My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SP6733 - SP6736
PublicWorks
>
VAULT MAPS
>
Small Plans - SP
>
SP6718 - SP7507
>
SP6733 - SP6736
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/8/2024 10:29:35 AM
Creation date
8/11/2023 4:23:44 PM
Metadata
Fields
Template:
Small Plans - SP
Project
Tully Road Resurfacing
Limits
Comstock Road to Eight Mile Road
Year
2016
Roads Worked
Tully Rd.
Red Lines
Yes
Project #
220119
Supplemental fields
Classification
Record Drawings
Cross Ref
SP6733 - SP6736
Type
Resurfacing
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Vl !^ <br />D <br />Jm <br />W <br />101 M <br />0 <br />m <br />m <br />1' <br />-{ TE \ <br />Conformer <br />Grade existing ground to place <br />Tapered Edge 1' minimum width (Typ) <br />GENERAL NOTES: <br />I <br />Const <br />I <br />ts of Clearing and Grubbing and Mailbox Relocation <br />1 <br />22 <br />1 <br />20' Geosynthetic Pavement Interlayer (Paving Fabric) <br />m <br />m <br />1' <br />r TE F-- <br />az Conform <br />30' 30 <br />------- ---------------- - <br />0.30' HMA Overlay Existing Roadway <br />TYPICAL <br />SECTION <br />Tully Road: <br />Sta 10+13 <br />to <br />Sta 64+ <br />Variable Depth <br />Shoulder Backing (Typ) <br />1. 0.30' HMA Overlay must be placed in two (2) layers of approximately equal thickness with Geosynthetic Pavement Interlayer (Paving Fabric) <br />placed between the layers. <br />2. Placement of HMA Overlay must not begin until the HMA used in Pavement Repair has been in place for a minimum of 18 hours. <br />3. Placement of HMA Driveways must not begin until the HMA used for Mainline Paving has been completed. <br />4. Existing highway and utility facilities must remain in place unless otherwise noted. <br />5. Existing trees, shrubs, fences, mailboxes and other frontage improvements must remain in place unless otherwise noted. <br />6. Existing drainage facilities must remain in place unless otherwise noted. The Contractor must conduct earthwork operations so as not to <br />modify or obstruct the existing drainage. <br />7. All Earthwork, except for final shoulder grading, must be completed prior to placing the final layer of HMA Pavement. No Shoulder Backing <br />material will be deposited or drifted on the final layer of HMA surfacing. Where the shoulder placement exceeds 0.50' in thickness, the <br />Shoulder Backing must be placed in two (2) or more fully compacted layers. <br />8. Shoulder Backing material at all intersection radii must receive Penetration Treatment at 0.25 gallon/square yard. Limits of the Penetration <br />Treatment work must be confined to intersection radii plus fifty feet (50') in each direction or to the intersection conform. <br />9. The Contractor will be responsible for adequately scheduling inspection and testing of all facilities constructed under this contract with a N <br />yRAWI <br />minimum 24 hour notice to the County. All testing must conform to the Standard Specifications. All re—testing will be paid by the J�{ t, <br />Contractor. <br />COUNTY OF SAN JOAQUIN <br />NO SCALE I TYPICAL SECTION AND <br />GENERAL NOTES <br />DRAWN BY DATE PROJECT)E GIN ER DATE CHECKED DATE <br />TULLY ROAD RESURFACING <br />(Comstock Road & Eight Mile Road) <br />Sheet No. <br />2 of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.