Laserfiche WebLink
EL DORADO STREET (STOCKTON) <br />Traffic Signal Modification Plans 1/2 <br />(FAU project Plans filed in SP Drawer) <br />State (1957) Construction Plans (As Built) (I-5 to Charter Way) 1/7 <br />of 24 <br />State (1964) Construction Plans (As Built) (I-5 to Charter Way) 1/7 <br />of 29 <br />RESURFACING -(Surface Transportation Program Project No.STPL-5929) <br />(I-5 to 2,300'± N/0 French Camp Road.) <br />Mosswood Sewer Project Phase 2 <br />French camp Road- RESURFACING (El <br />E1 dorado Street RESURFACING (I-5 <br />Bus Stop Improvements, Phase I <br />Dorado St. to Airport Way) <br />to Stockton City Limits) <br />(El Dorado Street @ French Camp Road) <br />French Camp Road and E1 Dorado Street Traffic Signal (Intersection) <br />CRACK SEAL 2016 - 2017 <br />EL DORADO STREET RESURFACING <br />French Camp Road Resurfacing Federal Aid Project N0. STPL-5929(296) <br />Bridge �k <br />1150 (29C-124) Bridge Across French Camp Slough <br />�2 <br />E403 - E404 <br />SP397 - SP404 <br />SP405 - SP411 <br />SP1166 - SP1171 <br />SU3082 - SU3093 <br />SP2715 - SP2725 <br />SP2838 - SP2850 <br />SP �{S:TI - SP S32 <br />F267 <br />SP6771 - 6775 <br />SP7221 - SP7231 <br />SP7331 - SP7337 <br />F50 - F55 <br />