My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SP6764 - SP6770
PublicWorks
>
VAULT MAPS
>
Small Plans - SP
>
SP6718 - SP7507
>
SP6764 - SP6770
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/8/2024 10:47:21 AM
Creation date
8/14/2023 2:55:04 PM
Metadata
Fields
Template:
Small Plans - SP
Project
West Country Club Reconstruction Phase 7
Limits
Christina Avenue: Kirk Avenue to Ryde Avenue
Year
2016
Project Engineer
Enrique Silva
Roads Worked
Christina Ave.
Red Lines
Yes
Project #
220224
Supplemental fields
Classification
Record Drawings
Cross Ref
SP6764 - SP6770
Type
Reconstruction
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
0 <br />0 <br />m <br />0 <br />Q <br />..0 M <br />m <br />z <br />0 <br />DUST CONTROL <br />(NON -WORKING HOURS) <br />LOCATION QUANTITY <br />Project Limits 22 EA <br />ROADWAY EXCAVATION <br />LOCATION QUANTITY <br />Sta 20+13 to Sta 29+39 1,250 CY <br />Sta 30+28 to Sto 36+34 785 CY <br />Total 2,035 CY <br />SUBGRADE ENHANCEMENT <br />GEOTEXT1E (CLASS B2) <br />LOCATION QUANTITY <br />Sto 20+13 to Sta 20+50 189 SQYD <br />Sta 20+50 to Sta 29+34 22947 SQYD <br />Sto 30+28 to Sta 36+00 11907 SQYD <br />Sto 36+00 to Sto 36+34 165 SQYD <br />Total 5,208 SQYD <br />CLASS 2 AGGREGATE BASE <br />LOCATION QUANTITY <br />Sto 20+13 to Sto 20+50 42 CY <br />Sta 20+50 to Sto 29+34 614 CY <br />Sta 30+28 to Sta 36+00 393 CY <br />Sta 36+00 to Sto 36+34 37 CY <br />Total 11087 CY <br />HOT MIX ASPHALT (TYPE A) <br />LOCATION QUANTITY <br />Sta 20+13 to Sta 20+50 42 TON <br />Sta 20+50 to Sta 29+39 608 TON <br />Sto 30+28 to Sta 36+00 388 TON <br />Sto 36+00 to Sto 36+34 36 TON <br />Total 1,074 TON <br />MINOR CONCRETE <br />(CURB, GUTTER AND SIDEWALK) <br />LOCATION QUANTITY <br />Sta <br />20+34 <br />to <br />Sta <br />20+75 <br />(Rt) <br />41 <br />LF <br />Sta <br />21+04 <br />to <br />Sto <br />21+16 <br />(Lt) <br />12 <br />LF <br />Sta <br />23+21 <br />to <br />Sto <br />23+27 <br />(Lt) <br />6 <br />LF <br />Sta <br />29+00 <br />to <br />Sta <br />29+52 <br />(Lt) <br />52 <br />LF <br />Sta <br />32+96 <br />to <br />Sta <br />33+90 <br />(Lt) <br />94 <br />LF <br />Sta <br />35+80 <br />to <br />Sta <br />36+12 <br />(Lt) <br />32 <br />LF <br />Sta <br />35+70 <br />to <br />Sto <br />36+12 <br />(Rt) <br />42 <br />LF <br />Total <br />279 <br />LF <br />MINOR CONCRETE <br />(DRIVEWAY) <br />LOCATION QUANTITY <br />Sta 33+32 221X4' (Lt) 10 SQYD <br />Sta 35+96 16'X4' (LT) 7 SQYD <br />Sto 36+00 201X4' (RT) 9 SQYD <br />Total 26 SQYD <br />COUNTY OF SAN JOAQUIN NO SCALE <br />DRAWN BY DATE PROJECT ENGINEER DATE CHECKED <br />Enrique SiCva 3/16 �4s+c �iZjl�% �/ G 5 f 0"^'j <br />SUMMARY OF <br />QUANTITIES <br />DATE <br />DETECTABLE WARNING <br />SURFACE <br />LOCATION QUANTITY <br />INTERSECTION CHRISTINA AVE/KIRK AVE <br />Northeast Corner 1 EA <br />Southeast Corner 1 EA <br />Total 2 EA <br />WEST COUNTRY CLUB RECONSTRUCTION PHASE 7 I Sheet No. <br />(Christina Avenue: Kirk Avenue to Ryde Avenue) 7 of 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.