Laserfiche WebLink
GENERAL NOTES: <br />1. One week prior to the start of work, the Contractor must furnish to the Engineer a schedule showing proposed street closures on each half—day basis. <br />No work will commence until this schedule is approved by the Engineer. <br />2. All intersection radii within project limits must be sealed to lip ofexisting curb and gutter or edge of pavement. <br />3. Surface preparation work must be as directed by the Engineer. Locations and dimensions of Pavement Repair will be determined by the Engineer. Slurry <br />Seal must must not begin until the HMA used in Pavement Repair has been in place for a minimum of 18 hours. <br />4. The aggregate for Slurry Seal must be Type II, <br />5. The Contractor must perform street sweeping throughout the durationof the Slurry Seal operations of the project per the specifications. Full compensation <br />for sweeping operations must be considered as included in the contract unit price paid for Slurry Seal (Type II) item of work and no separate payment <br />will be made therefor. <br />n <br />6. The Contractor must perform Slurry Seal operations on streets whereschools are situated on the weekend or when school is not in session unless allowed <br />by written approval from the Engineer. <br />7. The contractor must not begin slurry sealing a street after 1:00pmwithout the approval from the Engineer. <br />8. Areas in County right—of—way used by Contractor for staging and/orstorage of materials will be approved by the Engineer. The areas utilized by the <br />Contractor for staging and/or storage area must be restored to their original condition. Any damages or unclean conditions to staging or storage areas <br />must be repaired at the Contractor's own expense. It will be the Contractor's responsibility to obtain permission from the property owner to stage <br />j equipment or store materials on private property. The Contractor must provide a letter of release from the property owner of the areas utilized for <br />staging and/or storage of materials. <br />i <br />9. Placement of "No Parking" signs/barricades must be placed no lessthan 72 hours prior to work. <br />10. Existing highway and utility facilities must remain in place unlessotherwise noted. <br />11. Existing trees, shrubs, fences, mailboxes and other frontageimprovements must remain in place unless otherwise noted. <br />12. Existing drainage facilities must remain in place unless otherwise noted. The Contractor must conduct earthwork operations so as not to modify or <br />obstruct the existing drainage. <br />13. The Contractor will be responsible for adequately scheduling inspectionand testing of all facilities constructed under this contract with a minimum 24 hour <br />notice to the County. All testing must conform to the Standard Specifications. All re—testing will be paid by the Contractor. <br />14. The Contractor must obtain an Encroachment Permit from the City ofStockton and City of Tracy for traffic control or any work within the City's <br />jurisdiction. Payment for this will be considered to be included in the various items of work. <br />15. The Contractor must obtain all permits and licenses required for theconstruction and completion of the project, and must perform all work in accordance <br />with the requirements and conditions of all permits and approvals applicable to the project. <br />16. Hand grinding of Asphalt Concrete pavement will be required atlocations where existing highway and utility facilities are within the Pavement Repair limits. <br />Payment for hand grinding will be considered as included in the contract unit price paid for Pavement Repair. <br />17. The Contractor must exercise due caution and carefully preserve survey bench marks, control points, reference points and all survey stakes, and must <br />bear all expenses for replacement and/or errors caused by their unnecessary loss or disturbance. <br />COUNTY OF SAN JOAQUIN <br />DRAWN BY DATE PROJECT <br />Jonathan Curry of/i6 <br />NO SCALE I GENERAL NOTES I SLURRY SEAL LOCAL ROADS 2015-2016 <br />DATE CHECKED DATE <br />Sheet No. <br />2 of 14 <br />