My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SP6704 - SP6708
PublicWorks
>
VAULT MAPS
>
Small Plans - SP
>
SP6055 - SP6717
>
SP6704 - SP6708
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/8/2024 1:14:53 PM
Creation date
8/11/2023 4:08:31 PM
Metadata
Fields
Template:
Small Plans - SP
Project
Collier Road Resurfacing
Limits
Linn Road to Mackville Road
Year
2016
Project Engineer
Hadi Tabatabaee
Roads Worked
Collier Road
Red Lines
Yes
Project #
220112
Supplemental fields
Classification
Record Drawings
Cross Ref
SP6704 - SP6708
Type
Resurfacing
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
I <br />Const <br />I <br />ts of Clearing and Grubbing and Mailbox Relocation <br />1, 2 2 22' <br />I <br />1 20' Geosynthetic Pavement Interlayer (Paving Fabric) 1' <br />�SE� �SE�— <br />_ aa' Mof. .-_ ch Exist Motch Exisf � 8,g. `l <br />Conform —� Conform <br />-------------- <br />30° <br />30° i <br />-------- -------J <br />--------------- <br />Grade existing ground to place <br />-------------------- Variable Depth <br />Safety Edge 1' minimum width (Typ) 0.25' HMA Overlay TExisting Roadway Shoulder Backing (Typ) <br />TYPICAL SECTION <br />zN Collier Road: Sta 10+10 to Sta 66+38 <br />N tg <br />0'M <br />NG <br />GENERAL NOTES: <br />00 <br />o� <br />�p 1. 0.25' Hot Mix Asphalt Overlay must be placed in two (2) layers of approximately equal thickness with Geosynthetic Pavement Interlayer <br />g 0 (Paving Fabric) placed on the existing or prepared surface. <br />M o 2. Placement of Hot Mix Asphalt Overlay must not begin until the Hot Mix Asphalt used in Pavement Repair has been in place for a minimum <br />of 18 hours. <br />z Z 3. Placement of Hot Mix Asphalt Driveways must not begin until the Hot Mix Asphalt used for Mainline Paving has been completed. <br />3 4. Existing highway and utility facilities must remain in place unless otherwise noted. <br />5. Existing trees, shrubs, fences, mailboxes and other frontage improvements must remain in place unless otherwise noted. <br />E6. Existing drainage facilities must remain in place unless otherwise noted. The Contractor must conduct earthwork operations so as not to <br />modify or obstruct the existing drainage. <br />g 7. All Earthwork, except for final shoulder grading, must be completed prior to placing the final layer of Hot Mix Asphalt Pavement. No <br />Shoulder Backing material will be deposited or drifted on the final layer of Hot Mix Asphalt surfacing. Where the shoulder placement exceeds <br />0.50' in thickness, the Shoulder Backing must be placed in two (2) or more fully compacted layers. <br />8. Shoulder Backing material at all intersection radii must receive Penetration Treatment at 0.25 gallon/square yard. Limits of the Penetration <br />U) Treatment work must be confined to intersection radii plus fifty feet (50') in each direction or to the intersection conform. I D RA * J� %i A t( <br />9. The Contractor will be responsible for adequately scheduling inspection and testing of all facilities constructed under this contract with a e �/ �' er <br />o minimum 24 hour notice to the County. All testing must conform to the Standard Specifications. All re—testing will be paid by the <br />Contractor.'killNrly PW',` <br />_.h�,oy orb Vw�r <br />TYPICAL SECTION AND COLLIER ROAD RESURFACING Sheet No. <br />COUNTY OF SAN JOAQUIN NO SCALE GENERAL NOTES (Linn Road fo Mackville Road) 2 of 5 <br />DRAWN BY DATE PROJECT ENGINEER DATE CHECKED DATE <br />
The URL can be used to link to this page
Your browser does not support the video tag.