Laserfiche WebLink
z <br />D <br />m <br />NOTE: <br />1. The Contractor must obtain an Encroachment Permit <br />from the City of Lodi for traffic control or any work <br />within the city's jurisdiction on the south end of the <br />bridge. Payment for this will be considered to be <br />included in the various items of work. <br />2. Deck <br />drainage <br />facilities <br />shall be protected to <br />prevent <br />H.M.W.M. <br />runoff <br />into the <br />waterway. <br />Irrigation Canal <br />3. Joints, drainage facilities, survey monument and <br />pavement markers shall be protected to prevent <br />contamination by the treated material. <br />4. Contractor is to reestablish <br />with exsiting traffic striping <br />are to be maintained. <br />LEGEND <br />traffic striping in accordance <br />Existing bridge lane widths <br />Limit of Work (Treat concrete bridge deck with H.M.W.M.) <br />75' <br />64' <br />27' 10' 27' <br />I <br />2% 2% <br />COUNTY OF' SAN <br />DRAWN BY DATE <br />eKLCPiJ1P.l�O� .:�45 <br />SECTION A—A <br />NTS <br />JOAQUIN I NO SCALE <br />Tubular <br />Hand Raili <br />Concrete <br />Barrier <br />2-6" Ducts <br />(Both Sides) <br />�2 <br />�t(4nI(4 <br />n � o <br />o � o <br />a <br />PLANLO CD <br />NTS <br />2015 <br />CONCRETE BRIDGE <br />DECK <br />SEAL <br />sheet <br />No. <br />Chestnut Street <br />Bridge No. 29C-398 across <br />Woodbridge <br />Irrigation Canal <br />I 12 of <br />13 <br />