Project
Lehman Road Resurfacing
Limits
Linne Road to Ahern Road
Year
2015
Project Engineer
Hadi Tabatabaee
Roads Worked
Lehman Rd.
Red Lines
Yes
Project #
220116
Supplemental fields
Classification
Record Drawings
Cross Ref
SP6591 - SP6598
Type
Resurfacing
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
GENERAL NOTES: <br />Const <br />Limits of Clearing and Grubbing <br />1. From Sta 10+13 to Sto 63+33, 0.25' Hot Mix Asphalt Overlay must be placed and Mailbox Relocation <br />in two (2) layers of approximately equal thickness with Geosynthetic Pavement <br />Interlayer (Paving Fabric) placed between the layers. — Limits of Earthwork <br />(Misc Areas) <br />2. From Sta 63+33 to Sto 137+46, Hot Mix Asphalt Overlay must be placed in I f @ <br />two (2) layers of approximately equal thickness with Geosynthetic Pavement 4' 4'* 1' <br />Interlayer (Paving Fabric) placed on the existing or prepared surface. <br />3. Placement of Hot Mix Asphalt Overlay must not begin until the Hot Mix Asphalt I w Conform <br />used in Pavement Repair has been in place for a minimum of 18 hours. I B9 _ _rv�+ <br />------------ <br />- - <br />4. Placement of Hot Mix Asphalt Driveways must not begin until the Hot Mix <br />Asphalt used for Mainline Paving has been completed. ----- ---- - J <br />Shoulder <br />5. Existing highway and utility facilities must remain in place unless otherwise I Vor Depth HMA <br />0.25' Shoulder Backing <br />noted. <br />6. Existing trees, shrubs, fences, mailboxes and other frontage improvements must Existing Roadway <br />remain in place unless otherwise noted. <br />7. Existing drainage facilities must remain in place unless otherwise noted. The EARTHWORK (MISC AREAS) DETAIL I <br />Contractor must conduct earthwork operations so as not to obstruct the existing Lehman Road: Sta 36+17 Rt to Sta 38+19 Rt <br />drainage. * 2' between Sta 36+24 and Stq 3f*-1� <br />8. All Earthwork, except for final shoulder grading, must be completed prior to <br />< placing the final layer of Hot Mix Asphalt Pavement. No Shoulder Backing <br />material will be deposited or drifted on the final layer of Hot Mix Asphalt 45 <br />z surfacing. Where the shoulder placement exceeds 0.50' in thickness, the Const <br />o Shoulder Backing must be placed in two (2) or more fully compacted layers. Limits of Clearing and Grubbing <br />ell <br />g n and Mailbox Relocation <br />A y 9. Shoulder Backing material at all intersection radii must receive Penetration <br />Treatment at 0.25 gallon/square yard. Limits of the Penetration Treatment work I Limits of <br />M must be confined to intersection radii plus fifty feet (50') in each direction or I Earthwork <br />z 6 (Misc Areas) <br />D to the intersection conform, <br />z m 10. The Contractor will be responsible for adequately scheduling inspection and G► - 3' 1' 1' <br />testing of all facilities constructed under this contract with a minimum 24 hour a Conform <br />g notice to the County. All testing must conform to the Standard Specifications. I w <br />A All re-testing will be paid by the Contractor. 8q ----- <br />11. Prior to commencing any work, it will be the Contractor's responsibility to haveI oaf Exist Shoulder <br />each utility company locate in 'the field their main service lines and laterals. <br />---------- <br />- --- <br />P <br />The Contractor must notify members of the Underground Service Alert (U.S.A.) -0.25' HMA Overlay <br />48 hours in advance of performing excavation work by calling the toll free 0.25' Shoulder Backing <br />3� number (1-800-227-2600). Existing Roadway <br />p 12. Railroad Note: The Contractor must enter into an Agreement with the Union <br />Pacific Railroad (UPRR) for any work within the Railroad's right-of-way. See EARTHWORK (MISC AREAS) DETAIL II <br />n SECTION 5-1.20C Railroad Relations of the Specifications for further details. Lehman Road: Sto 123+60 Rt to Sta 124+60 Rt <br />P <br />M <br />l' <br />o L NOTES AND LEHMAN ROAD RESURFACING Sheet <br />EARTHWORK DETAILS (Linne Road to Ahern Road) 3 of <br />DRAWN BY DATE PROJECT ENGINEER DATE CHECKED DATE <br />R. gorsdorf 02/2015 <br />COUNTY OF SAN JOAQUIN NO SCALE GENERA <br />No. <br />8 <br />