My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SP6709 - SP6712
PublicWorks
>
VAULT MAPS
>
Small Plans - SP
>
SP6055 - SP6717
>
SP6709 - SP6712
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/8/2024 1:15:30 PM
Creation date
8/11/2023 4:12:27 PM
Metadata
Fields
Template:
Small Plans - SP
Project
Durham Ferry Road Resurfacing
Limits
1.5 Miles west of Kasson Road to Kasson Road
Year
2016
Project Engineer
Toshiro Sessoms
Roads Worked
Durham Ferry Rd.
Red Lines
Yes
Project #
220113
Supplemental fields
Classification
Record Drawings
Cross Ref
SP6709 - SP6712
Type
Resurfacing
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
s <br />L� v <br />o <br />m <br />z <br />0 <br />y 1' —1'-2' 4' - <br />o -- <br />o y TE <br />B <br />Grade existing ground to place <br />TE 1' minimum width (Typ) <br />Const <br />Limits of Clearing and Grubbing and Mailbox Relocation <br />I <br />--- 24' — <br />1 <br />22' Geosynthetic Pavement Interlayer (Paving Fabric) - <br />30° - Motch Exist <br />0.30' HMA Overlay <br />TYPICAL SECTION <br />Sta 8+50 to Sta 84+43 <br />Motch Exlst� 30' <br />L- Existing Roadway <br />CORO DRAWINr; <br />Vey l;i ^- <br />Using , rns Drawing Should VsrN+ <br />,� i+►f�nretir�n irdP"V The Site Of Whir <br />42' 1' <br />1' 0 <br />I a <br />TE o <br />.1 L.c� 3 <br />Variable Depth <br />Shoulder Backing (Typ) <br />GENERAL NOTES: <br />1. 0.30' HMA Overlay must be placed in two (2) layers of approximately equal thickness with Geosynthetic Pavement Interlayer (Paving Fabric) placed between the layers. <br />2. Placement of HMA Overlay must not begin until the HMA used in Pavement Repair has been in place for a minimum of 18 hours. <br />3. Placement of HMA Driveways must not begin until the HMA used for Mainline Paving has been completed. <br />4. Existing highway and utility facilities must remain in place unless otherwise noted. <br />5. Existing trees, shrubs, fences, mailboxes and other frontage improvements must remain in place unless otherwise noted. <br />6. Existing drainage facilities must remain in place unless otherwise noted. The Contractor must conduct earthwork operations so as not to modify or obstruct the existing drainage. <br />7. All Earthwork, except for final shoulder grading, must be completed prior to placing the final layer of HMA overlay. No Shoulder Backing material will be deposited or drifted on the final <br />layer of HMA surfacing. Where the shoulder placement exceeds 0.50' in thickness, the Shoulder Backing must be placed in two (2) or more fully compacted layers. <br />8. The Contractor will be responsible for adequately scheduling inspection and testing of all facilities constructed under this contract with a minimum 24 hour notice to the County. All <br />testing must conform to the Standard Specifications. All re—testing will be paid by the Contractor. <br />COUNTY OF SAN JOAQUIN NOT TO SCALE <br />DRAWN BY DATE PROJECT ENGINEER /DATE <br />xn <br />JoelQuila+ita01/16 yta�-S V/ (11 <br />TYPICAL SECTION AND <br />GENERAL NOTES <br />CHECKED DATE <br />DURHAM FERRY ROAD RESURFACING <br />(1.5 miles west of Kasson Road to Kasson Road) <br />Sheet No. <br />2 of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.