Laserfiche WebLink
Cahfomia MU T CD 2014 Fdation Page 1177 <br />(FHWA.'s MUTCD 2009 Edition, including Revisions 1 e, 2, as amended for use in Califon ia) <br />Tahle 6F-101(rAl NAaxie»!!m n_._--- <br />Speed <br />(mph) <br />.. ........... vVV4GJ <br />Maximum Channelizing Devices Spacing <br />Taper` <br />(feet) <br />Tangent <br />ee <br />Conflict" <br />feet <br />20 <br />20 <br />40 <br />10 <br />25 <br />25 <br />50 <br />12 <br />30 <br />30 <br />60 <br />15 <br />35 <br />35 <br />70 <br />17 <br />40 <br />40 <br />80 <br />20 <br />45 <br />45 <br />90 <br />22 <br />50 <br />50 <br />100 <br />25 <br />55 <br />50 <br />100 <br />25 <br />60 <br />50 <br />100 <br />25 <br />65 <br />50 <br />100 <br />25 <br />70 <br />50 <br />100 <br />25 <br />75 <br />50 <br />100 <br />25 <br />Maximum channelizing device spacing for all speeds on one IaneAwo-way tapers is <br />20 feet. <br />Maximum channelizing device spacing for all speeds on downstream tapers is 20 <br />feet. <br />All other tapers are as shown. <br />Use on intermediate and short -terra projects for taper and tangent sectisms where <br />there are no pavement markings or where there is a conflict bekveen existing <br />pavement markings and channelizing devices. <br />Chapter 6F —Temporary Traffic Control Zone Devices November 7, 2014 <br />Part 6 —Temporary Traffic Conti al <br />