Laserfiche WebLink
s <br />BB 314+73 <br />ELEV 86.24 <br />Jack Tone Road <br />315+00 316+00 <br />BEGINNING OF <br />STRIPING PLAN <br />Jack Tone Road <br />319+00 <br />2 <br />LEGEND: <br />1 Detail 22, SP A20A <br />A I O2 Detail 2713 <br />, SP A20B <br />M <br />M <br />COUNTY OF SAN JOAQUIN <br />DRAWN BY DATE PROJECT ENGINEER DATE <br />�relvec% <br />NO SCALE <br />CHECKED <br />2 <br />EB 321 +86 <br />END OF <br />Z STRIPING PLAN <br />NOTE: <br />Stations are based on the centerline of the existing bridge. <br />Thermoplastic edgling will begin at skewed beginning of bridge <br />and continue to skewed end of bridge. <br />2. Contractor is to reestablish traffic striping in accordance with <br />exsiting traffic striping. Existing bridge lane widths are to be <br />maintained. <br />STRIPING PLAN 2014 CONCRETE BRIDGE DECK SEAL Sheet No. <br />Jack Tone Road Bridge No. 29C-411 across North Littlejohn Creek 7 of 13 <br />DATE APPROVAL RECOMMENDED DATE <br />