My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SP6219 - SP6225
PublicWorks
>
VAULT MAPS
>
Small Plans - SP
>
SP6055 - SP6717
>
SP6219 - SP6225
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/8/2024 12:03:36 PM
Creation date
8/11/2023 11:18:07 AM
Metadata
Fields
Template:
Small Plans - SP
Project
Christina Avenue and De Ovan Avenue Resurfacing
Limits
Plymouth Road to Mission Road
Year
2013
Project Engineer
Hadi Tabatabaee
Roads Worked
Christina Ave., De Ovan Ave.
Red Lines
No
Supplemental fields
Cross Ref
SP6219 - SP6225
DocCategory
Improvement Plans
Type
Resurfacing
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
PAVEMENT REPAIR <br />Location Quantity <br />3 Locations Total 14 SQYD <br />PLANING ASPHALT CONCRETE PAVEMENT <br />Location <br />Chri:stino <br />Avenue <br />2,805 <br />SQYD <br />1,753 <br />Sto <br />10+15 <br />to <br />Sta <br />17+53 <br />Ste <br />17+67 <br />to <br />Sto <br />26+79 <br />Sta <br />28+04 <br />to <br />Ste <br />33+78 <br />Sta <br />33+96 <br />to <br />Sta <br />45+06 <br />L! Ly <br />2,342 <br />SQYD <br />2,805 <br />SQYD <br />1,753 <br />SQYD <br />3,489 <br />SQYD <br />De Ovan <br />Avenue <br />locations will <br />be <br />determined <br />Sta <br />10+15 <br />to <br />Ste <br />17+47 <br />2,443 <br />SQYD <br />Sta <br />17+68 <br />to <br />Sta <br />26+68 <br />2,865 <br />SQYD <br />Sta <br />27+97 <br />to <br />Sto <br />33+61 <br />1,838 <br />SQYD <br />Ste <br />33+81 <br />to <br />Sta <br />44+88 <br />3,587 <br />SQYD <br />PROTECTION FOR EXISTING DRAINAGE INLET <br />Width (4' minimum). Dimensions and <br />Note: The Storm Drain Inlet Protection unit (Catch Basin Filter) is <br />to remain in place and functioning from the beginning of the <br />working days until the end of the project. <br />COUNTY OF SAN JOAQUIN [ rio sca�E <br />R. POYSGiOYf 1032013 <br />Total 213122 SQYD <br />Existing <br />Roadway <br />ASPHALT CONCRETE (TYPE B) <br />Location Quantity <br />Pavement Repair 3 TON <br />Mainline 3,520 TON <br />0.25' Asphalt Concrete <br />PAVEMENT REPAIR DETAIL <br />NOTE: <br />locations will <br />be <br />determined <br />by the Engineer <br />* 0.25' AC <br />shall be total <br />below planed <br />surface <br />prior <br />to 0.25' AC overlay. <br />Road to Mission <br />Total 3,523 TON <br />Planing <br />Surface <br />Sheet No. <br />7 of 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.