Laserfiche WebLink
Lr) O In I+') M1 (P N <br />a N Lr)N <br />+ + <br />(J) <br />C <br />O Const N n d d- tt $ O5 2 5 40 0 0 0in V) in in (n in EP V)o <br />ntyN 6' — Em <br />�e.71 2 3 oV/�(" CoEP c LD <br />COMMERCE COURT Sta 23+2e <br />Sta 23+180 <br />i a+ +�!►r 1., Match Line Commerce Way Sta 22+93 4 <br />6. Sta 16+68 See Above Right Commerce Court Sto 13+80 o =Corporate Court Sta 23+64 1D OMMERCE WAY in in1z'tz' i ' i2' i2' <br />' I Match Line Corporate Court W <br />LEGEND Sto 22+66 See Sheet 7 Q <br />Sta 17+08 IDetail <br />Detail 31 - Two Way Left Turn Lane <br />Detail 38A - Channelizing Line9 0 A 0mnimum of 48 hours prior to placing <br />Detail 21 - No Passin Zone � Thermoplastic Striping, the Contractor shall <br />4 8 - Loneline O cat -track and obtain San Joaquin County <br />(2 Type V - Arrow <br />Type III - Left/Right Arrow U Traffic Engineering approval. (209) 468-3707 <br />`eta 17+58 Sta 17+58 7 Crosswalk/Limit Line (12" White) <br />Sta 17+68 §Stop <br />Ahead Legend - AHEAD <br />43 Signal Legend - SIGNAL <br />N Legend - STOP <br />3 <br />\� rn (ID4" Solid White Line <br />11 <br />Const EP <br />W cn _ <br />I <br />�W o N <br />7 0 <br />- N LJ <br />o <br />\ 9 � 3o —2 22 3 24 <br />N 5 0 <br />sa�11 0^o cno o � 0000 <br />7 EP(D9-'+ + 8+ + 4 + 3 + + a' S 2 + <br />VO)1 N N +50 0 o + <br />m N <br />N+ <br />0 O o <br />0 C N N 7 <br />\ <br />CO N to 0 t7 <br />V) GATEWAY BOULEVARD in <br />COUNTY OF SAN JOAQUIN NO SCALE <br />DRAWN BY DATE PROJECT ENGINEER DATE <br />Jonathan Curry of/i6-l��/ib <br />STRIPING PLAN <br />CHECKED DATE <br />SLURRY SEAL LOCAL ROADS 2015-2016 <br />Sheet No. <br />6 of 14 <br />