Laserfiche WebLink
m <br />z <br />0 <br />NOTE: <br />1. Deck edges and drainage facilities shall be protected to <br />prevent H.M.W.M. runoff into the waterway. <br />2. Joints, drainage facilities, survey monument and pavement <br />markers shall be protected to prevent contamination by the <br />treated material. <br />3. Chip Seal Grinding is to remove no more than 1�4" of <br />concrete deck surface. <br />4. Contractor is to reestablish traffic striping in accordance with <br />exsiting traffic striping. Existing bridge lane widths are to be <br />maintained. <br />MacArthur Drive <br />SECTION A—A <br />NTS <br />COUNTY OF SAN JOAQUIN <br />DRAWN BY I DATE I QROJECTENOINEER DATE <br />C <br />LEGEND <br />42' <br />Limits of Treating concrete bridge deck with H. M.W. M. <br />® Limit of Removing Chip Seal <br />NO SCALE I GENERAL PLAN I 2014 CONCRETE BRIDGE DECK SEAL <br />MacArthur Drive Bridge No. 29C-369 across Corral Hollow Creek <br />ul� <br />40' <br />Sheet No. <br />5 of 13 <br />0_ <br />C7 <br />m <br />m <br />= <br />F <br />o <br />0 <br />PLAN <br />NTS <br />Limits of Treating concrete bridge deck with H. M.W. M. <br />® Limit of Removing Chip Seal <br />NO SCALE I GENERAL PLAN I 2014 CONCRETE BRIDGE DECK SEAL <br />MacArthur Drive Bridge No. 29C-369 across Corral Hollow Creek <br />ul� <br />40' <br />Sheet No. <br />5 of 13 <br />