My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C578 - C588
PublicWorks
>
VAULT MAPS
>
Large Plans - LP
>
Drawer C
>
C500 thru
>
C578 - C588
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/15/2025 12:18:17 PM
Creation date
8/2/2023 4:45:41 PM
Metadata
Fields
Template:
Large Plans - LP
Project
Cardinal Avenue Realignment
Limits
Weber Avenue to 500 Feet North of Stockton Terminal and Eastern Railroad
Year
2010
Project Engineer
Vincent Li
Roads Worked
Cardinal Avenue
Red Lines
No
Supplemental fields
Cross Ref
C578 - C588
Type
Realignment
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
COUNTY OF SAN JOAQUIN <br />DEPARTMENT OF PUBLIC WORKS <br />STOCKTON, CALIFORNIA <br />PROJECT PLANS FOR <br />CARDINAL AVENUE REALIGNMENT <br />(Weber Avenue to 500 Feet North of Stockton Terminal and Eastern Railroad) <br />INDEX OF SHEETS <br />SHEET NO. <br />1 TITLE PAGE <br />SHEET NO. <br />2 DETOUR PLAN <br />SHEET NO. <br />3 TYPICAL SECTION AND GENERAL NOTES <br />SHEET NO. <br />4 DEMOLITION PLAN <br />SHEET NO. <br />5 SURVEY CONTROL SHEET <br />SH EET NO, <br />6 -- 7 PLAN AND PROFILE <br />SHEET NO. <br />8 SUPERELEVATION DIAGRAM <br />SHEET NO. <br />9 SIGNING AND STRIPING PLAN <br />SHEET NO, <br />10 CONSTRUCTION DETAILS <br />SHEET NO. <br />11 SUMMARY OF QUANTITIES <br />Cross Sections <br />available upon request. <br />APPLICABLE STATE STANDARD PLANS SP <br />A10A, A1013, <br />A20A, A208, RSP A24C, A24D, A73C, A8713, <br />& RSP A88A <br />APPLICABLE <br />S.J. COUM IMPROVEMENT SARDS <br />CW—C1, CW—C3, <br />CW—C13, R-24, CW—M1, CW—R36, <br />CW—M9, D-13, <br />CW—D14, & CW—M7 <br />ABBREVIATIONS <br />(In addition <br />to listings in SP A10A & A108) <br />0 = <br />Diameter <br />Rdwy = <br />Roadway <br />SJCO STD = <br />San Joaquin County Standard <br />CG&S = <br />Curb, Gutter and Sidewalk <br />SD = <br />Storm Drain <br />S =Sanitary <br />SP = <br />Standard Plans <br />SDI = <br />Storm Drain Inlet <br />SY = <br />Square Yards <br />CY = <br />Cubic Yards <br />LF = <br />Linear Feet <br />The Contractor shall po: sess a Class A License <br />at the time this contract is awarded. <br />AVOID CUTTING UNDERGROUND <br />UTILITY LINES ITS COSTLY <br />Call <br />before you <br />Djg <br />1-800-221-2600 <br />UNDERQROURD SERVICE ALERT [ U 8 A] <br />To Be Supplemented by Standard Plans Dated May 2006 <br />j/,' � `' � 1��� �� : � \�= i� ''� � 1 •`,y 1, ',•! - 'x' <br />It 1 `.., � �• t � =_ 1 <br />�-'r� y ;' 1 l ;�"`"i • � � i ; ter•' j ^� ,ti't <br />1.y� • � `�':1--- ..r- - _ ��" �=_; • j _ � jam- 1 <br />DRAWN BY DATE PROJECT ENGINEER DATE CHECKED DATE APPROVAL RECOMMENDED DATE <br />FILE NAME DRAWER SHEET NO. ACAD REVISIONS DATE <br />E:\Prajects\2008\Cardinal Ave Realignment\Plans\Cardinal All.dwg <br />1 ! •1 <br />PROJECT 11 ` <br />LOCATION j ! <br />;;: � L• -��- 'r"•-1.111_•• • `�y �•-%....-�+ '\ <br />', � }sal �`t -!' •�� ��. `.�� %� � <br />PROJECT LOCATION MAP <br />COUNTY OF SAN JOAQUIN <br />0 1,000 2,000 <br />Scale in Feet <br />NO SCALE <br />1 <br />, <br />1 <br />, <br />1 <br />, <br />i� <br />•- <br />ON 133HS I H3MV�10 I <br />COUNTY OF SAN JOAQUIN <br />Submitted, 1.4- �►� 2010 <br />TH 0 MAS RYAN FLI N N <br />DIRECTOR OF PUBLIC WORKS <br />Peter D. Martin <br />Registered Civil Engineer <br />CARDINAL AVENUE REALIGNMENT <br />TITLE PAGE (Weber Avenue to 500 Feet North of Stockton Terminal and Eastern Railroad) <br />SHEET I TOTAL <br />No. SHEETS <br />1 � 1� <br />
The URL can be used to link to this page
Your browser does not support the video tag.