GENERAL NOTES <br />1. 0.17' HMA Overlay must be placed in one (1) layer. <br />2. Placement of HMA Overlay must not begin until the HMA used in Pavement Repair <br />has been in place for a minimum of 18 hours. <br />3. Placement of HMA Driveways must not begin until the HMA used for Mainline Paving <br />has been completed. <br />4. Existing highway and utility facilities must remain in place unless otherwise noted. <br />5. Existing trees, shrubs, fences, mailboxes and other frontage improvements must remain <br />in place unless otherwise noted. <br />6. Existing drainage facilities must remain in place unless otherwise noted. The Contractor <br />must conduct earthwork operations so as not to modify or obstruct the existing drainage. <br />7. All Earthwork, except for final shoulder grading, must be completed prior to placing the <br />final layer of HMA Pavement. No Shoulder Backing material will be deposited or drifted <br />on the final layer of HMA surfacing. Where the shoulder placement exceeds 0.50' in <br />thickness, the Shoulder Backing must be placed in two (2) or more fully compacted layers. <br />8. Shoulder Backing material at all intersection radii must receive Penetration Treatment at <br />0.25 GAL/SQYD. Limits of the Penetration Treatment work must be confined to intersection <br />radii plus fifty feet (50') in each direction or to the intersection conform. <br />Shoulder Detail <br />See Sheet 7 <br />16 <br />ETW <br />— 4' <br />57 M <br />Var Depth-' <br />HMA Overlay(TYP) <br />COUNTY OF SAN JOAQUIN <br />DRAWN BY <br />�. Gam6ini/S. Castaneora <br />Const <br />I <br />i <br />Limits of Clearinq and Grubbin <br />I <br />Limits of I HMA Overl <br />12' <br />v <br />0.17' HMA <br />Overlay <br />9. The Contractor will be responsible for adequately scheduling inspection and testing of all <br />facilities constructed under this contract with a minimum 24 hours notice to the County. <br />All testing must conform to the Standard Specifications. All re—testing will be paid by <br />the Contractor. <br />10. The Contractor must notify the City of Stockton at (209) 937-5658 72 hours in advance <br />of adjusting the City of Stockton's facilities to finished grade. Refer to the City of Stockton <br />Standards for adjusting facilities to grade. <br />11. The Contractor must obtain all permits and licenses required for the construction and <br />completion of the project, and must perform all work in accordance with the requirements <br />and conditions of all permits and approvals applicable to the project. <br />12. Hand grinding of AC pavement will be required at locations where existing highway and <br />utility facilities are within the Planing AC and Pavement Repair limits. Payment for hand <br />grinding must be considered as included in the contract unit price paid for Planing AC <br />Pavement, <br />13. The Contractor must exercise due caution and carefully preserve survey bench marks, <br />control points, reference points and all survey stakes, and must bear all expenses for <br />replacement and/or errors caused by their unnecessary loss or disturbance. <br />EP <br />16' Shoulder Detail <br />ETW See Sheet 7 <br />12' 4' <br />ch Existing 57� <br />TYPICAL SECTION <br />Washington Street: Sta 10+15 to Sta 53+30 <br />Existing Roadway <br />No SCALE I TYPICAL SECTION A <br />GENERAL NOTES <br />I�Ce71�I�I��� <br />CHECKED <br />David Mendoza <br />RCE 42581 <br />WASHINGTON STREET RESURFACING Sheet No. <br />(Anteros Avenue to Walker Lane) 1 2 of 9 <br />