOTHING ALLOWED IN BUFFER OR TRANSITION AREAS UNLESS OTHERWISE SHOWN ON THE PLAN. <br />16. CONTRACTOR SHALL PLATE OR BACKFILL EXCAVATED AREA DURING NON—WORKING HOURS. <br />17. PLAN IS ACCURATE FOR TRAFFIC CONTROL WORK ONLY. EXCAVATION LOCATION IS APPROXIMATE AND FOR REFERENCE ONLY. <br />18. CONES SHOWN ON PLAN ARE FOR ILLUSTRATION PURPOSES ONLY. EXACT NUMBER OF CONES REQUIRED SHALL BE BASED ON THE POSTED SPEED, TANGENT LENGTHS, <br />TAPER LENGTHS, CONFLICT SECTIONS, AND ACTUAL FIELD CONDITIONS, ETC. <br />19. CONTRACTOR SHOULD AVOID PLACING SIGNS IN THE BIKE LANE. <br />20. WHEN APPLICABLE, CONTRACTOR SHALL PLACE C27 (CA) -OPEN TRENCH" SIGNS ON EACH END OF AN OPEN TRENCH. C27 (CA) SIGN SHALL FACE TRAFFIC TRAVELING <br />WITHIN 15' OF THE OPEN TRENCH (I.E. DOUBLE SIDED SIGNS IN SOME CASES). PLACE C27 (CA) SIGNS IN THE TRENCH AT INTERVALS NOT TO EXCEEED 2,000 FT. <br />21. CONTRACTOR PERFORMING THE WORK SHALL NOT LEAVE EXCAVATIONS UNATTENDED AT ANY TIME DURING CONSTRUCTION. EXCAVATIONS MUST BE LEFT PLATED OR <br />BACKFILLED. <br />35254518 - 6844 FAIRCHILD RD <br />TRAFFIC CONTROL PLANS <br />STOCKTON, CALIFORNIA <br />B.A.T.S. TRAFFIC SOLUTIONS <br />CSLB#91]034 W4Fcxx0:510-299-5666 <br />OFFICE: 510F5%543FAX: 510F57-2544 <br />' <br />44800 INDUSTRIAL DR, FREMONT, CA 94538 <br />WVONBATSTRAFFICSOLUTIONS.COM � <br />"' ` <br />AFTER HOURS EMERGENCY <br />TCP QUESTIONS? <br />TCPORDERS@GOBATS.NET <br />JK <br />0 9/9/33 <br />14NE0 fCR PERNIi NEE TJf <br />MB <br />Nw DAM <br />LER "ON DM cHKD <br />WPV <br />0A�EMAIL: <br />9/ <br />R E V I S 1 0 N S <br />sxEEr xo. 01 OF 03 snEErs <br />
The URL can be used to link to this page
Your browser does not support the video tag.