Laserfiche WebLink
C <br />m Y <br />M 40' U PLAN NOTE: A <br />4' <br />32' NTS 1. The Contractor must obtain an Encroachment Permit from the City of <br />r o Stockton for traffic control or any work within the city's jurisdiction. Payment <br />in I1 n for this will be considered to be included in the various items of work. <br />7 <br />x <br />P <br />0 <br />z <br />SECTION A -A <br />NTS <br />COUNTY <br />2. Deck drainage facilities shall be protected to prevent H. M.W.M. runoff into the <br />waterway. <br />3. Joints, drainage facilities, survey monument and pavement markers shall be <br />Steel Railing protected to prevent contamination by the treated material. <br />4. Chip Seal Grinding is to remove no more than 1/4" of concrete deck surface. <br />5. Contractor is to reestablish traffic striping in accordance with exsiting traffic <br />striping. Existing bridge lane widths are to be maintained. <br />LEGEND <br />Limit of Work (Treat concrete bridge deck with H.M.W.M.) <br />® Limit of Removing Chip Seal <br />GENERAL PIAN 2015 CONCRETE BRIDGE DECK SEAL Sheet No. <br />O'Dell Avenue Bridge No. 29C-098 across Walker Slough 9 of 13 <br />OF SAN JOAQUIN � NO SCALE <br />DRAWN BY DATE P JECT ENGINEER <br />