Laserfiche WebLink
�m <br />N <br />� <br />m <br />a, <br />n <br />>N'm <br />E <br />w <br />C <br />U <br />Inst <br />Limits of Clearing and Grubbing and Mailbox Relocation <br />10' <br />Exist <br />10' <br />Existing Roadway 0.17' HMA (Type A) <br />Overlay <br />TYPICAL SECTION <br />John St Ste 10+50 to Ste 12+30 @ Ste 12+60 to Ste 19+37 <br />Morrison Ave Ste 10+12 to Ste 13+99 & Ste 14+19 to Ste 18+17 <br />Sierra Ln : Ste 10+12 to Ste 14+07 & Ste 14+27 to Ste 18+02 <br />Const <br />Limits of Clearing and Grubbing <br />xisting <br />— — Surface <br />I <br />0 <br />DO <br />( 0.25' E 0.25' below Lip <br />Existing AC C)E`o 25' xisting <br />Frontage 3 Surface o <br />Surface —N0_—_ ----� <br />0.25' HMA LExisting Roadway Var Depth Planing — J Existing CG&S <br />SHOULDER DETAIL (Type A) AC Pavement SHOULDER DETAIL <br />with Paved Frontage with Curb, Gutter & Sidewalk <br />TYPICAL SECTION <br />John St : Ste 10+10 to Ste 10+50 <br />Sierra Ln : Ste 18+02 to Ste 19+55 <br />COUNTY OF SAN JOAQUIN <br />NO SCALE <br />I.Jill �r��rzus��ctI <br />aiae�acimmaa:��. <br />(John <br />GENERAL NOTES: <br />1. 0.17' Hot Mix Asphalt Overlay must be placed in one (1) layer with <br />Geosynthetic Pavement Interlayer (Paving Fabric) placed on existing surface. <br />Z. 0.25' Hot Mix Asphalt Overlay must be place in two (2) layers of <br />approximately equal thickness. <br />3. Placement of Hot Mix Asphalt Overlay must not begin until the Hot Mix <br />Asphalt used in Pavement Repair has been in place for a minimum of 18 <br />hours. <br />4. Placement of Hat Mix Asphait Driveways must not begin until the Hot Mix <br />Asphalt used for Mainline Paving has been completed. <br />5. Existing highway and utility facilities must remain in place unless otherwise <br />noted. <br />6. Existing trees, shrubs, fences, mailboxes and other frontage improvements <br />must remain in place unless otherwise noted. <br />7. Existing drainage facilities must remain in place, unless otherwise noted. The <br />Contractor must conduct earthwork operations so as not to modify or <br />obstruct the existing drainage. <br />8. The Contractor will be responsible for adequately scheduling inspection and <br />testing of all facilities constructed under this contract with a minimum 24 <br />hour notice to the County. All testing must conform to the Standard <br />Specifications. All re -testing will be paid by the Contractor. <br />9. The Contractor must exercise due caution and carefully preserve survey bench <br />marks, control points, reference points and all survey stakes, and must bear <br />ani expenses for replacement and/or errors caused by their unnecessary loss <br />or disturbance. <br />10. The Contractor must notify the City of Stockton <br />Municipal Utilities <br />Department at (209) 937-8725 seventy two (72) hours in advance of <br />adjusting the City's facilities to finished grade. Refer to the City's Standards <br />for adjusting facilities to grade. <br />11. The Contractor is to remove and dispose all existing Thermoplastic Pavement <br />Markings as shown on the Plans. The cost of this work is to be included in the <br />various items of work involved. <br />12. The Contractor must take necessary precautions to prevent any damage to <br />stamped asphalt concrete crosswalk areas at Sierra Lane and Waterloo Road <br />intersection. In the event that such damage should occur from the <br />Contractor's operations, the Contractor shall repair or replace or bring to <br />original condition the damaged stamped asphalt concrete crosswalk at the <br />Contractor's expense. <br />13. Hand grinding of Asphalt Concrete pavement will be required next to the lip <br />of gutter and at locations where existing highway and utility facilities are <br />within the Planing Asphalt Concrete Pavement and Pavement Repair limits. <br />Payment for hand grinding will be considered as included in the contract unit <br />price paid for Planing Asphalt Concrete Pavement. <br />14. Payment for Saw Cutting asphalt concrete frontages will be considered as <br />included in the contract unit price paid for Planing Asphalt Concrete <br />Pavement. <br />R'EA STREETS KtSU`KFAGING sheet No. <br />Morrison Avenue &Sierra Lane) 2 of 8 <br />