My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SP6713 - SP6717
PublicWorks
>
VAULT MAPS
>
Small Plans - SP
>
SP6055 - SP6717
>
SP6713 - SP6717
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/8/2024 1:16:00 PM
Creation date
8/11/2023 4:15:02 PM
Metadata
Fields
Template:
Small Plans - SP
Project
Lone Tree Road Resurfacing
Limits
French Camp Road to Murphy Road
Year
2016
Project Engineer
Hadi Tabatabaee
Roads Worked
Lone Tree Rd.
Red Lines
Yes
Project #
220117
Supplemental fields
Classification
Record Drawings
Cross Ref
SP6713 - SP6717
Type
Resurfacing
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
PAVEMENT REPAIR <br />Location Quantity <br />68 Locations Total 661 SQYD <br />ADJUST FRAME AND COVER <br />(MONUMENT BOX) <br />Location Quantity <br />Sto 62+08 10' Rt 1 EA <br />Ste 88+51 4' Lt 1 EA <br />Total 2 EA <br />ADJUST FRAME AND COVER <br />(SSJID WATER VALVE) <br />Location Quantity <br />Water Valve <br />Sto 12+54 7' Rt 1 EA <br />Sto 34+15 7' Rt 1 EA <br />Sta 35+76 9' Rt 1 EA <br />Sto 37+70 7' Rt 1 EA <br />Ste 86+51 6' Rt 1 EA <br />Sto 114+45 6' Rt 1 EA <br />Total 7 EA <br />GEOSYNTHETIC PAVEMENT INTERLAYER <br />(PAVING FABRIC) <br />Location Quantity <br />Sta 11+02 to Sto 88+52 W <br />Z2' 17,222 SQYD <br />Sta 88+52 to Sta 1 14+32 �' Z2' 6,020 SQYD <br />Total Z**C SQYD <br />COUNTY OF SAN JOAQUIN No SCALE <br />DRAWN BY DATE PROJECT ENGINEER DATE <br />R-. P01'S D�OVf 0C/2015 r7•/IyOM(rc- /�Z/r� <br />ADJUST FRAME AND COVER <br />(SSJID CATHODIC PROTECTION TEST) <br />Location Quantity <br />Water Valve <br />Sto 37+65 15' Rt 1 EA <br />Sto 68+66 17' Rt 1 EA <br />Ste 86+44 16' Rt 1 EA <br />Ste 92+64 6' Rt WATER VALVE' J>EA <br />Ste 114+40 17' Rt tALET(r or EA <br />Total 3 EA <br />ADJUST FRAME AND COVER <br />(SSJID MAINTENANCE HOLE) <br />Location Quantity <br />Sto 35+76 16' Rt SSJID 1 EA <br />ADJUST FRAME AND COVER <br />(SSJID UTILITY VAULT) <br />Location Quantity <br />Irrigation Vaults <br />Sta 12+56 15' Rt 1 EA <br />Sta 34+18 15' Rt 1 EA <br />Sta 37+71 15' Rt 1 EA <br />Sta 86+49 16' Rt 1 EA <br />Sta 114+36 17' Rt 1 EA <br />Total 5 EA <br />PENETRATION TREATMENT <br />Location Quantity <br />5 Locations (Radii) Total 231 SQYD <br />SUMMARY OF QUANTITIES <br />CHECKED DATE <br />SHOULDER <br />9+38 <br />BACKING <br />(Due Road) <br />Location <br />Sta <br />94+67 <br />Quantity <br />Sta 10+48 to Sto 114+82 <br />Road) Total 6.5 STA <br />Total <br />964 TON <br />EARTHWORK (MISCELLANEOUS AREAS) <br />Location Quantity <br />Sta <br />9+38 <br />Rt <br />(Due Road) <br />to <br />Sta <br />94+67 <br />Rt <br />(Lone Tree <br />Road) Total 6.5 STA <br />HOT MIX ASPHALT (TYPE A) <br />Location Quantity <br />Pavement Repair 133 TON <br />Intersection Transition Areas 101 TON <br />Driveways (Types D & E) 135 TON <br />Mainline 4,797 TON <br />Total 5,166 TON <br />DRIVEWAY (TYPE D) <br />Location Quantity <br />15 Locations Total 243 SQYD <br />DRIVEWAY (TYPE E) <br />Location Quantity <br />23 Locations Total 555 SQYD <br />LONE TREE ROAD RESURFACING <br />(French Camp Road to Murphy Road) <br />Sheet No. <br />5 of 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.