Laserfiche WebLink
GOLDEN GATE AVENUE (STOCKTON) #2 <br /> <br />Charles Street to Waterloo Road (Storm Sewer) W197B-W205 <br />Sterr to Waterloo Road (Widening and Resurfacing) SP178 - SP195 <br />Fremont Street "F" Street Resurfacing SP3097 - SP3104 <br />(100' W/O Golden Gate Ave. South to Windsor Avenue) <br />(Roosevelt Street to Waterloo Road) <br />East Stockton Drainage Connection Project SP4697 - SP4709 <br />(Gianone Park: Golden Gate Avenue and Chronicle Avenue) <br />(Taft Park: Mourfiled Ave., Odell Ave., and Downing Avenue) <br />Alpine Heights & Gianone Park Area Resurfacing SP4790 - SP4803 <br />Belvedere Ave.: Alpine Ave to North End <br />Euclid Ave.: Sanguinetti Lane to Belvedere Ave. <br />Golden Gate Ave.: Harding Way to Waterloo Road <br />Harding Way: E. street to Filbert Street <br />Higgins Avenue: Stadium Drive to Belvedere Ave. <br />Stadium Drive: Sanguinetti Lane to Higgins Ave, <br />Vine Street: D street to Filbert Street <br />Bus Stop Improvements, Phase I SP4571 - SP4582 <br />(Golden Gate Ave. @ John Street) <br /> <br /> <br /> <br /> <br /> <br />