My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SP6527 - SP6539
PublicWorks
>
VAULT MAPS
>
Small Plans - SP
>
SP6055 - SP6717
>
SP6527 - SP6539
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/8/2024 12:28:00 PM
Creation date
8/7/2023 3:51:11 PM
Metadata
Fields
Template:
Small Plans - SP
Project
2014 Concrete Bridge Deck Seal 2015 Concrete Bridge Deck Seal
Limits
Shelton Road Bridge 29C-107 (Across Calveras River) Corral Hollow Road Bridge No. 29C-186 (Across Delta Mendota Canal) Macarthur Drive Bridge No. 29C-349 (Across Corral Hollow Creek) Jack Tone Road Bridge No. 29C-411 (Across North Littlejohn Creek)
O'Dell Avenue Bridge No. 29C-098 (Across Walker Slough) Hollenbeck Road Bridge No. 29C-344 (Across South Branch of Duck Creek) Main Street Bridge No. 29C-390 (Across Diverting Canal) Chestnut Street Brisge No. 29C-398 (Across Woodbridge Irrigation District)
Year
2015
Project Engineer
Juan Acevedo
Roads Worked
Shelton Rd., Corral Hollow Rd., Macarthur Dr., Jack Tone Rd.
O'Dell Ave., Hollenbeck Rd., Main St., Chestnut St.
Red Lines
Yes
Project #
220090 & 220093
Federal #
Federal-Aid Project No. BPMPL 5929 (258) & (263)
Supplemental fields
Bridge #
29C-107
29C-186
29C-349
29C-369
29C-411
29C-098
29C-344
29C-390
29C-398
Classification
Record Drawings
Cross Ref
SP6527 - SP6539
Type
Concrete Bridge Deck Seal
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
s <br />m <br />n <br />m <br />Shelion <br />CA�� <br />Utility Opening <br />COUN'hY OF SAN JOAQUIN <br />DRAWN BY DATE PROJECT ENGINEER DATE <br />NOTE: <br />Metal Beam 1. Deck edges and drainage facilities shall be protected to <br />Bridge Railing prevent H.M.W.M. runoff into the waterway. <br />2. Joints, drainage facilities and survey monuments shall be <br />protected to prevent contamination by the treated material. <br />NO SCALE <br />3. Chip Seal Grinding is to remove no more than 1/4" of <br />concrete deck surface. <br />4. Contractor is to reestablish traffic striping in accordance with <br />exsiting traffic striping. Existing bridge lane widths are to be <br />maintained. <br />LEGEND <br />Limits of Treating concrete bridge deck with H. M.W.M. <br />® Limit of Removing Chip Seal <br />GENERAL PLAN <br />APPROVAL RECOMMENDED <br />DATE <br />Ion <br />Z^ — <br />2014 <br />CONCRETE BRIDGE <br />0 <br />�o <br />I Sheet <br />No. <br />Shelton <br />Road Bridge No. 29C-107 across Calaveras River <br />2 of <br />13 <br />,o <br />NOTE: <br />Metal Beam 1. Deck edges and drainage facilities shall be protected to <br />Bridge Railing prevent H.M.W.M. runoff into the waterway. <br />2. Joints, drainage facilities and survey monuments shall be <br />protected to prevent contamination by the treated material. <br />NO SCALE <br />3. Chip Seal Grinding is to remove no more than 1/4" of <br />concrete deck surface. <br />4. Contractor is to reestablish traffic striping in accordance with <br />exsiting traffic striping. Existing bridge lane widths are to be <br />maintained. <br />LEGEND <br />Limits of Treating concrete bridge deck with H. M.W.M. <br />® Limit of Removing Chip Seal <br />GENERAL PLAN <br />APPROVAL RECOMMENDED <br />DATE <br />Ion <br />Z^ — <br />2014 <br />CONCRETE BRIDGE <br />DECK SEAL <br />I Sheet <br />No. <br />Shelton <br />Road Bridge No. 29C-107 across Calaveras River <br />2 of <br />13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.