Laserfiche WebLink
0.12' HMA Overlay <br />See Sheet 3 - --- - Roadway Reconstruction (Roadway Excavation) - - - F over planing <br />Install 377± LF of <br />" (+36 25' LT) Install Fire Hydrant <br />+ 8PVC Pipe (AWWA C-900) Install 164± LF of Assembly and Water Valve per SJCo <br />IIIPh. See SJCo Std R-29. Install 18" PVC Pipe (SDR 35) Std W-2 and W-3 (Break off check <br />72± of 12" Steel Casing. and backfill trencheser <br />i I ill I Iii I P valve in the Hydrant Assembly) <br />SJCo Std R-29. - <br />< C0 r*t <br />WJ <br />< <br />Q <br />co <br />g vQ�� j <br />< c Const <br />II ■ m o O <br />A,�,�° II Ili j 0 Gas valve to W (A ■ j <br />` I ; j > 0 be adjusted + + � <br />� m . by others. + + +�� j <br />♦ Vl nW O <br />G q4 e Val., e r'✓ .. J o <br />10 <br />Yr <br />-- -w-1- w• -CO <br />-� -w w-�- -----= w w---- w------ w----- -- - - � N <br />a) ACADEMY STREET ° sOMH 11 - H#1 <br />- - - 10 - -------- 1 --------------- -- 12 - _#._.. 850 13_. �.. - - -- > <br />3 � SDM 0 <br />(D Cv <br />a ; <br />rrI-- - ._ <br />SDI #12 ----- <br />(AM 9 . W + ...a.,m .: ! rr+Ar . w ,. T - T R •I�'� <br />Y <br />+ + rn+ <br />Install Thrust Blocks and I� -.- �- `Q rn �_�- ��� e..A__ ._„ ?, 0 N 0 0 N w a 0 � <br />Water Valves per SJCo Std II o NJ< <br />II Approximate location 4 <br />W-5 & W-6 (Typ) u h of Gas Line. Install 2 Under + For Planing details <br />II n = Sidewalk Drain Pipes(,I See Sheet 8 <br />Carolina St Stu 10+00=O er SJCo Std D-15 Orange St Sta 10+00 _ J (n P50 (in 43.22, out 43.17) a N j <br />Install 2 SDI's Type 1 1 <br />+00 (in 42.98, out 42.93) <br />BEGIN WORK Install 12"4 PVC Pipe (SDR 35) <br />25 LF (Lt) & 27 LF (Rt) j <br />See SJCo Std R-29 and D -13A <br />BENCH MARK <br />ORANGE STREET <br />18+06.5 (29' Lt) <br />Elev 43.71 <br />45 <br />41 <br />39 <br />+ <br />+ <br />+ <br />+ <br />+ <br />+ <br />+ <br />+ <br />+ <br />+ <br />+ <br />+ <br />O <br />N <br />V <br />O <br />N <br />Cn <br />�I <br />O <br />N <br />Cn <br />�I <br />O <br />Cn <br />O <br />(n <br />O <br />(n <br />O <br />N <br />O <br />(n <br />O <br />(n <br />Z <br />0 <br />II <br />Z <br />.�0 <br />II II <br />Z Z <br />p <br />SDI (1 1) <br />New <br />Sta 12+00 17.5' Rt <br />Install new Storm Drain Inlet <br />(Type 1) SJCo Std D -13A <br />Z <br />38.65 <br />WW <br />GJ <br />40.20 <br />N(d <br />Z Z <br />W <br />Maintenance Hole Type 1 <br />Z <br />12" SW (IN) <br />18" W (IN) <br />12" NW (IN) <br />TI <br />O <br />T1 <br />r- <br />C4 00 <br />_n �I <br />rr <br />N <br />T1 <br />r <br />(Type 1) SJCo Std D -13A <br />12" NE (OUT) <br />SDI (15) <br />New <br />Stu 10+46 21.5' Lt <br />Install new Storm Drain Inlet <br />42.89 <br />40.30 <br />mTI <br />fi <br />M -n <br />m T1 <br />(Type 1 SJCo Std D -13A <br />m TI <br />12" SE (OUT) <br />m TI <br />,r, <br />M-,mT1 <br />SDI (9) <br />New <br />Stu 12+71 21.5' Lt <br />m -n <br />r� <br />M -n <br />M-11+ <br />M -n <br />M-111.100 <br />II <br />II II <br />II <br />OG7 <br />II II <br />II II <br />b <br />II II <br />00 <br />II II <br />Sta 12+71 25.5' Lt <br />6)d <br />II II <br />II <br />06 <br />II <br />00 <br />II II <br />00 <br />II II <br />v <br />II <br />00 <br />and plug with concrete <br />00 <br />12" E (OUT) <br />00 <br />00 <br />��_F� <br />Existing <br />4 <br />�_P� <br />•P��? <br />40.40 <br />44h. <br />4h. <br />II <br />�4 <br />elevation <br />-N-N <br />12" s (OUT) <br />41, <br />II <br />II II <br />II II <br />II <br />4b, <br />II II <br />�P6 <br />II II <br />1� <br />(npp <br />01 <br />Cn <br />? <br />? <br />P <br />4 <br />41, <br />(,SGA <br />CA -P. <br />CEJ <br />GWp <br />(4+ 4 <br />N <br />OO <br />(,+ <br />O <br />N N <br />OO <br />(n Cn <br />N Pl <br />OD <br />��„� <br />-�� <br />Oma <br />. M <br />(oma <br />SIO <br />A <br />Onto <br />(n 00 <br />Ln <br />CSI CSI <br />4 <br />N W <br />c0 Cn <br />O (o <br />00 O <br />OD •P <br />O <br />(D� <br />?cD <br />? Ln, <br />O <br />OCn <br />00 <br />001M <br />44, <br />Existing Ground CL <br />Finish Grade CL New Gutter FL (Lt) Install <br />--- I <br />Existing FL (Lt) Fire Hydrant <br />o�_._ Assembly ) <br />As bl (Lt) <br />-058 _:_,,• <br />_�. <br />�10 22 -ft <br />-.----- <br />_. ,. 0.47 ••-.. .. <br />_..._..._.. <br />Install 26± & 28± LF <br />12" PVC Pipe -----,,,New Gutter FL (Rt) <br />.. <br />Existing FL (Rt) <br />Inv Elev �� 4,r <br />41.26 8 A <br />9�0) <br />PROFILE LEGEND <br />37 --- - Existing Ground <br />Finish Grade <br />Existing Flow Line (Lt) <br />Existing Flow Line (Rt) <br />- - - New Gutter Flow Line (Lt) <br />35 New Gutter Flow Line (Rt) <br />9 <br />SDI#1 1 <br />SDI# 12 <br />T Min 1.0' <br />Install 163± LF <br />18"0 PVC Pipe (SR35) <br />-0.030 7. <br />72± LF Install 160±LF 8" 0 PVC pipe AWWA C-900 <br />INV 8"0 pipe u <br />Elev 38.60 (in )_J <br />8" PVC pipe C-900 Inv Elev <br />( ) <br />�SDMH#1 1 38.60 <br />with 12"W SDMH#10 <br />Steel Casing. <br />X�� <br />�A <br />10 11 12 <br />-INV 8"0 pipe <br />Elev 38.60 (out) PROFILE SCALE <br />0 20 42 100 Horiz. <br />0 2 5 Vert. <br />13 14 <br />STORM DRAIN MAINTENANCE HOLES AND STORM DRAIN INLETS SCHEDULE (ACADEMY STREET) <br />Item <br />Location <br />Remark <br />Rim <br />Elev <br />Inverts <br />SDMH (1 1) <br />New <br />O <br />(n <br />O O <br />38.55 <br />38.55 <br />38.55 <br />Z <br />Z <br />Sta 13+60 5' Rt <br />Rt <br />SJCo Std D-16 <br />43.62 <br />18" E (OUT) <br />12" SW (IN) <br />12" NW (IN) <br />SDMH (10) <br />New <br />Sta 13+83 0' offset <br />r <br />r <br />r <br />38.05 <br />M TI <br />M <br />Tl <br />X T1 <br />Tl ITlrr- <br />-n <br />00 <br />II II <br />0 <br />II <br />II <br />.�0 <br />II II <br />0a <br />II I II <br />p <br />SDI (1 1) <br />New <br />Sta 12+00 17.5' Rt <br />Install new Storm Drain Inlet <br />(Type 1) SJCo Std D -13A <br />43.60 <br />38.65 <br />WW <br />GJ <br />40.20 <br />N(d <br />CAWp <br />W <br />Maintenance Hole Type 1 <br />12" SE (OUT) <br />12" SW (IN) <br />18" W (IN) <br />12" NW (IN) <br />OD N <br />O <br />Sta 12+00 21' Lt <br />C4 00 <br />CO CO Q) <br />N <br />Existing Ground CL <br />Finish Grade CL New Gutter FL (Lt) Install <br />--- I <br />Existing FL (Lt) Fire Hydrant <br />o�_._ Assembly ) <br />As bl (Lt) <br />-058 _:_,,• <br />_�. <br />�10 22 -ft <br />-.----- <br />_. ,. 0.47 ••-.. .. <br />_..._..._.. <br />Install 26± & 28± LF <br />12" PVC Pipe -----,,,New Gutter FL (Rt) <br />.. <br />Existing FL (Rt) <br />Inv Elev �� 4,r <br />41.26 8 A <br />9�0) <br />PROFILE LEGEND <br />37 --- - Existing Ground <br />Finish Grade <br />Existing Flow Line (Lt) <br />Existing Flow Line (Rt) <br />- - - New Gutter Flow Line (Lt) <br />35 New Gutter Flow Line (Rt) <br />9 <br />SDI#1 1 <br />SDI# 12 <br />T Min 1.0' <br />Install 163± LF <br />18"0 PVC Pipe (SR35) <br />-0.030 7. <br />72± LF Install 160±LF 8" 0 PVC pipe AWWA C-900 <br />INV 8"0 pipe u <br />Elev 38.60 (in )_J <br />8" PVC pipe C-900 Inv Elev <br />( ) <br />�SDMH#1 1 38.60 <br />with 12"W SDMH#10 <br />Steel Casing. <br />X�� <br />�A <br />10 11 12 <br />-INV 8"0 pipe <br />Elev 38.60 (out) PROFILE SCALE <br />0 20 42 100 Horiz. <br />0 2 5 Vert. <br />13 14 <br />STORM DRAIN MAINTENANCE HOLES AND STORM DRAIN INLETS SCHEDULE (ACADEMY STREET) <br />Item <br />Location <br />Remark <br />Rim <br />Elev <br />Inverts <br />SDMH (1 1) <br />New <br />Sta 12+20 0' offset <br />Install new Storm Drain <br />Maintenance Hole Type 1 <br />44.07 <br />38.55 <br />38.55 <br />38.55 <br />SDMH (7) <br />New <br />Sta 13+60 5' Rt <br />Rt <br />SJCo Std D-16 <br />43.62 <br />18" E (OUT) <br />12" SW (IN) <br />12" NW (IN) <br />SDMH (10) <br />New <br />Sta 13+83 0' offset <br />Install new Storm Drain <br />Maintenance Hole Type 1 <br />43.52 <br />38.05 <br />38.05 <br />38.05 <br />SJCo Std D-16 <br />18" N (IN) <br />24" S (OUT) <br />18" W (IN) <br />SDI (1 1) <br />New <br />Sta 12+00 17.5' Rt <br />Install new Storm Drain Inlet <br />(Type 1) SJCo Std D -13A <br />43.60 <br />38.65 <br />40.20 <br />40.20 <br />40.20 <br />Maintenance Hole Type 1 <br />12" SE (OUT) <br />12" SW (IN) <br />18" W (IN) <br />12" NW (IN) <br />SDI (12) <br />New <br />Sta 12+00 21' Lt <br />Install new Storm Drain Inlet <br />(Type 1) SJCo Std D -13A <br />4341 <br />. <br />38.65 <br />(Type 1) SJCo Std D -13A <br />12" NE (OUT) <br />DRAWN BY <br />Enrique Sifva <br />DRAWER <br />DATE <br />9115 <br />SHEET NO. <br />als <br />W <br />43 <br />41 <br />39 <br />37 <br />35 <br />0.12' HMA Overlay <br />over planing <br />See Sheet 3 - Roadway Reconstruction (Roadway Excavation) <br />Install 1 SDI Type 1 <br />Install 20± LF of <br />12" PVC Pipe (SDR 35) <br />backfill trenches with Slurry <br />Cement. See SJCo Std D -13A <br />Install 376± LF of <br />$ PVC Pipe (AWWA C-900) and Sheet 9 for details. <br />per SJCo Std R-29. <br />Sta 12+50 16' Lt <br />I' Cni Construct one 20' wideCID <br />+ <br />I II I Ili Install 2 SDI's Type 1 Commercial Driveway 00 Existing Sidewalk <br />I I I I 10; YP Y 0 Ln <br />■ I I II °° to remain in lace <br />Install 12 4 PVC Pipe (SDR 35) per SJCo Std R-14 c� P <br />jI 25 LF (Lt) & 18 LF (Rt) ® Ln Abandon drainage pipe <br />I ! j backfill trenches with Slurry (` and plug with concrete. <br />y 'L Const + R&S Wood P 9 <br />=1 ■ Cement. See SJCo Std D -13A N Barricade <br />Install 20± LF of <br />an Sheet 8 for details. � <br />f p i I sDl#lo 12" PVC Pipe (SDR 35) <br />Install Thrust Blocks and I I i�(� --� � , � � �, <br />Water Valves per SJCo Std i i i SDI 1s sDI#11 <br />W-5 & W-6 (Typ) ■ I W� SDI#9 -Abandon drainage pipe <br />and plug with concrete. <br />s ' H •ir-w---mow - -'----w------w--------w------w-------w------ w---L-----w-- its w ------- w ----Q <br />-� O <br />Carolina Stu 10+00= �' �* --- -<Di ----- _ CAROLINA STREET_-_-_-_-�--_-_-_-_ �- <br />Orange Sta 14+20 ' I o eso . 'So w OE:- - - �- - - - - - m <br />■ .SDMH#14 �Z tiyo SDMH#12 a? A ra? SDMH#8 'SDMH 7 - SDMH#6' M <br />Place Monument 1 # <br />Frame and Cover per SDI#14 - __- - _ =- O a <br />- --- - -- <br />SJCo Std R -28A & R -28B <br />m v_a 4pr.. 5d Pbllll�fl Mi. 5E a31� ! 1,°,: 4S W_I�fi N! IY' S8f11�{ . .!f ri 1�.I� i 't•.. i :u5 + Iv <br />+ + +m �, 0 I j m <br />Z <br />i.! ( ++ Install 396± LF of tr ; �nu' ` �I N 0a �� I i <br />i I: j II I Cn n 6 Ln „ <br />■ I ■, C_ c OLD 18 PVC Pipe (SDR 35) + M < I O <br />■ I I i.. j I f n D c0 co . <br />o m° backfill trenches with In a + For Planing details <br />} I I• I N I cn See Sheet 8 <br />U Slurry Cement. Install Storm Drain Manhole ® o rn 0 O <br />See Sheet 9 for details. Type 1 per SJCo Std D1690 <br />= <br />;U TA oSee Sheet 9 for special n O (A i <br />no requiremenrs and details (Typ) <br />CID (A BEGIN WORK+26 ° R END WORK <br />25 t Install Fire Hydrant Assembly <br />and Water Valve per SJCo Std W-2 and W-3 <br />(Break -off check valve in the Hydran Assembly) <br />+ + + + + + + + + + + + + + <br />O Cn __I O N Cn O U (n -4 00 O Cn <br />C7 O 0O Cn O (n O O O � O O <br />ZZ ZZ Z ZZ_Z Ti M -MTTl TTTT�rte m Tl TI <br />rri <br />M -n <br />0 0 III 00 0 C) 00 0 <br />pII II I IiII II II II II II II IIT1 <br />Gi W (4 N(,4 W L14 -P. Ph. 4 -N 4� 4�- P, 4h. 4h. _P1 4 <br />4h. (A W (A U -PICA CA W W N N C.+(A W W(.d W <br />V 00 00 OD :I v L� OD (D :P1 L4 � O (0 O (D N 00 --,Ib) b) v V v v <br />Cn OD �I (D N v ODO O __ QD Cn N C,� O N A O (D N (o N T v 00 ON, <br />45 <br />43 <br />41 <br />39 <br />37 <br />BENCH MARK <br />ORANGE STREET <br />18+06.5 (29' Lt) <br />Elev 43.71 <br />Install 60± LF <br />18"0 PVC pipe <br />(SDR 35) <br />SDMH#14 <br />Install 8" <br />Gate Valve <br />Inv Elev <br />36.97 <br />10 <br />� I <br />Existing Ground CL <br />Finish Grade 6L Install <br />Fire Hydrant 45 <br />New Gutter FL (Rt) - Assembly (Lt) <br />0 30 ..._...-...-...-.._ 0.157 � _ <br />- _ - ------ <br />0 15% <br />._ <br />0.45 - - _ <br />- _.-._.._.- _-0.20- <br />o.s5� 43 <br />Install 18± LF & 25± LF Existing FL (Lt) <br />Abandon <br />12"0 PVC Pipe Existing FL (Rt) drainage pipeAandon <br />New Gutter FL (Lt) drainage pipe <br />_ 41 <br />Install 336± LF 18.,0 PVC i LT- _ _ _ n <br />pipe (SDR 35) SDI#9 I <br />SDI 14 -0.030 7.SDI#1 1 <br />SDI 15 <br />I I <br />SDMH#12 <br />SDMH#6 39 <br />% SDM #8 - SDMH#7 <br />Inv Elev <br />Install 336± LF 8"0 PVC pipe (AWWA C-900) 36.97 <br />12 <br />'ON 133HS I 213MVJG <br />37 <br />PROFILE SCALE FIEcOR� RAMNO <br />0 20 40 0 Horiz. Cr -end By, <br />0 2 5 Vert. 'hTV" 19y -- <br />5O1 - - <br />1 3 <br />14 " Pe'eU&1nq hie Drn�rin9 Should Verify <br />=1fp►RM001" Bir no Ing The Si#: Of Work <br />STORM DRAIN MAINTENANCE HOLES AND STORM DRAIN INLETS SCHEDULE (CAROLINA STREET) <br />Item <br />Location <br />Remark <br />Rim <br />Elev <br />Inverts <br />SDMH (6) <br />Existing <br />Sta 13+96 5' Rt <br />Maintain existing grate <br />elevation <br />43.65 <br />39.95 <br />12" E (IN) <br />39.18 <br />18" S (OUT) <br />39.18 <br />18" W (IN) <br />SDMH (7) <br />New <br />Sta 13+60 5' Rt <br />Rt <br />Install new Storm Drain <br />Maintenance Hole Type <br />43.62 <br />39.28 <br />18" IN (IN) <br />39.28 <br />18" E (OUT) <br />39.78 <br />12" N (IN) <br />SDMH (8) <br />New <br />Sta 12+71 5' Rt <br />Install new Storm Drain <br />43.64 <br />39.56 <br />39.56 <br />40.80 <br />Maintenance Hole Type 1 <br />18" W (IN) <br />18" E (OUT) <br />12" N (IN) <br />SDMH (12) <br />New <br />Sta 10+60 5' Rt <br />Install new Storm Drain <br />43.63 <br />40.20 <br />40.20 <br />40.20 <br />40.20 <br />Maintenance Hole Type 1 <br />18" E (OUT) <br />12" SW (IN) <br />18" W (IN) <br />12" NW (IN) <br />SDI (14) <br />New <br />Stu 10+46 17.5' Rt <br />Install new Storm Drain Inlet <br />43.17 <br />40.30 <br />(Type 1) SJCo Std D -13A <br />12" NE (our <br />SDI (15) <br />New <br />Stu 10+46 21.5' Lt <br />Install new Storm Drain Inlet <br />42.89 <br />40.30 <br />(Type 1 SJCo Std D -13A <br />12" SE (OUT) <br />SDI (9) <br />New <br />Stu 12+71 21.5' Lt <br />Install new Storm Drain Inlet <br />42.89 <br />41.00 <br />(Type 1) SJCo Std 0-13A <br />12" s (IN) <br />SDI (10) <br />Existing <br />Sta 12+71 25.5' Lt <br />SDI to be abandoned <br />40.77 <br />and plug with concrete <br />12" E (OUT) <br />SDI (1 1) <br />Existing <br />Sta 13+11 21.5' Lt <br />Maintain existing grate <br />43.03 <br />40.40 <br />SDI to remain in place <br />elevation <br />12" s (OUT) <br />No. 42581 <br />9 Cl VIS <br />aF <br />David Mendoza <br />RCE 42581 <br />PROJECT ENGINEER DATE CHECKED BY DATE 0 40 100 WOODBRIDGE STREETS IMPROVEMENTS(PHASE III SNO� OCOUNTY OF SAN JOAQUINSHEETS <br />, 1 1 1 1 - PLANS AND PROFILES <br />SCALE IN FEET (Orange Street, Carolina Street and Academy Street) 4 11 <br />