Laserfiche WebLink
W0 <br />OM <br />A � <br />00 <br />NF <br />OM <br />0 <br />a <br />o D <br />m D <br />0 o <br />M� <br />r <br />m <br />0 <br />iZ <br />D <br />S3 <br />z m <br />0 <br />p <br />O <br />D <br />F <br />PLANING ASPHALT CONCRETE PAVEMENT <br />Location Quantity <br />Sta 10+10 to Sto 10+60 275 SQYD <br />Sta 65+88 to Sta 66+38 127 SQYD <br />Total 402 SQYD <br />PAVEMENT REPAIR <br />Location Quantity <br />63 Locations Total 254 SQYD <br />SHOULDER BACKING <br />Location Quantity <br />Sta 10+10 to Sta 66+38 Total 627 TON <br />DRIVEWAY (TYPE D) <br />Location Quantity <br />17 Locations Total 389 SQYD <br />DRIVEWAY (TYPE E) <br />Location Quantity <br />21 Locations Total 430 SQYD <br />COUNTY OF SAN JOAQUIN No SCALE <br />DRAWN BY DATE PROJECT ENGINEER DATE <br />z, gorsdovf o�/2ois �l � -� 0% /Av/4 <br />SUMMARY OF QUANTITIES <br />CHECKED, DATE <br />PENETRATION TREATMENT <br />Location Quantity <br />2 Locations (Radii) Total 108 SQYD <br />HOT MIX ASPHALT (TYPE A) <br />Location Quantity <br />Pavement Repair 51 TON <br />Transition Areas 82 TON <br />Driveways (Types D & E) 124 TON <br />Mainline 27254 TON <br />Total 2,511 TON <br />GEOSYNTHIC PAVEMENT INTERLAYER <br />(PAVING FABRIC) <br />Location Quantity <br />Sta 10+60 to Sta 65+88 Total 12,757 SQYD <br />PLACE MONUMENT FRAME AND COVER <br />Location Quantity <br />Sto 41+16 Total 1 EA <br />.,ORD DRAW <br />-4ff"Oroa Ety_ <br />'40 Chenr� B; <br />O'llew I <br />COLLIER ROAD RESURFACING <br />(Linn Road to Mackville Road) <br />Sheet No. <br />5 of 5 <br />